FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A.
General Details
A-1.
Project Details
(i). Proposal No. :
FP/RJ/ROAD/36870/2018
(ii). Name of Project for which Forest Land is required :
Construction of Road from Aproach Road SH-22 to Silpur Km 0/0 to 3/400”
(iii). Short narrative of the proposal and Project/scheme for which the forest land is required :
Construction of Road from Aproach Road SH-22 to Silpur Km 0/0 to 3/400” This is the shortest route of villages to connect SH-22 Pato, so Silpura Palanpur construction is necessary for benefit of so many villages of various villages.
(iv). State :
Rajasthan
(v). Category of the Proposal :
Road
(vi). Shape of forest land proposed to be diverted :
Linear
(vii). Estimated cost of the Project(Rupees in lacs) :
86.47
(viii). Area of forest land proposed for diversion(in ha.):
1.641
(ix). Non-forest land required for this project(in ha.):
0.909
(x). Total period for which the forest land is proposed to be diverted(in years):
99
A-2.
Details of User Agency
(i). Name :
PUBLIC DEPARTMENT WORK KARAULI
(ii). Address1 :
PWD DIVISION-KARAULI,DISTRICT KARAULI,RAJASTHAN
(iii). Address2 :
NIL
(iv). State :
Rajasthan
(v). District :
Karauli
(vi). Pin :
322241
(vii). Landmark :
Old Collectorate Circle
(viii). Email address :
xenpwdkarauli@rediffmail.com
(ix). Landline Telephone No. :
7464-250091
(x). Fax No. :
7464-
(xi). Mobile No. :
9114353039
(xii). Website (if any) :
NIL
(xiii). Legal status of User Agency :
State Government
A-3.
Details of Person Making Application
(i). First Name:
Shivkesh
(ii). Middle Name:
NIL
(iii). Last Name:
Meena
(iv). Gender:
Male
(v). Designation:
ExicutiveEngineer
(vi). Address 1:
PWD-DIVISION,KARAULI,NEAR OLD COLLECTORATE CIRCLE,KARAULI, DISTRICT -KARAULI,RAJASTHAN
(vii). Address 2:
NIL
(viii). State:
Rajasthan
(ix). District:
Karauli
(x). Tehsil:
NIL
(xi). Pin:
322241
(xii). Landmark:
OLD COLLECTORATE CIRCLE
(xiii). Email Address:
rbareth2003@yahoo.co.in
(xiv). Landline Telephone No.:
7464-250041
(xv). Fax No.:
NIL
(xvi). Mobile No.:
9414545405
(xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B.
Details of land required for the Project
B-1.
Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
Proposal Submitted in Past
S.no
Proposal Status.
Proposal No.
Moef File No.
Area Proposed for Diversion(Ha.)
Area Diverted(Ha.)
Date of In-Principle Approval
Date of Final Approval
1
Under Processing in MoEF
FP/RJ/ROAD/35272/2018
0
0.6165
0
Total
0.6165
0
B-2.
Details of forest land proposed to be diverted
B-2.1
Details of Divisions involved
Details of Divisions involved
S.no
Division Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Karauli Territorial
1.641
0.909
Total
1.641
0.909
B-2.2
Details of Districts involved
District wise breakup
S.no
District Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Karauli
1.641
0.909
Total
1.641
0.909
B-2.3
Village wise breakup
Villages wise breakup
S.no
Village
Forest Land(ha.)
Non-Forest Land(ha.)
1
BALLUPURA
0.66
0
2
SILPURA
0.981
0.909
Total
1.641
0.909
B-2.4
Component wise breakup
Component wise breakup
S.no
Component
Forest Land(ha.)
Non-Forest Land(ha.)
1
APPROACH ROAD SH-22 TO SILPURA
1.641
0.909
Total
1.641
0.909
C.
Maps of forest land proposed to be diverted
Division 1. : Karauli Territorial
(i). Area of forest land proposed to be diverted(in ha.) :
1.641
(ii). Nature of the Project:
Linear
(b). No. of Segments :
One
Segment wise details
Segments
Segment Area(in ha.)
Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.
1.641
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D.
Justification for locating the Project in forest land and details of alternatives examined:
(i). Copy of note containing justification for locating the Project in forest land:
(ii). Whether a copy of map indicating location of alternative examine is required to be provided:
Yes
(a). Copy of map indicating location of alternative examined:
E.
Employment likely to be generated
(i). Whether the Project is likely to generate employment ?:
Yes
(ii). Permanent/Regular Employment(Number of persons):
0
(iii). Temporary Employment(Number of person-days):
512
F.
