FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/RJ/TRANS/142545/2021   (ii). Name of Project for which Forest Land is required : Construction of 765 KV D/C Bhadla-II to Sikar-II Transmission line ,District- Jodhpur, Bikaner, Nagaur, Churu & Sikar (Rajasthan)   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Construction of 765 KV D/C Bhadla-II to Sikar-II Transmission line, Total Route length298.210 km District- Jodhpur, Bikaner, Nagaur, Churu & Sikar (Rajasthan)   (iv). State : Rajasthan   (v). Category of the Proposal : Transmission Line   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 83304   (viii). Area of forest land proposed for diversion(in ha.): 0.5428   (ix). Non-forest land required for this project(in ha.): 1997.4641   (x). Total period for which the forest land is proposed to be diverted(in years): 50
A-2. Details of User Agency
  (i). Name : SIKAR NEW TRANSMISSION LIMITED   (ii). Address1 : SIkar 400/220kV Sub-station, Vill.-Bhadadhar, Post-Khuri Badi   (iii). Address2 : 13 th mile stone, sikar-bikaner highway   (iv). State : Rajasthan   (v). District : Sikar   (vi). Pin : 332315   (vii). Landmark : NIL   (viii). Email address : dhan144179@powergrid.in   (ix). Landline Telephone No. : 0-   (x). Fax No. : 0-   (xi). Mobile No. : 6397627556   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : Central PSU
A-3. Details of Person Making Application
  (i). First Name: DHANRAJ   (ii). Middle Name: NIL   (iii). Last Name: ASERI   (iv). Gender: Male   (v). Designation: Deputy Manager   (vi). Address 1: Type V Quarter, TE Tax Building, BSNL Manasar, Nagaur   (vii). Address 2: NIL   (viii). State: Rajasthan   (ix). District: Nagaur   (x). Tehsil: Nagaur   (xi). Pin: 341001   (xii). Landmark: NIL   (xiii). Email Address: dhan144179@powergrid.in   (xiv). Landline Telephone No.: 0-   (xv). Fax No.: NIL   (xvi). Mobile No.: 6397627556   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Jodhpur Territorial0.2212738.8759
2.Nagaur Territorial0.3216861.7607
3.Sikar Territorial0396.8275
Total0.54281997.4641
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Jodhpur0.2212299.3626
1.Bikaner0439.5133
3.Nagaur0.3216861.7607
4.Churu060.7489
5.Sikar0336.0786
Total0.54281997.4641
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Kansingh Ki Seer0.221222.5588
2Gurha019.832
3Kalyan Singh Ki Seer023.517
4Malam Singh Ki Seer014.74
5Ramchanderi012.864
6Sodadhara09.849
7Ramchilla025.326
8Bheru singh ki Dhani015.075
9Pandito ki Dhani018.492
10Bekui ki Dhani022.0564
11Lambasar025.8285
12Meethadiya019.899
13Loona020.5355
14Lumbasar029.8351
15Chimana018.9543
16Dasori017.956
17Khajora021.172
18Bhelu018.291
19Saisar026.8335
20Nehrusar025.594
21Nathusar023.249
22Jato ki dhani010.787
23Raikon ki Dhani020.502
24Mochiyon ki Dhani022.177
25Panchu044.22
26Sangal Dhora021.4735
27Khara034.17
28Hansasar019.3295
29Godaron ki Dhani015.9795
30Shekhasar022.378
31Byau022.914
32Dava015.209
33Charakara020.0531
34Silva020.0531
35Kanvlesar017.1721
36Bu Karamostan027.269
37Chila022.445
38Seori017.956
39Mundasar019.095
