  (i). Proposal No. : FP/RJ/TRANS/148624/2021   (ii). Name of Project for which Forest Land is required : Construction for LILO of 132kV S/C Sikar-Laxmangarh Line at 132 KV GSS Rasidpura , District -Sikar(Rajasthan)   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Construction for LILO of 132kV S/C Sikar-Laxmangarh Line at 132 KV GSS Rasidpura , District -Sikar(Rajasthan) Total Route Length 1.023km   (iv). State : Rajasthan   (v). Category of the Proposal : Transmission Line   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 14.7776   (viii). Area of forest land proposed for diversion(in ha.): 0.1026   (ix). Non-forest land required for this project(in ha.): 2.6595   (x). Total period for which the forest land is proposed to be diverted(in years): 50
A-2. Details of User Agency
  (i). Name : RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED   (ii). Address1 : Vidyut Bhawan Jyoti Nagar,Jaipur   (iii). Address2 : NIL   (iv). State : Rajasthan   (v). District : Jaipur   (vi). Pin : 302005   (vii). Landmark : NIL   (viii). Email address : neplpurchase266@gmail.com   (ix). Landline Telephone No. : 0-   (x). Fax No. : 0-   (xi). Mobile No. : 9413392963   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : State PSU
A-3. Details of Person Making Application
  (i). First Name: Lalji   (ii). Middle Name: NIL   (iii). Last Name: Kashyap   (iv). Gender: Male   (v). Designation: Executive Engineer   (vi). Address 1: Executive Engineer , T and C , Rajasthan Rajya Vidyut Prasaran Nigam Limited , Fatehpur Road , Sabhalpura, Sikar   (vii). Address 2: NIL   (viii). State: Rajasthan   (ix). District: Sikar   (x). Tehsil: NIL   (xi). Pin: 332001   (xii). Landmark: NIL   (xiii). Email Address: neplpurchase266@gmail.com   (xiv). Landline Telephone No.: 1572-257120   (xv). Fax No.: NIL   (xvi). Mobile No.: 9413392963   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
Proposal Submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
1ApprovedFP/RJ/TRANS/24446/2017F.1(18)Forest/20170.31320.313227 Mar 201717 Apr 2018
2InprincipleFP/RJ/TRANS/36179/20188B/raj/04/27/20203.98363.983612 Oct 2021
3InprincipleFP/RJ/TRANS/36238/20188B/RAJ/04/26/20205.54015.540108 Dec 2020
Total 9.8369 9.8369
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Sikar Territorial0.10262.6595
Total0.10262.6595
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Sikar0.10262.6595
Total0.10262.6595
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Rasidpura0.10262.6595
Total 0.1026 2.6595
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Construction work of LILO of 132 KV S/C Sikar - La0.10262.6595
Total 0.1026 2.6595
C. Maps of forest land proposed to be diverted
Division 1. : Sikar Territorial
  (i). Area of forest land proposed to be diverted(in ha.) : 0.1026   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.0.1026    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: No   (a). Reason for not providing such map: NH-11 Declared Protected forest Strip
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 5   (iii). Temporary Employment(Number of person-days): 5600
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Not Applicable   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Not Applicable   (iii) . Reason for not providing Non-Forest Land: Not Applicable
Additional information Details
Documents
S.No Documents
Remarks
1Administrative and Financial Sanction
2Authorizataion
3BAR CHART
4CERTIFICATE FOR MINIMUM USE OF FOREST LAND
5Details of permanent employment to be generated
6JUSTIFICATION FOR LOCATING THE PROJECT IN FOREST AREA
7UNDERTAKING FOR CONSERVATION OF FLORA-FAUNA DURING CONSTRUCTION OF TRANSMISSION LINE
8UNDERTAKING FOR MEDICIANAL PLANTS
9UNDERTAKING FOR MUCK DISPOSAL
10UNDERTAKING FOR NO CHANGE S IN STATUTORY POSITION OF DIVERTED FOREST LAND
11UNDERTAKING FOR PAYMENT OF ANY OTHER COST AND CONDITION
12UNDERTAKING FOR PAYMENT OF COST OF COMPENSATORY AFFORESTATION
13UNDERTAKING FOR PAYMENT OF NET PRESENT VALUE OF FOREST AREA
14UNDERTAKING FOR TWO TIME DEGRADED FOREST LAND
15UNDERTAKING FOR USE OF ANY MATERIAL FROM SURROUNDED FOREST LAND DURING CONSTRUCTION OF TRANSMISSION LINE
16UNDERTAKING FOR USE OF FOREST LAND
17Village Wise Area calculation Sheet Forest and Non-Forest Land
18Technical Sanction
19STATEMENT SHOWING DETAILS OF FOREST AREA PROPOSED FOR DIVERSION
20Segment Wise Area Calculation Sheet
21NH Road Notification
22Map Showing for Geo-Referenced Survey of India Toposheet With Proposed LILO of 132kV S/C Sikar-Laxmangarh Transmission Line Full Toposheet 45m/2 Scale 1 : 50000
23Map Showing for Geo-Referenced DGPS Map required Land Coordinate With Proposed LILO of 132kV S/C Sikar-Laxmangarh Transmission Line
24Map Showing for Geo-Referenced Full Digital Map With Proposed LILO of 132kV S/C Sikar-Laxmangarh Transmission Line
25Geo-Referenced Google Imagery Map With Proposed LILO of 132kV S/C Sikar-Laxmangarh Transmission Line
26EDS reply -10-11-2021
27Khasra map Super Imposed Transmission Line
28Tower Drawing
29Tower Schedule
30EDS Reply -02-12-2021
31Jamabandi