FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A.
General Details
A-1.
Project Details
(i). Proposal No. :
FP/RJ/Others/22621/2016
(ii). Name of Project for which Forest Land is required :
Mahi Banswara Rajasthan Atomic Power Project (MBRAPP)-1 to 4
(iii). Short narrative of the proposal and Project/scheme for which the forest land is required :
Setting up Pressurized Heavy Water Reactor (PHWR) based Nuclear Power Plant with installed capacity of 2800MWe, comprising of four units of 700MWe each(Refer Annexur-1 for details)
(iv). State :
Rajasthan
(v). Category of the Proposal :
Others
(vi). Shape of forest land proposed to be diverted :
Non Linear
(vii). Estimated cost of the Project(Rupees in lacs) :
2978200
(viii). Area of forest land proposed for diversion(in ha.):
100.05
(ix). Non-forest land required for this project(in ha.):
502.67
(x). Total period for which the forest land is proposed to be diverted(in years):
60
A-2.
Details of User Agency
(i). Name :
NPCIL
(ii). Address1 :
NUCLEAR POWER CORPORATION OF INDIA LIMITED , 16TH FLOOR , CENTRE-1 , WORLD TRADE CENTRE , CUFFEE PAR
(iii). Address2 :
NUCLEAR POWER CORPORATION OF INDIA LIMITED , 16TH FLOOR , CENTRE-1 , WORLD TRADE CENTRE , CUFFEE PAR
(iv). State :
Maharashtra
(v). District :
Mumbai City
(vi). Pin :
400094
(vii). Landmark :
ANUSHAKTINAGAR
(viii). Email address :
rabanerjee@rediffmail.com
(ix). Landline Telephone No. :
22-25501937
(x). Fax No. :
22-25993287
(xi). Mobile No. :
9869279469
(xii). Website (if any) :
NIL
(xiii). Legal status of User Agency :
Central PSU
A-3.
Details of Person Making Application
(i). First Name:
AWADH
(ii). Middle Name:
KISHOR
(iii). Last Name:
PRASAD
(iv). Gender:
Male
(v). Designation:
ASSOCIATE DIRECTOR
(vi). Address 1:
C-2 BLOCK , ROOM NO -2, NABHIKIYA URJA BHAWAN
(vii). Address 2:
NIL
(viii). State:
Maharashtra
(ix). District:
Mumbai City
(x). Tehsil:
Mumbai
(xi). Pin:
400094
(xii). Landmark:
NIL
(xiii). Email Address:
hvijay1007@gmail.com
(xiv). Landline Telephone No.:
22-25995080
(xv). Fax No.:
022
(xvi). Mobile No.:
9969472201
(xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B.
Details of land required for the Project
B-1.
Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no
Proposal Status.
Proposal No.
Moef File No.
Area Proposed for Diversion(Ha.)
Area Diverted(Ha.)
Date of In-Principle Approval
Date of Final Approval
NIL
B-2.
Details of forest land proposed to be diverted
B-2.1
Details of Divisions involved
Details of Divisions involved
S.no
Division Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Banswara Territorial
100.05
502.67
Total
100.05
502.67
B-2.2
Details of Districts involved
District wise breakup
S.no
District Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Banswara
100.05
502.67
Total
100.05
502.67
B-2.3
Village wise breakup
Villages wise breakup
S.no
Village
Forest Land(ha.)
Non-Forest Land(ha.)
1
Bari
33.58
194.28
2
Adibheet
3.58
148.91
3
Sajwania
28.29
33.19
4
Rel
5.91
93.14
5
Katumbi
10.83
27.41
6
Lalpura
0.43
3.43
7
Wank
17.43
2.31
Total
100.05
502.67
B-2.4
Component wise breakup
Component wise breakup
S.no
Component
Forest Land(ha.)
Non-Forest Land(ha.)
1
Natural draft Cooling Tower
0
14.02
2
Operating Island
1.23
52.48
3
Exclusion Zone
72.58
429.31
4
Pipeline Corridor
26.24
6.86
Total
100.05
502.67
C.
