FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A.
General Details
A-1.
Project Details
(i). Proposal No. :
FP/TR/Others/18888/2016
(ii). Name of Project for which Forest Land is required :
Proposal for diversion of 1.368 Hact.(3.379 Acre) forest land for construction of Drill Site,Waste pit,Drill Site Accommodation,TSR Camp and its approach road for location called Dev2A.
(iii). Short narrative of the proposal and Project/scheme for which the forest land is required :
Construction of Drill Site,Waste pit,Drill Site Accommodation,TSR Camp and its approach road for location called Dev2A where drilling has been planned for exploration of Hydrocarbon. The area has been found geologically prospective on the basis of seismic and geophysical survey.
(iv). State :
Tripura
(v). Category of the Proposal :
Others
(vi). Shape of forest land proposed to be diverted :
Non Linear
(vii). Estimated cost of the Project(Rupees in lacs) :
5700
(viii). Area of forest land proposed for diversion(in ha.):
1.368
(ix). Non-forest land required for this project(in ha.):
0.93
(x). Total period for which the forest land is proposed to be diverted(in years):
50
A-2.
Details of User Agency
(i). Name :
JUBILANT OIL AND GAS PVT LTD
(ii). Address1 :
Jubilant Oil and Gas Pvt Ltd, Shree Niketan Guest House, Nutan nagar, Airport Road, Agartala, Tripura-799009.
(iii). Address2 :
Jubilant Oil and Gas Pvt Ltd, Plot No.-15, Knowledge Park-II, Greater Noida, Dist-Gautam Budh nagar, U.P. 201306.
(iv). State :
Tripura
(v). District :
District West
(vi). Pin :
799009
(vii). Landmark :
Near Nutan Nagar Market.
(viii). Email address :
dinesh_sawan@jubilantenergy.com
(ix). Landline Telephone No. :
381-2342491
(x). Fax No. :
NIL
(xi). Mobile No. :
8974036116
(xii). Website (if any) :
www.jubilantenergy.com
(xiii). Legal status of User Agency :
Joint Venture(Pvt+Govt.)
A-3.
Details of Person Making Application
(i). First Name:
Dinesh
(ii). Middle Name:
Kumar
(iii). Last Name:
Sawan
(iv). Gender:
Male
(v). Designation:
Base Manager
(vi). Address 1:
Jubilant Oil and Gas Pvt Ltd, Shree Niketan Guest House, Nutan nagar, Airport Road, Agartala, Tripura-799009.
(vii). Address 2:
Jubilant Oil and Gas Pvt Ltd, Plot No.-15, Knowledge Park-II, Greater Noida, Dist-Gautam Budh nagar, U.P. 201306.
(viii). State:
Tripura
(ix). District:
District West
(x). Tehsil:
NIL
(xi). Pin:
799009
(xii). Landmark:
Near Nutan Nagar Market.
(xiii). Email Address:
dinesh_sawan@jubilantenergy.com
(xiv). Landline Telephone No.:
91-3812342491
(xv). Fax No.:
911207186240
(xvi). Mobile No.:
8974036116
(xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B.
Details of land required for the Project
B-1.
Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
Proposal Submitted in Past
S.no
Proposal Status.
Proposal No.
Moef File No.
Area Proposed for Diversion(Ha.)
Area Diverted(Ha.)
Date of In-Principle Approval
Date of Final Approval
1
Apporved
State Sl. No.2007/25 Dated 13/06/2007
No.3-TR B 113/2007-SHI/1388-90
0.238
0.238
04 Dec 2007
07 Jul 2008
2
Under Processing in MoEF
FP/TR/MIN/4/2014 Dated 27.11.2014
No.3-TR B 027/2015-SHI/631-32
7.757
0
3
Under Processing in MoEF
State Sl. No. 2014/10 of Dated 11.08.2014
No.3-TR B 025/2015-SHI/524-25
4.26
0
4
Under Processing in MoEF
State Sl. No. 2014/09 of Dated 05.08.2014
No.3-TR B 030/2015-SHI/842-43
4
0
5
Under Processing in MoEF
State Sl. No. 2014/08 of Dated 30.07.2014
No.3-TR B 024/2015-SHI/520-21
3.86
0
Total
20.115
0.238
B-2.
Details of forest land proposed to be diverted
B-2.1
Details of Divisions involved
Details of Divisions involved
S.no
Division Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
South District Forest
1.368
0.93
Total
1.368
0.93
B-2.2
Details of Districts involved
District wise breakup
S.no
District Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
South Tripura
1.368
0.93
Total
1.368
0.93
B-2.3
Village wise breakup
Villages wise breakup
S.no
Village
Forest Land(ha.)
