FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/RJ/TRANS/143945/2021   (ii). Name of Project for which Forest Land is required : Construction of Sikar-II_Neemrana 400 KV D/C Transmission Line(Twin HTLS*)in Rajasthan   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : “Construction of Sikar-II Neemrana 400 KV D/C Transmission line(Twin HTLS*) , District-Sikar, Jhunjhunu, Jaipur & Alwar (Rajasthan)” (Total Route Length 134.810 km) in Rajasthan Portion Route Length 126.290km   (iv). State : Rajasthan   (v). Category of the Proposal : Transmission Line   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 13591.205   (viii). Area of forest land proposed for diversion(in ha.): 13.0134   (ix). Non-forest land required for this project(in ha.): 564.9674   (x). Total period for which the forest land is proposed to be diverted(in years): 50
A-2. Details of User Agency
  (i). Name : SIKAR NEW TRANSMISSION LIMITED (A 100% WHOLLY OWNED SUBSIDIARY OF POWERGRID CORPORATION OF INDIA LIMITED)   (ii). Address1 : Sikar 400/220KV Sub Station , Village-Bhadadhar, Post-Khuri Badi,13th Mile Stone Sikar-Bikaner Highway, (Rajasthan)   (iii). Address2 : NIL   (iv). State : Rajasthan   (v). District : Sikar   (vi). Pin : 332315   (vii). Landmark : NIL   (viii). Email address : ppchaurasia@powergrid.in   (ix). Landline Telephone No. : 0-   (x). Fax No. : 0-   (xi). Mobile No. : 6378774484   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : Central PSU
A-3. Details of Person Making Application
  (i). First Name: PRANVEER   (ii). Middle Name: PRATAP   (iii). Last Name: CHAURASIA   (iv). Gender: Male   (v). Designation: ChiefManager   (vi). Address 1: Sikar 400/220 KV Sub Station ,Village-Bhadadhar, Post - Khuri Badi , 13 th Mile Stone Sikar-Bikaner NH, Rajasthan   (vii). Address 2: NIL   (viii). State: Rajasthan   (ix). District: Sikar   (x). Tehsil: Sikar   (xi). Pin: 332315   (xii). Landmark: NIL   (xiii). Email Address: ppchaurasia@powergrid.in   (xiv). Landline Telephone No.: 0-   (xv). Fax No.: NIL   (xvi). Mobile No.: 6378774484   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Sikar Territorial7.5486380.627
2.Jhunjhunu Territorial014.3796
3.Jaipur (North) Territorial025.0608
4.Alwar Territorial5.4648144.9
Total13.0134564.9674
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Sikar7.5486380.627
1.jhunjhunu014.3796
3.Jaipur025.0608
4.Alwar5.4648144.9
Total13.0134564.9674
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Akhepura013.0502
2Palsana013.616
3Govindpura014.306
4Sajanpura06.854
5Hamirpura09.2
6Khatundra09.936
7Garhrwalo Ki Dhani010.4052
8Soladipura010.6076
9Padampura010.971
10Bhojpura011.8726
11Dulapura010.258
12Math09.844
13Basri010.994
14Pratapura013.0134
15Nimki012.328
16Charan ka Bas013.1974
17Choukri09.476
18Hanuman Nagar011.04
19Challa07.475
20Bhopalpura05.3636
21Sirohi07.82
22Ranasar08.303
23Nayabas07.452
24Neem Ka Thana09.108
25Gorawas09.062
26Kalu Ki Dhani07.13
27Bageshwar07.82
28Barala07.038
29Khadag Bijpur4.86226.21
30Nathuwala2.68647.0288
31Dokan08.556
32Dhandela06.44
33Patan07.9212
34Rajpura07.268
35Mohanpura08.234
36Balupura06.21
37Jhamas012.236
38Rampura09.867
39Dalpatpura07.682
40Dilpura07.981
41Sirsa ki Dhani07.452
42Pachalngi07.5256
43Jharaya06.854
44Banar09.6048
45Chola ki Dhani05.06
46Deota05.658
47Chhadra04.738
48Nalota04.048
49Dhindhor08.602
50Gadoj05.865
51Gunti0.155.106
52Simla07.452
53Gokulpur05.566
54Jagwas05.451
55Bahror07.36
56Kalyanpura07.337
57Nangla Rudh03.68
58Devnagar08.832
59Bardod1.80786.8126
60Batkhani06.624
61Bhungra Thetar1.0125.543
62Kolila Joga05.98
63Manjrakath1.03510.511
64Sanauli1.41229.982
65Isrisinghpura06.5044
66Fauladpur011.776
67Shanjapur0.047811.868
Total 13.0134 564.9674
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Tower Foundation0.226811.6964
2Stringing Area4.8654209.3778
3Remaining ROW Area7.9212343.8932
Total 13.0134 564.9674
C. Maps of forest land proposed to be diverted
Division 1. : Alwar Territorial
