FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A.
General Details
A-1.
Project Details
(i). Proposal No. :
FP/RJ/TRANS/147919/2021
(ii). Name of Project for which Forest Land is required :
Construction for 132 KV S/C Setrawa-Sekhala Line , Tehsil -Balesar , District -Jodhpur (Rajasthan)
(iii). Short narrative of the proposal and Project/scheme for which the forest land is required :
Construction for 132 KV S/C Setrawa-Sekhala Line , Tehsil -Balesar , District -Jodhpur (Rajasthan)Total Route length 11.319 km
(iv). State :
Rajasthan
(v). Category of the Proposal :
Transmission Line
(vi). Shape of forest land proposed to be diverted :
Linear
(vii). Estimated cost of the Project(Rupees in lacs) :
1753.58
(viii). Area of forest land proposed for diversion(in ha.):
0.1404
(ix). Non-forest land required for this project(in ha.):
30.4209
(x). Total period for which the forest land is proposed to be diverted(in years):
50
A-2.
Details of User Agency
(i). Name :
RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED
(ii). Address1 :
VIDYUT BHAWAN,JANPATH, JYOTI NAGAR, JAIPUR RAJASRHAN
(iii). Address2 :
NIL
(iv). State :
Rajasthan
(v). District :
Jaipur
(vi). Pin :
302005
(vii). Landmark :
VIDYUT BHAWAN
(viii). Email address :
pcpadlia@gmail.com
(ix). Landline Telephone No. :
1477-220084
(x). Fax No. :
1477-
(xi). Mobile No. :
9468815600
(xii). Website (if any) :
www.rvpn.co.in
(xiii). Legal status of User Agency :
State PSU
A-3.
Details of Person Making Application
(i). First Name:
Sanjeev
(ii). Middle Name:
NIL
(iii). Last Name:
Bharagav
(iv). Gender:
Male
(v). Designation:
Executive Engineer
(vi). Address 1:
Executive Engineer T C , RVPN, Jodhpur
(vii). Address 2:
NIL
(viii). State:
Rajasthan
(ix). District:
Jodhpur
(x). Tehsil:
balesar
(xi). Pin:
342001
(xii). Landmark:
NIL
(xiii). Email Address:
nepljpr@gmail.com
(xiv). Landline Telephone No.:
0-
(xv). Fax No.:
NIL
(xvi). Mobile No.:
9929320677
(xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B.
Details of land required for the Project
B-1.
Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no
Proposal Status.
Proposal No.
Moef File No.
Area Proposed for Diversion(Ha.)
Area Diverted(Ha.)
Date of In-Principle Approval
Date of Final Approval
NIL
B-2.
Details of forest land proposed to be diverted
B-2.1
Details of Divisions involved
Details of Divisions involved
S.no
Division Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Jodhpur Territorial
0.1404
30.4209
Total
0.1404
30.4209
B-2.2
Details of Districts involved
District wise breakup
S.no
District Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Jodhpur
0.1404
30.4209
Total
0.1404
30.4209
B-2.3
Village wise breakup
Villages wise breakup
S.no
Village
Forest Land(ha.)
Non-Forest Land(ha.)
1
Hupsar
0
3.564
2
Gogadevgarh
0
4.023
3
Ajeetgarh
0
4.05
4
Sekhala
0
5.832
5
Shaitarawa
0.0702
7.6599
6
Birmadevgarh
0.0702
5.292
Total
0.1404
30.4209
B-2.4
Component wise breakup
Component wise breakup
S.no
Component
Forest Land(ha.)
Non-Forest Land(ha.)
1
132 KV S/C Setrawa-Sekhala Line
0.1404
30.4209
Total
0.1404
30.4209
C.
Maps of forest land proposed to be diverted
Division 1. : Jodhpur Territorial
(i). Area of forest land proposed to be diverted(in ha.) :
0.1404
(ii). Nature of the Project:
Linear
(b). No. of Segments :
One
Segment wise details
Segments
Segment Area(in ha.)
Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.
0.1404
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D.
Justification for locating the Project in forest land and details of alternatives examined:
(i). Copy of note containing justification for locating the Project in forest land:
(ii). Whether a copy of map indicating location of alternative examine is required to be provided:
No
(a). Reason for not providing such map:
NH-114 Protected forest Strip
E.
Employment likely to be generated
(i). Whether the Project is likely to generate employment ?:
Yes
(ii). Permanent/Regular Employment(Number of persons):
4
(iii). Temporary Employment(Number of person-days):
8820
F.
Displacement of People due to the Project, if any
(i). Whether Project involves displacement?:
No
G.
Details of Cost-Benefit analysis for the Project
(i). Whether the Project requires Cost-Benefit analysis?:
No
H.
Status of Environmental Clearance
(i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? :
No
I.
Status of Wildelife Clearance
(i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? :
No
J.
Applicability of special provisions governing Scheduled Areas
(i).Whether the Project or a part thereof is located in a Scheduled Area? :
No
K.
Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
(i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? :
Yes
(a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L.
Details of land identified for Compensatory Afforestation
(i). Whether non-forest or Revenue forest land is required to be provided by User Agency?:
Not Applicable
(ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?:
Not Applicable
(iii) . Reason for not providing Non-Forest Land:
Not Applicable
Additional information Details
Documents
S.No
Documents
Remarks
1
Administrative and Financial Sanction
2
Authorization Letter
3
Technical sanction
4
CERTIFICATE FOR MINIMUM USE OF FOREST LAND
5
UNDERTAKING FOR CONSERVATION OF FLORA-FAUNA DURING CONSTRUCTION OF TRANSMISSION LINE
6
JUSTIFICATION FOR LOCATING THE PROJECT IN FOREST AREA
7
UNDERTAKING FOR MEDICIANAL PLANTS
8
UNDERTAKING FOR MUCK DISPOSAL
9
UNDERTAKING FOR NO CHANGE S IN STATUTORY POSITION OF DIVERTED FOREST LAND
10
UNDERTAKING FOR PAYMENT OF ANY OTHER COST AND CONDITION
11
UNDERTAKING FOR PAYMENT OF COST OF COMPENSATORY AFFORESTATION
12
UNDERTAKING FOR PAYMENT OF NET PRESENT VALUE OF FOREST AREA
13
UNDERTAKING FOR TWO TIME DEGRADED FOREST LAND
14
UNDERTAKING FOR USE OF ANY MATERIAL FROM SURROUNDED FOREST LAND DURING CONSTRUCTION OF TRANSMISSION LINE
15
UNDERTAKING FOR USE OF FOREST LAND
16
UNDERTAKING OF FRA CERTIFICATE
17
Details of permanent employment to be generated
18
Project report
19
Segment Wise Area Calculation Sheet
20
UNDERTAKING FOR NHAI DEPARTMENT NOC
21
Village Wise Area calculation Sheet Forest and Non-Forest Land
22
STATEMENT SHOWING DETAILS OF FOREST AREA PROPOSED FOR DIVERSION
23
BAR CHART
24
JAMABANDI COPY
25
Map Showing for Geo-Referenced Survey of India Toposheet With Proposed 132 KV S/C Setrawa-Sekhala Line FULL TOPOSHEET NO 45B/6 SCALE 1 : 50000
26
Geo-Referenced DGPS Map Required Land Coordinate With Proposed 132 KV S/C Setrawa-Sekhala Line
27
Geo-Referenced Digital Map Total Route AlignmentWith Proposed 132 KV S/C Setrawa-Sekhala Line
28
Geo-Referenced Khasra Super Imposed Map With Proposed 132 KV S/C Setrawa-Sekhala Line
Print