Displacement of People due to the Project, if any
(i). Whether Project involves displacement?:
No
G.
Details of Cost-Benefit analysis for the Project
(i). Whether the Project requires Cost-Benefit analysis?:
No
H.
Status of Environmental Clearance
(i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? :
No
I.
Status of Wildelife Clearance
(i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? :
No
J.
Applicability of special provisions governing Scheduled Areas
(i).Whether the Project or a part thereof is located in a Scheduled Area? :
No
K.
Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
(i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? :
Yes
(a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L.
Details of land identified for Compensatory Afforestation
(i). Whether non-forest or Revenue forest land is required to be provided by User Agency?:
Yes
(ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?:
No
(iii). No. of districts involved for raising Compensatory Afforestation:
1
(iv). No. of patches:
One
District 1. : Karauli
(a). Village:
Silpura
(b). Area(in ha.):
1.641
(c). Copy of KML file of the patch:
View File
(d). Khasra details:
312/301
(e). Present owner:
Others
(f). Copy of ownership proof:
(g). Copy of Mou/agreement executed between the Present owner and the User Agency:
(h). Copy of non encumberence certificate for the forest land:
(v). Scanned copy of the map of the land identified for creation of Compensatory Afforestation prepared by using GPS ot Total Station:
(vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land identified for creation of Compensatory Afforestation:
Additional information Details
Documents
S.No
Documents
Remarks
1
ADMINISTRATIVE AND FINANCIAL SANCTION
2
TECHNICAL SANCTION
3
JAMABANDI BALLUPURA
4
JAMABANDI SILPURA
5
KHASRA MAP
6
PWD Karauli AR TO Silpur r Road_ EDS 21-12-2018
7
GEO-REFERENCED DIGITAL REQUIRED FOREST LAND COORDINATES AND PROPOSED ROAD ALIGNMENT
8
GOOGLE IMAGERY MAP SHOWING FOR FOREST BOUNDARY WITH PROPOSED ROAD ALIGNMEN
9
ALTERNATIVE TOPO SHEET MAP SCALE 1:50,000
10
Alternative Digital map.pdf
11
Alternative Google map.pdf
12
CROSS SECTION AR SH-22 TO SILPURA.pdf
13
CERTIFICATE FOR MINIMUM USE OF FOREST LAND.pdf
14
JUSTIFICATION FOR LOCATING THE PROJECT IN FOREST AREA.pdf
15
UNDERTAKING FOR CONSERVATION OF FLORA-FAUNA AND WILDLIFE ANIMALS DURING ROAD CONSTRUCTION.pdf
16
UNDERTAKING FOR FRA CERTIFICATE.pdf
17
UNDERTAKING FOR MUCK DISPOSAL DURING CONSTRUCTION OF ROAD.pdf
18
UNDERTAKING FOR NO CHANGE’S IN STATUTORY POSITION OF DIVERTED FOREST LAND.pdf
19
UNDERTAKING FOR PAYMENT OF COST OF COMPENSATORY AFFORESTATION.pdf
20
UNDERTAKING FOR PAYMENT OF NET PRESENT VALUE OF FOREST AREA.pdf
21
UNDERTAKING FOR USE OF ANY MATERIAL FROM SURROUNDED FOREST LAND DURING CONSTRUCT ROAD.pdf
22
UNDERTAKING FOR WASTE MANAGEMENT DURING CONSTRUCTION ACTIVITY.pdf
23
AUTHORIZATION LETTER.pdf
24
EDS REPLY LETTER 31-07-2019
25
PROJECT REPORT
26
EDS REPLY -15-11-2019
27
STATEMENT SHOWING DETAILS OF FORESTAREAPROPOSED FOR DIVERSION
28
STATEMENT SHOWING DETAILS OF NON- FORESTAREAPROPOSED FOR DIVERSION
29
MAP SHOWING FOR GEO-REFERENCED SURVEY OF INDIA TOPO SHEET WITH FOREST BOUNDARY AND PROPOSED ROAD ALIGNMENT Scale 1 : 50,000
30
EDS Reply PWD Karauli Sampark Sadak Silpura road Road 20-02-2020
31
REVISED AUTHORIZATION LETTER-14-09-2020
32
EDS PWD KARAULI -14-09-2020
33
BAR CHART
34
Allotment Letter for CA Land
35
EDS Reply-24-09-2021
36
Khasra map for CA non-Forest Land
37
Jamabandi for CA non-Forest Land
38
EDS Reply-14-04-2022
39
Geo-Referenced SOI TOPOSHEET for NFL Scale 1 : 50000
40
Geo-Referenced DGPS Map CA NFL
41
EDS Reply-21-04-2022
Print