Maps of forest land proposed to be diverted
Division 1. : Banswara Territorial
(i). Area of forest land proposed to be diverted(in ha.) :
100.05
(ii). Nature of the Project:
Non Linear
(a). No. of patches :
One
Patch wise details
Patch No.
Area of Patch(in ha.)
Kml File of Patches
To view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.
100.05
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D.
Justification for locating the Project in forest land and details of alternatives examined:
(i). Copy of note containing justification for locating the Project in forest land:
E.
Employment likely to be generated
(i). Whether the Project is likely to generate employment ?:
Yes
(ii). Permanent/Regular Employment(Number of persons):
1700
(iii). Temporary Employment(Number of person-days):
23920000
F.
Displacement of People due to the Project, if any
(i). Whether Project involves displacement?:
Yes
(a). Total Number of families :
470
(b). Number of Scheduled Caste families :
NIL
(c). Number of Schedule Tribes families :
460
(d). Number of other families :
10
(ii). Copy of Rehabilitation and Resettlement Plan:
(a). Copy of approval to Ministry of Tribal Affairs,Government of India to Rehabilitation and Resettlement:
G.
Details of Cost-Benefit analysis for the Project
(i). Whether the Project requires Cost-Benefit analysis?:
Yes
(a). Copy of Cost-Benefit analysis:
H.
Status of Environmental Clearance
(i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? :
Yes
(a). Status of the Environmental Clearance to the Project:
EC under process
(ii). Environmental Clearance File No.:
J-14011/212014/IA-II(N)
I.
Status of Wildelife Clearance
(i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? :
No
J.
Applicability of special provisions governing Scheduled Areas
(i).Whether the Project or a part thereof is located in a Scheduled Area? :
Yes
K.
Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
(i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? :
Yes
(a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L.
Details of land identified for Compensatory Afforestation
(i). Whether non-forest or Revenue forest land is required to be provided by User Agency?:
Not Applicable
(ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?:
Not Applicable
(iii) . Reason for not providing Non-Forest Land:
Not Applicable
Additional information Details
Documents
S.No
Documents
Remarks
1
Serial wise responses to shortcomings raised by Nodal Officer on 29.12.2016
2
Supporting document in respect of S.No.2 of the shortcoming list.
3
Supporting document in respect of S.No.2 of the shortcoming list.
4
Duly signed GT sheet enclosed in respect of S.No.4 of the shortcoming list.
5
Duly signed DGPS enclosed in respect of S.No.5 of the shortcoming list.
6
Annexure-5 Duly signed R&R copy is enclosed in respect of S.No.7 of the shortcoming list.
7
Annexure-7 Supporting document related to Environment Clearance is enclosed in respect of S.No.9 of the shortcoming list.
8
Annexure-8a Supporting document is enclosed in respect of S.No.10 of the shortcoming list.
9
Annexure-8b Supporting document is enclosed in respect of S.No.10 of the shortcoming list.
10
Project Report is enclosed in respect of S.No. 12.2
11
Certificate for Compensatory Afforestation (Annexure-10b)is enclosed in respect of S.No. 12.3 of the shortcoming list
12
Certificate for use of minimum forest land etc.(Annexure-11 )is enclosed in respect of S.No. 12.4 of the shortcoming list
13
Jamabandi & Revenue Map-Adibheet Village (Annexure-13)is enclosed in respect of S.No.12.6 of the shortcoming list
14
Jamabandi & Revenue Map-Bari Village (Annexure-13)is enclosed in respect of S.No.12.6 of the shortcoming list
15
Jamabandi & Revenue Map-Katumbi Village (Annexure-13)is enclosed in respect of S.No.12.6 of the shortcoming list
16
Jamabandi & Revenue Map-Sajwaniya Village (Annexure-13)is enclosed in respect of S.No.12.6 of the shortcoming list
17
Jamabandi & Revenue Map-Rel Village (Annexure-13)is enclosed in respect of S.No.12.6 of the shortcoming list
18
Jamabandi & Revenue Map-Wank Village (Annexure-13)is enclosed in respect of S.No.12.6 of the shortcoming list
19
Jamabandi & Revenue Map-Lalpura Village (Annexure-13)is enclosed in respect of S.No.12.6 of the shortcoming list
20
Waste Disposal Plan (Annexure-14)is enclosed in respect of S.No.12.7 of the shortcoming list
21
In-Principle Approval (Annexure-4a) is enclosed in respect of S.No.6 of the shortcoming list
22
Serial wise responses to shortcomings raised by Nodal Officer on 11.5.2017
23
Revised GT sheet uploaded as Annexure -1 in respect of S.No.2 of the shortcoming list.