  (i). Area of forest land proposed to be diverted(in ha.) : 5.4648   (ii). Nature of the Project: Linear   (b). No. of Segments : Four
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.0.15    View File
2.1.8078    View File
3.3.4592    View File
4.0.0478    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
Division 2. : Sikar Territorial
  (i). Area of forest land proposed to be diverted(in ha.) : 7.5486   (ii). Nature of the Project: Linear   (b). No. of Segments : Three
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.2.323    View File
2.4.2412    View File
3.0.9844    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 6   (iii). Temporary Employment(Number of person-days): 58636
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Not Applicable   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Not Applicable   (iii) . Reason for not providing Non-Forest Land: Not Applicable
Additional information Details
Documents
S.No Documents
Remarks
1ADMINISTRATIVE SANCTION
2Authorization
3LoI Rajasthan Part C
4PROJECT REPORT
5EDS REPLY-08-07-2021
6Approval Section 68 _Raj C
7BAR CHART
8CERTIFICATE FOR MINIMUM USE OF FOREST LAND
9CERTIFICATE TOWARD MUCK DISPOSAL AND MANAGMENT PLAN
10Details of Permanent Employment to be Generated
11ENVIRONMENTAL CLEARANCE CERTIFICATE
12JUSTIFICATION FOR LOCATING THE PROJECT IN FOREST AREA
13Segment Wise Area Calculation Sheet
14UNDERTAKING FOR All TYPE FOREST LAND INCLUDED
15UNDERTAKING FOR CONSERVATION OF FLORA-FAUNA DURING CONSTRUCTION OF TRANSMISSION LINE
16UNDERTAKING FOR MEDICIANAL PLANTS
17UNDERTAKING FOR MUCK DISPOSAL
18UNDERTAKING FOR NO CHANGE S IN STATUTORY POSITION OF DIVERTED FOREST LAND
19UNDERTAKING FOR PAYMENT OF ANY OTHER COST AND CONDITION
20UNDERTAKING FOR PAYMENT OF COST OF COMPENSATORY AFFORESTATION
21UNDERTAKING FOR PAYMENT OF NET PRESENT VALUE OF FOREST AREA
22UNDERTAKING FOR TWO TIME DEGRADED FOREST LAND
23UNDERTAKING FOR USE OF ANY MATERIAL FROM SURROUNDED FOREST LAND DURING CONSTRUCTION OF TRANSMISSION LINE
24UNDERTAKING FOR USE OF FOREST LAND
25UNDERTAKING OF FRA CERTIFICATE
26Village Wise Area calculation Sheet Forest and Non-Forest Land
27Map Showing For Geo-Referenced Survey of India Toposheet With Proposed Construction of Sikar-Neemrana 400 KV D/C Transmission line Full Toposheet No-45m/6, 45m/10 , 45m/13 , 45m/14 , 54 A/1 (Forest Division -Sikar) Scale 1 : 50000
28Geo-Referenced Revenue Khasra Map Village -Khadag Bijpur and Nathuwala Division -Sikar Scale 1 : 4000
29STATEMENT SHOWING DETAILS OF FOREST AREA PROPOSED FOR DIVERSION (Division-Sikar)
30STATEMENT SHOWING DETAILS OF NON FOREST AREA INVOLVED IN THE PROPOSAL
31Jamabandi (Sikar Forest - Division)
32Map Showing For Geo-Referenced Survey of India Toposheet With Proposed Construction of Sikar-Neemrana 400 KV D/C Transmission line Full Toposheet No- 54 A/1 ,54 A/5, 54D/8 ( Forest Division -Alwar) Scale 1 : 50000
33Geo-Referenced DGPS Map Showing for Required Land Coordinate with Proposed Construction of Sikar-Neemrana 400 KV D/C Transmission line (Alwar -Forest Division)
34STATEMENT SHOWING DETAILS OF FOREST AREA PROPOSED FOR DIVERSION (Forest Division-Alwar)
35Jamabandi (Alwer Division)
36Geo-Referenced KHASRA MAP Segment 4 to 7 (Alwar Forest Division) Scale 1 :4000
37COMPARATIVE STATEMENT OF ALTERNATIVE ROUTE
38Geo-Referenced Google Map (Sikar -Forest Division)
39Geo-Referenced DGPS Map Showing for Required Land Coordinate with Proposed Construction of Sikar-Neemrana 400 KV D/C Transmission line (Sikar -Forest Division)
40Geo-Referenced Digital Map Total Route with Proposed Construction of Sikar-Neemrana 400 KV D/C Transmission line
41Geo-Referenced Alternative Digital Map
42Alternative Toposheet map
43EDS Reply Powergrid to Jaipur Forest Division-4-01-2022
44EDS Reply Power grid to Jaipur Forest Division-4-01-2022
45EDS Reply Power grid to Sikar Forest Division-4-01-2022
46EDS reply-19-01-2022 Forest dcf letter 12-01-2022 Regarding