FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/TR/ROAD/143781/2021   (ii). Name of Project for which Forest Land is required : Proposal for diversion of forest land for widening/improvement of Lalchara- Kanchanpur Section (Package-2) of NH-44(A) to 2-Laning with Paved Shoulders under Dhalai, Unakoti & North Tripura District   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Ministry of Road Transport and Highways (MORT&H), Government of India has decided to take up the development, maintenance and management of various National Highway stretches/Corridors as the intensity of traffic has increased or is likely to increase significantly .   (iv). State : Tripura   (v). Category of the Proposal : Road   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 460000   (viii). Area of forest land proposed for diversion(in ha.): 82.6044   (ix). Non-forest land required for this project(in ha.): 17.48144   (x). Total period for which the forest land is proposed to be diverted(in years): 99
A-2. Details of User Agency
  (i). Name : PMU AGARTALA   (ii). Address1 : O/o Chief Engineer, Ministry of Road Transport & Highways   (iii). Address2 : P.N. Complex, Gurkhabasti, Agartala   (iv). State : Tripura   (v). District : District West   (vi). Pin : 799006   (vii). Landmark : Pragna Bhawan   (viii). Email address : cepmuagt@gmail.com   (ix). Landline Telephone No. : 381-2328776   (x). Fax No. : 381-381   (xi). Mobile No. : 8415928698   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : Central Government
A-3. Details of Person Making Application
  (i). First Name: Dilbagh   (ii). Middle Name: Singh   (iii). Last Name: Dhanda   (iv). Gender: Male   (v). Designation: General Manager ( Project)   (vi). Address 1: Office of General Manager (Projects) National Highways Infrastructural Development Corporation Ltd.   (vii). Address 2: P.N. Complex, Gurkhabasti, Agartala   (viii). State: Tripura   (ix). District: District West   (x). Tehsil: NIL   (xi). Pin: 799006   (xii). Landmark: Pragna Bhawan   (xiii). Email Address: akilmorth@gmail.com   (xiv). Landline Telephone No.: 381-2328776   (xv). Fax No.: 03812308594   (xvi). Mobile No.: 9818605517   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
Proposal Submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
1InprincipleFP/TR/ROAD/33689/20183-TR C 073/2018-SHI 3814-1579.75619679.75619620 Feb 2019
Total 79.756196 79.756196
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Dhalai District Forest30.46657.5736
2.UnoKoti District Forest41.01034E-05
3.North District Forest11.12769.9078
Total82.604417.48144
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Dhalai District30.46657.5736
1.Unakoti41.01034E-05
3.North Tripura11.12769.9078
Total82.604417.48144
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Jarulchara4.68770.7527
2Purba Masli06.5112
3Deo RF (Dhalai)22.80850.3097
4Deo RF (Unakoti)26.50430
5Rabiraipara14.5064E-05
6Ujan MAchmara RF11.12768.6432
7Kanchanchara00.7926
8Kanchanpur00.472
9Manu Chailengta RF2.97030
Total 82.6044 17.48144
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Road82.604417.48144
Total 82.6044 17.48144
C. Maps of forest land proposed to be diverted
Division 1. : Dhalai District Forest
  (i). Area of forest land proposed to be diverted(in ha.) : 30.4665   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.30.4665    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
Division 2. : UnoKoti District Forest