40Birmasar010.4185
41Lariya022.847
42Rohini015.678
43Gorera018.157
44Shyamsar012.931
45Jhorra011.859
46Chahu012.261
47Anvliyasar022.311
48Boseri011.792
49Meetha Manjra015.812
50Dodu09.7485
51Kangsiya015.343
52Talniau018.693
53Surpaliya021.4065
54Mundiau09.3465
55Khabriyana011.1555
56Gorau012.596
57Hudas011.323
58Bharnawa08.71
59Sandas019.43
60Jharariya014.07
61Malgaonv011.39
62Sikrali029.614
63Genana07.2025
64Ratau020.6025
65Baldu014.8271
66Dudholi012.73
67Thakuriyawas025.259
68Khardia017.554
69Naugangpura07.839
70Patan014.07
71Singhana010.586
72Kalwani019.363
73Chandbasni012.6295
74Girdharipura017.755
75Thanu011.5575
76Devrathi011.189
77Sukpa012.596
78Sewa012.8975
79Bemath012.194
80Lalasri012.998
81Khariya013.534
82Ganeshppura012.1002
83Bardwa014.137
84Bansawa014.003
85Payali024.589
86Kayamsar017.4535
87Sunjrasan018.8605
88Ahirokabas013.6345
89Hudil016.9845
90Karnaota032.6089
91Mangrasar028.14
92Singrawat015.075
93Ganeshpura-010.854
94Bajniyo ki Dhani08.978
95Maliyon ki Dhani08.576
96Losal010.05
97Rampura09.179
98Bhirana06.834
99Charnwas010.05
100Balwantpura07.504
101Pratapura08.107
102Khandari09.4135
103Shesham014.8405
104Bhagatpura013.266
105Karanpura010.787
106Jhun ka Bas05.896
107Vijaypura06.499
108Lamba ki Dhani07.37
109Tiphoniyo ki Dhani08.0065
110Goriyawas012.596
111Suliyawas05.159
112Khatiwas018.4585
113Rupgarh010.2175
114Kukariyawas06.968
115Tehat09.3465
116Dudwa012.3615
117Basri Kalan010.7535
118Basri Khurd06.164
119Dhirajpura05.4605
120Reta011.859
121Ganora014.405
122Samarthpura014.07
123Dukiya011.39
124Govti015.5841
125Ajva0.321612.0064
126Ghoraran016.951
Total 0.5428 1997.4641
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Tower Foundation04.86
2Stringing Area0.1944710.6495
3Remaining ROW Area0.34841281.954571
Total 0.5428 1997.464071
C. Maps of forest land proposed to be diverted
Division 1. : Nagaur Territorial
  (i). Area of forest land proposed to be diverted(in ha.) : 0.3216   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.0.3216    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
Division 2. : Sikar Territorial
  (i). Area of forest land proposed to be diverted(in ha.) : 0   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.0    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
Division 3. : Jodhpur Territorial
  (i). Area of forest land proposed to be diverted(in ha.) : 0.2212   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.0.2212    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 15   (iii). Temporary Employment(Number of person-days): 420864
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Not Applicable   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Not Applicable   (iii) . Reason for not providing Non-Forest Land: Not Applicable
Additional information Details
Documents
S.No Documents
Remarks
1ADMINISTRATIVE SANCTION
2AUTHORIZATION LETTER
3LOI Rajasthan Part C
4EDS Reply -09-08-2021
5Geo-Referenced DGPS Map Segment -3(Forest Division -Sikar)
6JAMABANDI
7Eds Reple to Nagaur Division-03-02-2022
8EDS Reply to Sikar DCF-20-09-2022
