Project Details
(i). Proposal No. :
FP/RJ/WATER/31563/2018
(ii). Name of Project for which Forest Land is required :
LAYING FOR TRANSMISSON MAIN PIPE LINE FROM MALLAH HEADWORKS BHARATPUR TO KUCHAWATI CWR
(iii). Short narrative of the proposal and Project/scheme for which the forest land is required :
FOREST CLEARANCE FOR LAYING OF 1000MM TRANSMISSON MAIN PIPE LINE IN ROAD ALONG BOUNDARY NH-11 CHAINAGE NO.56/530 TO 60/530 AND MANDHERA FOREST BLOCK CHAMBAL-DHOLPUR-BHARATPUR WATER SUPPLY PROJECT FROM MALLAH HEADWORKS BHARATPUR TO KUMER ,DEEG,KAMAN PAHARI AND NAGAR.
(iv). State :
Rajasthan
(v). Category of the Proposal :
Drinking Water
(vi). Shape of forest land proposed to be diverted :
Linear
(vii). Estimated cost of the Project(Rupees in lacs) :
27808
(viii). Area of forest land proposed for diversion(in ha.):
0.9704
(ix). Non-forest land required for this project(in ha.):
4.9329
(x). Total period for which the forest land is proposed to be diverted(in years):
99
A-2.
Details of User Agency
(i). Name :
EXECUTIVE ENGINEER PHED, PROJECT DIVISION DEEG, (BHARATPUR) RAJ.
(ii). Address1 :
Executive Engineer
(iii). Address2 :
PHED Project Division Deeg
(iv). State :
Rajasthan
(v). District :
Bharatpur
(vi). Pin :
321203
(vii). Landmark :
Near SDM Office
(viii). Email address :
cdbpdeeg@gmail.com
(ix). Landline Telephone No. :
5644-297003
(x). Fax No. :
5644-
(xi). Mobile No. :
9414371718
(xii). Website (if any) :
NIL
(xiii). Legal status of User Agency :
State Government
A-3.
Details of Person Making Application
(i). First Name:
Kailash
(ii). Middle Name:
Chandra
(iii). Last Name:
Bairwa
(iv). Gender:
Male
(v). Designation:
EXECUTIVE ENGINEER
(vi). Address 1:
Executive Engineer
(vii). Address 2:
PHED Project Division Deeg
(viii). State:
Rajasthan
(ix). District:
Bharatpur
(x). Tehsil:
Deeg
(xi). Pin:
321203
(xii). Landmark:
Near SDM office
(xiii). Email Address:
cdbpdeeg@gmail.com
(xiv). Landline Telephone No.:
5644-297003
(xv). Fax No.:
NIL
(xvi). Mobile No.:
9414371718
(xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B.
Details of land required for the Project
B-1.
Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
Proposal Submitted in Past
S.no
Proposal Status.
Proposal No.
Moef File No.
Area Proposed for Diversion(Ha.)
Area Diverted(Ha.)
Date of In-Principle Approval
Date of Final Approval
1
Inprinciple
FP/RJ/WATER/1458/2010
7-RJB017/2011-LUC
0.585
0.585
02 Sep 2011
Total
0.585
0.585
B-2.
Details of forest land proposed to be diverted
B-2.1
Details of Divisions involved
Details of Divisions involved
S.no
Division Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Bharatpur Territorial
0.9704
4.9329
Total
0.9704
4.9329
B-2.2
Details of Districts involved
District wise breakup
S.no
District Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Bharatpur
0.9704
4.9329
Total
0.9704
4.9329
B-2.3
Village wise breakup
Villages wise breakup
S.no
Village
Forest Land(ha.)
Non-Forest Land(ha.)
1
MALLAH
0
0.167
2
SHRINAGAR
0.1233
0
3
RAMPURA
0.3375
0
4
JHILRA
0.1425
0.1575
5
GOLPURA
0
0.3375
6
KAMALPURA
0
0.531
7
MENA KA ADDLA
0
0.1913
8
GIRDHARIPURA
0
0.1582
9
MAHARASAR
0
0.4125
10
NAGLA GANGA
0
0.3518
11
BAILARA KALAN
0
0.42
12
KUMER
0
0.5475
13
BELAWAR
0
0.1725
14
SUPTHRO
0
0.2925
15
SALANT
0
0.4174
16
LODHA
0
0.2581
17
KUCHAWATI
0
0.2707
18
MANDERA
0
0.2025
19
CHAK KESOPURA
0.25275
0
20
RUNDH NARAYANPUR
0.1143
0
Total
0.97035
4.888
B-2.4
Component wise breakup
Component wise breakup
S.no
Component
Forest Land(ha.)
