FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A.
General Details
A-1.
Project Details
(i). Proposal No. :
FP/UK/IRRIG/154975/2022
(ii). Name of Project for which Forest Land is required :
Construction of sprinkler based lift Irrigation for Papariyan Taulibhood, Langha, Lower Pipalsar of village Pashta and Rudrapur
(iii). Short narrative of the proposal and Project/scheme for which the forest land is required :
This project will facilitate irrigation water for Papariyan Taulibhood Lower Pipalsar Pasta and Rudrapur villages.
(iv). State :
Uttarakhand
(v). Category of the Proposal :
Irrigation
(vi). Shape of forest land proposed to be diverted :
Linear
(vii). Estimated cost of the Project(Rupees in lacs) :
1612
(viii). Area of forest land proposed for diversion(in ha.):
0.18
(ix). Non-forest land required for this project(in ha.):
0.67
(x). Total period for which the forest land is proposed to be diverted(in years):
50
A-2.
Details of User Agency
(i). Name :
EXECUTIVE ENGINEER TUBEWELL DIVISION
(ii). Address1 :
Tubewell Division, Irrigation Deptt. Maharani Bagh, GMS Road, Dehradun.
(iii). Address2 :
NIL
(iv). State :
Uttarakhand
(v). District :
Dehradun
(vi). Pin :
248006
(vii). Landmark :
NIL
(viii). Email address :
eetubwdeh-irri-uk@gov.in
(ix). Landline Telephone No. :
0--
(x). Fax No. :
0-
(xi). Mobile No. :
7017408256
(xii). Website (if any) :
NIL
(xiii). Legal status of User Agency :
State Government
A-3.
Details of Person Making Application
(i). First Name:
Satye
(ii). Middle Name:
Singh
(iii). Last Name:
Chauhan
(iv). Gender:
Male
(v). Designation:
Assistant Engineer
(vi). Address 1:
Office Of the Executive Engineer, Tubewell Division, Maharani Bagh, GMS Road, Dehradun.
(vii). Address 2:
NIL
(viii). State:
Uttarakhand
(ix). District:
Dehradun
(x). Tehsil:
Dehradun
(xi). Pin:
248006
(xii). Landmark:
NIL
(xiii). Email Address:
satyesinghchauhan@gmail.com
(xiv). Landline Telephone No.:
135-276321
(xv). Fax No.:
NIL
(xvi). Mobile No.:
8126686595
(xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B.
Details of land required for the Project
B-1.
Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no
Proposal Status.
Proposal No.
Moef File No.
Area Proposed for Diversion(Ha.)
Area Diverted(Ha.)
Date of In-Principle Approval
Date of Final Approval
NIL
B-2.
Details of forest land proposed to be diverted
B-2.1
Details of Divisions involved
Details of Divisions involved
S.no
Division Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Soil Conservation,Kalsi
0.18
0.67
Total
0.18
0.67
B-2.2
Details of Districts involved
District wise breakup
S.no
District Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Dehradun
0.18
0.67
Total
0.18
0.67
B-2.3
Village wise breakup
Villages wise breakup
S.no
Village
Forest Land(ha.)
Non-Forest Land(ha.)
1
Kata Patthar
0
0.087
2
Dumet gaon
0
0.12
3
Papriyan
0
0.13
4
Tauli Bhood
0
0.22
5
Langha
0
0.083
6
Dumet Black 1 b
0.18
0
7
Pashta (Pipalsar)
0
0.03
Total
0.18
0.67
B-2.4
Component wise breakup
Component wise breakup
S.no
Component
Forest Land(ha.)
Non-Forest Land(ha.)
1
Pipe Line
0.18
0.67
Total
0.18
0.67
C.
Maps of forest land proposed to be diverted
Division 1. : Soil Conservation,Kalsi
(i). Area of forest land proposed to be diverted(in ha.) :
0.18
(ii). Nature of the Project:
Linear
(b). No. of Segments :
One
Segment wise details
Segments
Segment Area(in ha.)
Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.
0.18
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D.
Justification for locating the Project in forest land and details of alternatives examined:
(i). Copy of note containing justification for locating the Project in forest land:
(ii). Whether a copy of map indicating location of alternative examine is required to be provided:
No
(a). Reason for not providing such map:
River is only source to provide water.
E.
Employment likely to be generated
(i). Whether the Project is likely to generate employment ?:
Yes
(ii). Permanent/Regular Employment(Number of persons):
0
(iii). Temporary Employment(Number of person-days):
200
F.
Displacement of People due to the Project, if any
(i). Whether Project involves displacement?:
No
G.
Details of Cost-Benefit analysis for the Project
(i). Whether the Project requires Cost-Benefit analysis?:
No
H.
Status of Environmental Clearance
(i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? :
No
I.
Status of Wildelife Clearance
(i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? :
No
J.
Applicability of special provisions governing Scheduled Areas
(i).Whether the Project or a part thereof is located in a Scheduled Area? :
No
K.
Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
(i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? :
Yes
(a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L.
Details of land identified for Compensatory Afforestation
(i). Whether non-forest or Revenue forest land is required to be provided by User Agency?:
Not Applicable
(ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?:
Not Applicable
(iii) . Reason for not providing Non-Forest Land:
Not Applicable
M.
Hydel/Irrigation/Multipurpose Project
(i). Installed power generation capacity of the Project(in MW):
0
(ii). Total command area of the Project(in ha.):
0
Additional information Details
Documents
S.No
Documents
Remarks
1
Administrative and Financial Sanction
2
Justificatin
3
joint inspection report
4
Land Schedule
5
Length and Width
6
Certificate reg no alternative land
7
Certifiate reg Trees
8
No tree felling
9
Bar Chart
10
Certificate reg Geogolist report
11
Benefited Villages
12
Certificate of Environment clearance
13
Flora and wild life certificate
14
Noalternative land and req of minimum land certificate
15
Not a part of NP and distance from NP
16
SIR
17
Undertaking for Muck disosal
18
Undertaking for boudary demacation
19
Task Force Report
20
Standerd Condition
21
Estimate of 100 trees plantation
22
Fact Sheet
23
Vacant area plantation
24
General Abstract of cost
25
Prativedan
26
Work not started
27
Minimum and No alternative land available
28
Site specific project certificate
29
FRA2006 Katatpatthar_Combine_complete
30
Index
31
Under Taking to Pay Additional NPV Amount
32
NPV Calculated by DFO
33
Certificate of Dia
34
Form A part 1
35
Form A part 2
36
Digital Map
37
Geo-Referaence Map
38
Letter to DFO reg. EDS
Print