Non-Forest Land(ha.)
1
Birendranagar
1.368
0.93
Total
1.368
0.93
B-2.4
Component wise breakup
Component wise breakup
S.no
Component
Forest Land(ha.)
Non-Forest Land(ha.)
1
Internal Road
0.269
0.228
2
Drivers Rest Room
0
0.012
3
Control Room
0
0.015
4
Offices
0
0.03
5
Medical Room
0
0.015
6
Chemical Shed
0
0.015
7
ETP
0
0.015
8
Vehicle and Trailor Parking
0
0.13
9
Cement Shed
0.001
0.0514
10
Pipe Racks
0.06
0
11
Misc Stores
0
0.015
12
Safety Stores
0
0.015
13
Fuel Oil Lube Store
0
0.015
14
Drilling Platform
0.2629
0.0971
15
Waste Pit
0.0573
0.0552
16
Mud Pit
0.1125
0
17
Flare Pit
0.042
0
18
VSP Pit
0.042
0
19
Water Pit
0.042
0
20
Generator Sets
0
0.015
21
Loging Unit
0
0.015
22
TSR Camp
0.1197
0
23
Drill Site Accomodation
0.1719
0
24
Open Area
0.178
0.189
25
Approach Road
0.008
0
Total
1.3663
0.9277
C.
Maps of forest land proposed to be diverted
Division 1. : South District Forest
(i). Area of forest land proposed to be diverted(in ha.) :
1.368
(ii). Nature of the Project:
Non Linear
(a). No. of patches :
One
Patch wise details
Patch No.
Area of Patch(in ha.)
Kml File of Patches
To view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.
1.368
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D.
Justification for locating the Project in forest land and details of alternatives examined:
(i). Copy of note containing justification for locating the Project in forest land:
E.
Employment likely to be generated
(i). Whether the Project is likely to generate employment ?:
Yes
(ii). Permanent/Regular Employment(Number of persons):
6
(iii). Temporary Employment(Number of person-days):
20
F.
Displacement of People due to the Project, if any
(i). Whether Project involves displacement?:
No
G.
Details of Cost-Benefit analysis for the Project
(i). Whether the Project requires Cost-Benefit analysis?:
No
H.
Status of Environmental Clearance
(i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? :
Yes
(a). Status of the Environmental Clearance to the Project:
EC under process
(ii). Environmental Clearance File No.:
J-11011/248/2013-IAII(I)
I.
Status of Wildelife Clearance
(i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? :
No
J.
Applicability of special provisions governing Scheduled Areas
(i).Whether the Project or a part thereof is located in a Scheduled Area? :
No
K.
Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
(i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? :
Yes
(a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L.
Details of land identified for Compensatory Afforestation
(i). Whether non-forest or Revenue forest land is required to be provided by User Agency?:
No
(ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?:
No
(iii) . Reason for not providing Non-Forest Land:
Others
Additional information Details
Documents
S.No
Documents
Remarks
1
Certificate for payment of cost of Compensatory Afforestation
2
Certificate for Payment of Net Present Value (NPV)
3
Certificate for Minimum requirement of Area
4
Certificate for Justification of the area required
5
Certificate for Selection of proposed site for Drillsite Drillsite Accommodation Wastepit TSR CAMP and approach road location called Dev2A
6
Land Statement of Drillsite Accommodation Wastepit TSR CAMP and approach road location called Dev2A
7
Certificate for Purpose wise Breakup of utilization of proposed land
8
Certificate for Short Narrative of Proposal and project scheme
9
Environmental Clearance Certificate
10
Layout Plan of proposed site Dev2A
11
Mauja Map of proposed site Dev2A
12
Undertaking for Sufficient of Land parcel for Proposed Drillsite Drillsite Accommodation Wastepit TSR Camp and approach road for proposed site Dev2A
13
Letter of Intent
14
Certificate in connection competence authority of preson making application
15
Certificate for Alternative examine
16
Undertaking for Justification for Extension
17
Prospecting Activities undertaken samples report
18
Communication letter with Survey of India in connection Toposheet
19
Certificate in connection online submission of proposal
20
Undertaking for forest area required in future for exploration activities
21
Undertaking in connection with GAIL,Jubilant and Govt of India (MoPNG)
22
Undertaking to pay extraction charges of trees removed from the forest land involved
23
Certificate for distance from Wild Life Sanctuary
24
Acknowledgement copy of Letter to concern DM Collector to issue the RFR Certificate
25
Georeferenced Map of Proposed site
26
Response to Forest letter dated 6 Feb 2021
27
Response to DFO letter 30.05.2022
28
Response to DFO EDS dated 1 July 2023
Print