24
Revised DGPS sheet uploaded as Annexure -2 in respect of S.No.3 of the shortcoming list.
25
Relevant Excerpts of Site Selection Committee report is enclosed as Annexure -3 in respect of S.No.4 of the shortcoming list.
26
R&R plan in line with RFCTLARR 2013 is enclosed as Annexure -4 in respect of S.No.5 of the shortcoming list.
27
Highlighted relevant portion of the Award notifying NPCIL approval/acceptance is enclosed as Annexure-5 in respect of S.No-5 of shortcoming list
28
Serial wise responses to shortcomings raised by Nodal Officer on 11.7.2017
29
Supporting document(Authorization letters) in respect of S.No.1 of the shortcoming list.
30
Supporting document(Modified DGPS sheet showing entry and exit point for forest land) in respect of S.No.3 of the shortcoming list.
31
Supporting document(Certificate in respect of non-submission of full report of Site Selection Committee) in respect of S.No.4 of the shortcoming list.
32
Response to letter dated 12.10.2017
33
r&r plan part 1
34
r&r plan part 2
35
r&r plan part 3
36
r&r plan part 4
37
r&r plan part 5
38
Main award part-1
39
Main award part-2
40
Main award part-3
41
Main award part-4
42
Main award part-5
43
Main award part-6
44
R & R package part-1
45
R & R package part-2
46
R & R package part-3
47
R & R package part-4
48
R & R package part-5
49
R & R package part-6
50
Village wise calculation
51
DGPS drawing latest
52
GT sheet latest
53
Bar Chart
54
Cost Benefit Analysis
55
Khasra Wise Calculation
56
Response to DCF letter vide no 6594 dated 28.10.2020
57
Annexure A of letter no NPCIL/MBRAPP-1to4/HQ/2021/M/6 dated 26.02.2021
58
Annexure B of letter no NPCIL/MBRAPP-1to4/HQ/2021/M/6 dated 26.02.2021
59
Annexure C of letter no NPCIL/MBRAPP-1to4/HQ/2021/M/6 dated 26.02.2021
60
Annexure D of letter no NPCIL/MBRAPP-1to4/HQ/2021/M/6 dated 26.02.2021
61
Annexure E of letter no NPCIL/MBRAPP-1to4/HQ/2021/M/6 dated 26.02.2021
62
Annexure F of letter no NPCIL/MBRAPP-1to4/HQ/2021/M/6 dated 26.02.2021
63
Annexure G of letter no NPCIL/MBRAPP-1to4/HQ/2021/M/6 dated 26.02.2021
64
Annexure H of letter no NPCIL/MBRAPP-1to4/HQ/2021/M/6 dated 26.02.2021
65
NPCIL/MBRAPP/2021/266 dated 26.10.2021 for response of DFO letter no 10650 dated 25.10.2021
66
Annexure - 1 of letter no NPCIL/MBRAPP/2021/266 dated 26.10.2021 - DFO letter no 10650 dated 25.10.2021
67
Annexure - 2 of letter no NPCIL/MBRAPP/2021/266 dated 26.10.2021 - Rakba Summary
68
Annexure - 3 of letter no NPCIL/MBRAPP/2021/266 dated 26.10.2021 - Jamma Bandi
69
Annexure - 4 of letter no NPCIL/MBRAPP/2021/266 dated 26.10.2021 - Jamma Bandi
70
Annexure - 5 of letter no NPCIL/MBRAPP/2021/266 dated 26.10.2021 - Revenue Map marking 100 Ha Additional DFL land
71
Annexure - 6 of letter no NPCIL/MBRAPP/2021/266 dated 26.10.2021 - DGPS Map marking 100 Ha Additional DFL land