9Area Edit Option open Regarding Letter -23-01-2023
10BAR CHART
11Area Calculation Sheet for Forest and Non Forest
12CERTIFICATE FOR MINIMUM USE OF FOREST LAND
13CERTIFICATE TOWARD MUCK DISPOSAL
14COMPARATIVE STATEMENT OF ALTERNATIVE ROUTE
15JUSTIFICATION FOR LOCATING THE PROJECT IN FOREST AREA
16UNDERTAKING FOR ALL TYPE FOREST INCLUDED
17UNDERTAKING FOR CONSERVATION OF FLORA-FAUNA DURING CONSTRUCTION OF TRANSMISSION LINE
18UNDERTAKING FOR MEDICIANAL PLANTS
19UNDERTAKING FOR MUCK DISPOSAL
20UNDERTAKING FOR NO CHANGE S IN STATUTORY POSITION OF DIVERTED FOREST LAND
21UNDERTAKING FOR PAYMENT OF ANY OTHER COST AND CONDITION
22UNDERTAKING FOR PAYMENT OF COST OF COMPENSATORY AFFORESTATION
23UNDERTAKING FOR PAYMENT OF NET PRESENT VALUE OF FOREST AREA
24UNDERTAKING FOR TWO TIME DEGRADED FOREST LAND
25UNDERTAKING FOR USE OF ANY MATERIAL FROM SURROUNDED FOREST LAND DURING CONSTRUCTION OF TRANSMISSION LINE
26UNDERTAKING FOR USE OF FOREST LAND
27UNDERTAKING OF FRA CERTIFICATE
28Village Wise area calculation Sheet
29COMPLETE ALIGNMENT TOWER COORDINATES
30Component Wise Area Calculation Sheet
31Details of Permanent Employment to be Generated
32KHASRA WISE STATEMENT SHOWING DETAILS OF FOREST AREA PROPOSED FOR DIVERSION (JODHPUR)
33KHASRA WISE STATEMENT SHOWING DETAILS OF FOREST AREA PROPOSED (NAGAUR)
34Segment Wise Area Calculation Sheet
35GEO-REFERENCEDSURVEY MAP SHOWING FOR SURVEY OF INDIA TOPOSHEET WITH REQUIRED FOREST LAND AND PROPOSED 765 KV D/C ROUTE ALIGNMENT SCALE 1: 50000 PART-1 (JODHPUR AND BIKANER)
36GEO-REFERENCEDSURVEY MAP SHOWING FOR SURVEY OF INDIA TOPOSHEET WITH REQUIRED FOREST LAND AND PROPOSED 765 KV D/C ROUTE ALIGNMENT SCALE 1: 50000 PART-2 (NAGAUR AND CHURU)
37GEO-REFERENCEDSURVEY MAP SHOWING FOR SURVEY OF INDIA TOPOSHEET WITH REQUIRED FOREST LAND AND PROPOSED 765 KV D/C ROUTE ALIGNMENT SCALE 1: 50000 PART-3 (SIKAR)
38GEO-REFERENCEDSURVEY DGPS MAP SHOWING FOR REQUIRED FOREST LAND COORDINATE WITH PROPOSED 765 KV D/C ROUTE ALIGNMENT SEGMENT-1 (JODHPUR)
39GEO-REFERENCEDSURVEY DGPS MAP SHOWING FOR REQUIRED FOREST LAND COORDINATE WITH PROPOSED 765 KV D/C ROUTE ALIGNMENT SEGMENT-2 (NAGAUR)
40GEO-REFERENCEDSURVEY FULL DIGITAL MAP SHOWING FOR PROPOSED 765 KV D/C ROUTE ALIGNMENT PART-1 (JODHPUR -BIKANER)
41GEO-REFERENCEDSURVEY FULL DIGITAL MAP SHOWING FOR PROPOSED 765 KV D/C ROUTE ALIGNMENT PART-2 (NAGAUR -CHURU)
42GEO-REFERENCEDSURVEY FULL DIGITAL MAP SHOWING FOR PROPOSED 765 KV D/C ROUTE ALIGNMENT PART-3 (SIKAR)
43Khasra Map Super Imposed with 765 kv Transmission Line At Village Kanji ki Sir (Jodhpur Division) Scale 1 : 4000
44Khasra Map Super Imposed with 765 kv Transmission Line At Village Ajwa (Nagaur Division) Scale 1 : 4000
45Alternative Route Topo shseet Part-1
46Alternative Route Toposhseet Part-2
47Alternative Route Toposhseet Part-3
48Alternative Route Digital Map Part-1
49Alternative Route Digital Map Part-2
50Alternative Route Digital Map Part-3
51EDS Reply -15-02-2023 765 KV D/C Bhadla-II to Sikar-II Transmission line
52Submission Hard copy sikar division Letter 25-Apr-2023
53EDS reply to DCF Nagaur