FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/SK/ROAD/115643/2020   (ii). Name of Project for which Forest Land is required : Rehabilitation and Up-gradation to 2 lane with Paved shoulder of NH-510 (Singtam-Tarku-Rabongla-Legship-Gyalshing) Package - IV (Design Chainage from Km 33+600 to Km 58+840) in the state of Sikkim in   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Rehabilitation and Up-gradation to 2-Lane with Paved Shoulder of NH-510(Singtam-Tarku-Rabongla-Legship-Gyalshing) (Design Chainage from Km 33+600 to Km 58+840) in the State of Sikkim in EPC Mode-(Package-IV).   (iv). State : Sikkim   (v). Category of the Proposal : Road   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 24864   (viii). Area of forest land proposed for diversion(in ha.): 13.6755   (ix). Non-forest land required for this project(in ha.): 11.5667   (x). Total period for which the forest land is proposed to be diverted(in years): NIL
A-2. Details of User Agency
  (i). Name : MORTH (NHIDCL)   (ii). Address1 : 8th Mile New Gyalshing   (iii). Address2 : NIL   (iv). State : Sikkim   (v). District : Gyalshing   (vi). Pin : 737111   (vii). Landmark : Near SSB Camp   (viii). Email address : arbindsingh60@gmail.com   (ix). Landline Telephone No. : 0-   (x). Fax No. : 0-   (xi). Mobile No. : 9615539826   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : Central PSU
A-3. Details of Person Making Application
  (i). First Name: ARBIND   (ii). Middle Name: KUMAR   (iii). Last Name: SINGH   (iv). Gender: Male   (v). Designation: General Manager   (vi). Address 1: 8th Mile Gyalshing   (vii). Address 2: NIL   (viii). State: Sikkim   (ix). District: Gyalshing   (x). Tehsil: Gyalshing   (xi). Pin: 737111   (xii). Landmark: Near SSB camp   (xiii). Email Address: arbindsingh60@gmail.com   (xiv). Landline Telephone No.: 0-   (xv). Fax No.: NIL   (xvi). Mobile No.: 9615539823   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.South Territorial13.675511.5667
Total13.675511.5667
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Namchi13.675511.5667
Total13.675511.5667
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Lingzo1.22.2668
2Legship1.77124.262
3Bakhim0.11521.4048
4Rayong10.58913.6331
Total 13.6755 11.5667
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Km 33.600 to Km 58.84013.675511.5667
Total 13.6755 11.5667
C. Maps of forest land proposed to be diverted
Division 1. : South Territorial
  (i). Area of forest land proposed to be diverted(in ha.) : 13.6755   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.13.6755    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: No   (a). Reason for not providing such map: No data available
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 50   (iii). Temporary Employment(Number of person-days): 2500
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: Yes   (a). Copy of Cost-Benefit analysis:
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Not Applicable   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Not Applicable   (iii) . Reason for not providing Non-Forest Land: Not Applicable
Additional information Details
Documents
S.No Documents
Remarks
1Scan copy of Joint inspection report
2Scan copy of Certificate of Undertaking
3Copy of DPR
4Scan copy of Form A
5Joint Inspection Report as per Format PKG IV
6GPS Polygon Coordinate PKG IV
7Cost Benefit Analysis PKG IV
8Certificates of Undertakings for project not falling within 100 Km of LAC
9Certificates of Undertakings for Payment NPV of Forest Area
10Certificates of Undertakings for No Wildlife Area
11Certificates of Undertakings for no starting of any activity without sanction from Competent Authority
12Certificates of Undertakings for no other Feasible Alternative and Diversion of Barest Minimum Forest Land
13Certificates of Undertakings for no muck disposal in Forest land without sanction from Competent Authority
14Certificates of Undertakings for Minimum Use of Forest Land
15Certificates of Undertakings for Cost of CA
16Tree enumeration
17Muck management plan
18Joint inspection report
19Sketch of proposed road
20CA map
21Village wise breakup
22Geo-reference Map
23Toposheet
24Justification
25Cost benefit analysis
26FRA