72
Annexure - 7 of letter no NPCIL/MBRAPP/2021/266 dated 26.10.2021 - KML Map marking 100 Ha Additional DFL land
73
Annexure - 8 of letter no NPCIL/MBRAPP/2021/266 dated 26.10.2021 - GT Map marking 100 Ha Additional DFL land
74
Annexure - 9 of letter no NPCIL/MBRAPP/2021/266 dated 26.10.2021 - CMD letter for Authorized Signatory for Mahi Banswara Project-MBRAPP -1to4
75
Annexure - 10 of letter no NPCIL/MBRAPP/2021/266 dated 26.10.2021 - Undertaking for Payment of cost towards CA on 286 Ha DFL
76
Revised Justification for locating the project in Forest land details of alternative examined
77
Undertaking for payment of Net Present Value of Forest land
78
Undertaking for payment of any other cost and condition
79
Certificate regarding other conditions
80
NPCIL/MBRAPP/2021/319 dated 30.12.2021 for response of DFO letter no 11632 dated 16.12.2021
81
Annexure - 1 of letter no NPCIL/MBRAPP/2021/319 dated 30.12.2021 - Employment details
82
Annexure - 2 of letter no NPCIL/MBRAPP/2021/319 dated 30.12.2021 - Details of trees proposed to be cut
83
Letter to DFO for EDS via letter no NPCIL/MBRAPP/2022/74 dated 02.04.2022
84
Annexure 1A of Letter to DFO for EDS via letter no NPCIL/MBRAPP/2022/74 dated 02.04.2022 Forest Boundary Sajwania Part 1
85
Annexure 1B of Letter to DFO for EDS via letter no NPCIL/MBRAPP/2022/74 dated 02.04.2022 Forest Boundary Sajwania Part 2
86
Annexure 1C of Letter to DFO for EDS via letter no NPCIL/MBRAPP/2022/74 dated 02.04.2022 Forest Boundary Sajwania Part 3
87
Annexure 1D of Letter to DFO for EDS via letter no NPCIL/MBRAPP/2022/74 dated 02.04.2022 Forest Boundary Adi bheet
88
Annexure 1E of Letter to DFO for EDS via letter no NPCIL/MBRAPP/2022/74 dated 02.04.2022 Forest Boundary Katumbi
89
Annexure 1F of Letter to DFO for EDS via letter no NPCIL/MBRAPP/2022/74 dated 02.04.2022 Forest Boundary Bari
90
Annexure 2 of Letter to DFO for EDS via letter no NPCIL/MBRAPP/2022/74 dated 02.04.2022 KML Google Earth
91
Annexure 3 of Letter to DFO for EDS via letter no NPCIL/MBRAPP/2022/74 dated 02.04.2022 DGPS
92
Annexure 4 of Letter to DFO for EDS via letter no NPCIL/MBRAPP/2022/74 dated 02.04.2022 Toposheet
93
Response to DFO letter no 3805 dated 24.06.2022 via NPCIL letter no NPCIL/MBRAPP/2022/158 dated 30.06.2022
94
Annexure-1 (DFO Letter) of NPCIL letter no NPCIL/MBRAPP/2022/158 dated 30.06.2022
95
Annexure-2 (Certificate for locating plant) of NPCIL letter no NPCIL/MBRAPP/2022/158 dated 30.06.2022
96
Annexure-3 (R&R details) of NPCIL letter no NPCIL/MBRAPP/2022/158 dated 30.06.2022
97
Response to item no 3 of EDS 8-10/2022-FC dated 05.12.2022
98
Response to item no 5.1 of EDS 8-10/2022-FC dated 05.12.2022
99
Response to item no 5.2 of EDS 8-10/2022-FC dated 05.12.2022
Print