  (i). Area of forest land proposed to be diverted(in ha.) : 41.0103   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.41.0103    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
Division 3. : North District Forest
  (i). Area of forest land proposed to be diverted(in ha.) : 11.1276   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.11.1276    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: No   (a). Reason for not providing such map: Certificate Attached
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 0   (iii). Temporary Employment(Number of person-days): 126000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: Yes   (a). Copy of Cost-Benefit analysis:
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : Yes
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Not Applicable   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Not Applicable   (iii) . Reason for not providing Non-Forest Land: Not Applicable
Additional information Details
Documents
S.No Documents
Remarks
1UNDERTAKING FOR COMPENSATORY AFFORESTATION/PENAL
2UNDERTAKING FOR ITEM WISE BREAKUP OF FOREST AREA PROPOSED FOR DIVERSION
3UNDERTAKING FOR CONSERVATION OF FLORA/FAUNA DURING CONSTRUCTION OF ROAD
4UNDERTAKING FOR NO WILDLIFE SANCTUARY/NATIONAL PARK NEARBY PROJECT ROAD
5CERTIFICATE FOR NO ADDITIONAL IMPACT DURING CONSTRUCTION OF ROAD OTHER THAN DIVERTED LAND
6UNDERTAKING FOR NO OTHER FEASIBLE ALTERNATIVE & DIVERSION OF MINIMUM FOREST LAND
7UNDERTAKING FOR PAYMENT OF NPV/ADDL. NPV OF FOREST LAND & TREES (CUTTING/FELLING)
8CERTIFICATE FOR REQUIREMENT OF MUCK DISPOSAL PLAN
9UNDERTAKING FOR SPECIES OF TREES AFFECTED
10UNDERTAKING FOR NO CHANGES IN STATUTORY POSITION OF DIVERTED FOREST LAND
11UNDERTAKING FOR USE OF FOREST LAND
12UNDERTAKING FOR USE OF ANY MATERIAL FROM SURROUNDED FOREST LAND DURING CONSTRUCTION OF ROAD
13UNDERTAKING FOR WASTE MANAGEMENT DURING CONSTRUCTION ACTIVITY
14AREA STATEMENT
15CADASTAL MAP OF MANU CHAILENGTA RF SHEET NO.2 (DHALAI DIST)
16CADASTAL MAP OF JARULCHARA SHEET NO.4 (DHALAI DIST)
17CADASTAL MAP OF JARULCHARA SHEET NO.2 (DHALAI DIST)
18CADASTAL MAP OF DEO RF SHEET NO.17 (DHALAI DIST)
19CADASTAL MAP OF DEO RF SHEET NO.16 (DHALAI DIST)
20CADASTAL MAP OF DEO RF SHEET NO.19 (DHALAI DIST)
21CADASTAL MAP OF DEO RF SHEET NO.15 (DHALAI DIST)
22CADASTAL MAP OF UJAN MACHMARA SHEET NO.26 (NORTH DIST)
23CADASTAL MAP OF UJAN MACHMARA SHEET NO.27 (NORTH DIST)
24CADASTAL MAP OF UJAN MACHMARA SHEET NO.32 (NORTH DIST)
25CADASTAL MAP OF UJAN MACHMARA SHEET NO.29 (NORTH DIST)
26CADASTAL MAP OF UJAN MACHMARA SHEET NO.30 (NORTH DIST)
27CADASTAL MAP OF DEO RF SHEET NO.16 (UNAKOTI DIST)
28CADASTAL MAP OF DEO RF SHEET NO.17 (UNAKOTI DIST)
29CADASTAL MAP OF DEO RF SHEET NO.18 (UNAKOTI DIST)
30CADASTAL MAP OF DEO RF SHEET NO.19 (UNAKOTI DIST)
31CADASTAL MAP OF DEO RF SHEET NO.20 (UNAKOTI DIST)
32CADASTAL MAP OF RABIRAIPARA SHEET NO.2 (UNAKOTI DIST)
33CADASTAL MAP OF RABIRAIPARA SHEET NO.3 (UNAKOTI DIST)
34CADASTAL MAP OF RABIRAIPARA SHEET NO.4 (UNAKOTI DIST)
35CADASTAL MAP OF RABIRAIPARA SHEET NO.5 (UNAKOTI DIST)
36MUCK DISPOSAL PLAN & REPORT
37SEGMENT COORDINATES
38PROPOSED ROW DETAIL
39PROJECT DETAILS
40TYPICAL CROSS SECTION OF PROJECT ROAD
41LIST OF CD STRUCTURES ON MAJOR & MINOR STREAMS/RIVER
42MAP SHOWING ALIGNMENT & CD STRUCTURES ON MAJOR & MINOR STREAMS/RIVER
43LINEAR MAP
44Detail Breakup of Employment Generation
45Detail of Existing ROW
46GIS Report by O/o Nodal Officer, FCA
47Centre Line & Proposed ROW Coordinates
48Start & End Point Coordinates
49Forest & Non Forest Detail
50PATCH WISE COORDINATE DETAILS
51Compliance as per letter of CCF