Non-Forest Land(ha.)
1
1000 MM DIA PIPE LINE
0.6033
0.0884
2
900 MM DIA PIPE LINE
0.3671
4.8445
Total
0.9704
4.9329
C.
Maps of forest land proposed to be diverted
Division 1. : Bharatpur Territorial
(i). Area of forest land proposed to be diverted(in ha.) :
0.9704
(ii). Nature of the Project:
Linear
(b). No. of Segments :
Two
Segment wise details
Segments
Segment Area(in ha.)
Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.
0.6033
View File
2.
0.3671
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D.
Justification for locating the Project in forest land and details of alternatives examined:
(i). Copy of note containing justification for locating the Project in forest land:
(ii). Whether a copy of map indicating location of alternative examine is required to be provided:
No
(a). Reason for not providing such map:
Main Pipe line along the NH-11 Row and SH-14 Road
E.
Employment likely to be generated
(i). Whether the Project is likely to generate employment ?:
Yes
(ii). Permanent/Regular Employment(Number of persons):
0
(iii). Temporary Employment(Number of person-days):
2400
F.
Displacement of People due to the Project, if any
(i). Whether Project involves displacement?:
No
G.
Details of Cost-Benefit analysis for the Project
(i). Whether the Project requires Cost-Benefit analysis?:
No
H.
Status of Environmental Clearance
(i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? :
No
I.
Status of Wildelife Clearance
(i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? :
No
J.
Applicability of special provisions governing Scheduled Areas
(i).Whether the Project or a part thereof is located in a Scheduled Area? :
No
K.
Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
(i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? :
Yes
(a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L.
Details of land identified for Compensatory Afforestation
(i). Whether non-forest or Revenue forest land is required to be provided by User Agency?:
Not Applicable
(ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?:
Not Applicable
(iii) . Reason for not providing Non-Forest Land:
Not Applicable
Additional information Details
Documents
S.No
Documents
Remarks
1
Administrative Sanction
2
AUTHORIZATION LETTER
3
Technical Sanction and Financial sanction
4
JUSTIFICATION FOR LOCATING THE PROJECT IN FOREST AREA
5
UNDERTAKING FOR CONSERVATION OF FLORA-FAUNA AND WILDLIFE ANIMALS DURING LAYING PIPE LINE
6
UNDERTAKING FOR FRA CERTIFICATE
7
UNDERTAKING FOR MUCK DISPOSAL DURING LAYING PIPE LINE ACTIVITY
8
UNDERTAKING FOR NO CHANGE’S IN STATUTORY POSITION OF DIVERTED FOREST LAND
9
UNDERTAKING FOR PAYMENT OF COST OF COMPENSATORY AFFORESTATION
10
UNDERTAKING FOR PAYMENT OF NET PRESENT VALUE OF FOREST AREA
11
UNDERTAKING FOR USE OF ANY MATERIAL FROM SURROUNDED FOREST LAND DURING DURING LAYING PIPE LINE
12
Project report
13
MAP SHOWING DIGITAL MAP OF REQUIRED FOREST LAND COORDINATE AND PROPOSED PIPE LINE ALINGMENT
14
MAP SHOWING GOOGLE IMAGANRY WITH FOREST LAND AND PROPOSED PIPE LINE ALINGMENT
15
PWD NOC
16
NH PERMISSION
17
Revenue Department Notification
18
EDS REPLY LETTER
19
CROSS SECTION
20
EDS REPLY 28-04-2018
21
MAP SHOWING FOR GEO REFERANCED SURVEY OF INDIA TOPOSHEET WITH FOREST LAND AND PROPOSED PIPE LINE ALINGMENT
22
BHARCHART
23
CERTIFICATE FOR MINIMUM USE OF FOREST LAND
24
CERTIFICATE NO ALTERNATIVE ROUTE
25
CROSS SECTION 900 MM DIA
26
EDS REPPLY LETTER
27
STATEMENT SHOWING DETAILS
28
jamabandi Nakal-chak kesupura
29
jamabandi Rundh Narayanpur
30
Villages MAP
Print