FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/RJ/TRANS/23277/2016   (ii). Name of Project for which Forest Land is required : “Construction of 11 kv Transmission Line Projects of Rajeev Gandhi Gram Vidyutikaran Yojana(RGGVY) in XII Plan for Between Shivshakti Stone Crusher Jinjhari to Village-Bhawan,Tehsil-Sojat,District Pali (Raj)”   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : 11 Kv S/C Transmission Line Shivshakti Stone Crusher Crossing Point Jhinjhari to at Bhabhan Village End point in Projects of Rajeev Gandhi Gram Vidyutikaran Yojana(RGGVY) in XII Plan total Route length 4.114 km   (iv). State : Rajasthan   (v). Category of the Proposal : Transmission Line   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 69.768   (viii). Area of forest land proposed for diversion(in ha.): 1.764   (ix). Non-forest land required for this project(in ha.): 1.1158   (x). Total period for which the forest land is proposed to be diverted(in years): 99
A-2. Details of User Agency
  (i). Name : JODHPUR VIDHYUT VITRAN NIGAM LTD   (ii). Address1 : NEW POWER HOUSE,INDUSTRIAL AREA,JODHPUR- RAJASTHAN   (iii). Address2 : NIL   (iv). State : Rajasthan   (v). District : Jodhpur   (vi). Pin : 342003   (vii). Landmark : KANKOODEEP GARDEN   (viii). Email address : aensojatroad1991@gmail.com   (ix). Landline Telephone No. : 291-2651200   (x). Fax No. : 291-2741870   (xi). Mobile No. : 9413359319   (xii). Website (if any) : nil   (xiii). Legal status of User Agency : State PSU
A-3. Details of Person Making Application
  (i). First Name: SHIVKESH   (ii). Middle Name: NIL   (iii). Last Name: JAREDA   (iv). Gender: Male   (v). Designation: ASSISTANT ENGINEER (O&M)   (vi). Address 1: OFFICE OF THE ASSISTANT ENGINEER (O&M),JODHPUR VIDHYUT VITRAN NIGAM LIMITED,SOJAT ROAD ,   (vii). Address 2: NIL   (viii). State: Rajasthan   (ix). District: Pali   (x). Tehsil: Sojat   (xi). Pin: 306103   (xii). Landmark: NIL   (xiii). Email Address: aensojatroad1991@gmail.com   (xiv). Landline Telephone No.: 2960-230399   (xv). Fax No.: NIL   (xvi). Mobile No.: 9413359319   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
Proposal Submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
1InprincipleFP/RJ/TRANS/13198/2014F.1(7)FOREST/20160.1920.19226 Oct 2015
2InprincipleFP/RJ/TRANS/14545/2015F.1(92)FOREST/20150.56130.561304 Nov 2015
3Under Processing in NBWLFP/RJ/719/2016FP/RJ/719/20160.070.07
Total 0.8233 0.8233
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Rajsamand Wildlife1.7641.1158
Total1.7641.1158
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Pali1.7641.1158
Total1.7641.1158
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Jhinjhari00.203
2Dhareshwar0.8820
3Pardi00.5726
4Bhabhan0.8820.3402
Total 1.764 1.1158
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
111 kv Stone CrusherCrossing Jhinjhari Point01to040.8820.7756
2Poit 04 to 070.8820.3402
Total 1.764 1.1158
C. Maps of forest land proposed to be diverted
Division 1. : Rajsamand Wildlife
  (i). Area of forest land proposed to be diverted(in ha.) : 1.764   (ii). Nature of the Project: Linear   (b). No. of Segments : Two
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.0.882    View File
2.0.882    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 4   (iii). Temporary Employment(Number of person-days): 450
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : Yes   (a). Whether Project or a part thereof is located within a Protected Area ? : Yes   (b). Status of approval of the Supreme Court : Application yet to b   (ii). Status of approval of the Standing Committee of National Board for the Wildlife(NBWL) to the Project : Application yet to be submitted
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: No   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii) . Reason for not providing Non-Forest Land: For laying of transmission lines
Additional information Details
Documents
S.No Documents
Remarks
1Administrative Senction
2GRAM PANCHYAT NOC
3Financial Senction -
4Jamabandi nakal
5Senction of Parameter for Project
6Singal Line Diaram map
7AUTHORIZATION LETTER
8BAR CHART
9CERTIFICATE FOR MINIMUM USE OF FOREST LAND
10JUSTIFICATION FOR LOCATING THE PROJECT
11UNDERTAKING CONSERVATION OF FLORA-FAUNA DURING
12UNDERTAKING FOR CONSTRUCTION MATERIALS WILL BE NO STORED IN SANCTUARY AREA DURING CONSTRUCTION OF 11 KV TRANSMISSION LINE
13UNDERTAKING FOR FRA CERTIFICATE
14UNDERTAKING FOR MEDICIANAL PLANTS
15UNDERTAKING FOR MUCK DISPOSAL
16UNDERTAKING FOR NO CHANGES IN STATUTORY POSITION OF DIVERTED
17UNDERTAKING FOR PAYMENT OF ANY OTHER COST &
18UNDERTAKING FOR PAYMENT OF NET PRESENT VALUE OF FOREST AREA
19UNDERTAKING FOR NO NIGHT CAMP IN SANCTUARY AREA DURING CONSTRUCTION OF 11 KV TRANSMISSION LINE
20UNDERTAKING FOR NO OTHER FEASIBLE ALTERNATIVE
21UNDERTAKING FOR PAYMENT OF ANY OTHER COST
22UNDERTAKING FOR THERE SHALL BE NO BLASTING WITHIN 500 METERS
23UNDERTAKING FOR TWO TIME DEGRADED FOREST LAND
24UNDERTAKING FOR USE OF ANY MATERIAL FROM SURROUNDED
25UNDERTAKING FOR USE OF FOREST LAND
26UNDERTAKING FOR WASTE MANAGEMENT DURING
27PROJECT REPORT
28EDS REPLY-20-02-2020
29EDS REPLY -09-11-2020
30Details of Permanent Employment to be Generated
31SEGMENT WISE AREA CALCULATION SHEET
32EDS REPLY-27-07-2021
33GEO-REFERENCED KHASRA MAP SHOWING FOR REQUIRED LAND WITH PROPOSED 11 KV TRANSMISSION LINE ROUTE ALIGNMENT SCALE 1: 4000
34EDS Reply-04-10-2022
35STATEMENT SHOWING DETAILS OF FOREST AREA PROPOSED FOR DIVERSION
36STATEMENT SHOWING DETAILS OF NON-FOREST AREA INVOLVED IN THE PROPOSAL
37COMPARATIVE STATEMENT OF ALTERNATIVE ROUTE
38ALTERNATIVE MAP SHOWING FOR GEO-REFERENCED SURVEY OF INDIA TOPOSHEET WITH 11 KV TRANSMISSION LINE ROUTE ALIGNMENT FULL TOPOSHEET NO 45G-13 SCALE 1: 50000
39ALTERNATIVE GEO-REFERENCED DGPS MAP
40MAP SHOWING FOR GEO-REFERENCED SURVEY OF INDIA TOPOSHEET WITH PROPOSED 11 KV TRANSMISSION LINE ROUTE ALIGNMENT FULL TOPOSHEET NO 45G-13 SCALE 1: 50000
41GEO-REFERENCED DGPS MAP SHOWING FOR REQUIRED LAND COORDINATE WITH PROPOSED 11 KV TRANSMISSION LINE ROUTE ALIGNMENT