FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/RJ/Others/22621/2016   (ii). Name of Project for which Forest Land is required : Mahi Banswara Rajasthan Atomic Power Project (MBRAPP)-1 to 4   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Setting up Pressurized Heavy Water Reactor (PHWR) based Nuclear Power Plant with installed capacity of 2800MWe, comprising of four units of 700MWe each(Refer Annexur-1 for details)   (iv). State : Rajasthan   (v). Category of the Proposal : Others   (vi). Shape of forest land proposed to be diverted : Non Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 2978200   (viii). Area of forest land proposed for diversion(in ha.): 100.05   (ix). Non-forest land required for this project(in ha.): 502.67   (x). Total period for which the forest land is proposed to be diverted(in years): 60
A-2. Details of User Agency
  (i). Name : NPCIL   (ii). Address1 : NUCLEAR POWER CORPORATION OF INDIA LIMITED , 16TH FLOOR , CENTRE-1 , WORLD TRADE CENTRE , CUFFEE PAR   (iii). Address2 : NUCLEAR POWER CORPORATION OF INDIA LIMITED , 16TH FLOOR , CENTRE-1 , WORLD TRADE CENTRE , CUFFEE PAR   (iv). State : Maharashtra   (v). District : Mumbai City   (vi). Pin : 400094   (vii). Landmark : ANUSHAKTINAGAR   (viii). Email address : rabanerjee@rediffmail.com   (ix). Landline Telephone No. : 22-25501937   (x). Fax No. : 22-25993287   (xi). Mobile No. : 9869279469   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : Central PSU
A-3. Details of Person Making Application
  (i). First Name: AWADH   (ii). Middle Name: KISHOR   (iii). Last Name: PRASAD   (iv). Gender: Male   (v). Designation: ASSOCIATE DIRECTOR   (vi). Address 1: C-2 BLOCK , ROOM NO -2, NABHIKIYA URJA BHAWAN   (vii). Address 2: NIL   (viii). State: Maharashtra   (ix). District: Mumbai City   (x). Tehsil: Mumbai   (xi). Pin: 400094   (xii). Landmark: NIL   (xiii). Email Address: hvijay1007@gmail.com   (xiv). Landline Telephone No.: 22-25995080   (xv). Fax No.: 022   (xvi). Mobile No.: 9969472201   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Banswara Territorial100.05502.67
Total100.05502.67
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Banswara100.05502.67
Total100.05502.67
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Bari33.58194.28
2Adibheet3.58148.91
3Sajwania28.2933.19
4Rel5.9193.14
5Katumbi10.8327.41
6Lalpura0.433.43
7Wank17.432.31
Total 100.05 502.67
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Natural draft Cooling Tower014.02
2Operating Island1.2352.48
3Exclusion Zone72.58429.31
4Pipeline Corridor26.246.86
Total 100.05 502.67
C. Maps of forest land proposed to be diverted
Division 1. : Banswara Territorial
  (i). Area of forest land proposed to be diverted(in ha.) : 100.05   (ii). Nature of the Project: Non Linear   (a). No. of patches : One
Patch wise details
Patch No. Area of Patch(in ha.) Kml File of PatchesTo view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.100.05    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 1700   (iii). Temporary Employment(Number of person-days): 23920000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: Yes   (a). Total Number of families : 470   (b). Number of Scheduled Caste families : NIL   (c). Number of Schedule Tribes families : 460   (d). Number of other families : 10   (ii). Copy of Rehabilitation and Resettlement Plan:   (a). Copy of approval to Ministry of Tribal Affairs,Government of India to Rehabilitation and Resettlement:
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: Yes   (a). Copy of Cost-Benefit analysis:
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : Yes   (a). Status of the Environmental Clearance to the Project: EC under process   (ii). Environmental Clearance File No.: J-14011/212014/IA-II(N)
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : Yes
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Not Applicable   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Not Applicable   (iii) . Reason for not providing Non-Forest Land: Not Applicable
Additional information Details
Documents
S.No Documents
Remarks
1Serial wise responses to shortcomings raised by Nodal Officer on 29.12.2016
2Supporting document in respect of S.No.2 of the shortcoming list.
3Supporting document in respect of S.No.2 of the shortcoming list.
4Duly signed GT sheet enclosed in respect of S.No.4 of the shortcoming list.
5Duly signed DGPS enclosed in respect of S.No.5 of the shortcoming list.
6Annexure-5 Duly signed R&R copy is enclosed in respect of S.No.7 of the shortcoming list.
7Annexure-7 Supporting document related to Environment Clearance is enclosed in respect of S.No.9 of the shortcoming list.
8Annexure-8a Supporting document is enclosed in respect of S.No.10 of the shortcoming list.
9Annexure-8b Supporting document is enclosed in respect of S.No.10 of the shortcoming list.
10Project Report is enclosed in respect of S.No. 12.2
11Certificate for Compensatory Afforestation (Annexure-10b)is enclosed in respect of S.No. 12.3 of the shortcoming list
12Certificate for use of minimum forest land etc.(Annexure-11 )is enclosed in respect of S.No. 12.4 of the shortcoming list
13Jamabandi & Revenue Map-Adibheet Village (Annexure-13)is enclosed in respect of S.No.12.6 of the shortcoming list
14Jamabandi & Revenue Map-Bari Village (Annexure-13)is enclosed in respect of S.No.12.6 of the shortcoming list
15Jamabandi & Revenue Map-Katumbi Village (Annexure-13)is enclosed in respect of S.No.12.6 of the shortcoming list
16Jamabandi & Revenue Map-Sajwaniya Village (Annexure-13)is enclosed in respect of S.No.12.6 of the shortcoming list
17Jamabandi & Revenue Map-Rel Village (Annexure-13)is enclosed in respect of S.No.12.6 of the shortcoming list
18Jamabandi & Revenue Map-Wank Village (Annexure-13)is enclosed in respect of S.No.12.6 of the shortcoming list
19Jamabandi & Revenue Map-Lalpura Village (Annexure-13)is enclosed in respect of S.No.12.6 of the shortcoming list
20Waste Disposal Plan (Annexure-14)is enclosed in respect of S.No.12.7 of the shortcoming list
21In-Principle Approval (Annexure-4a) is enclosed in respect of S.No.6 of the shortcoming list
22Serial wise responses to shortcomings raised by Nodal Officer on 11.5.2017
23Revised GT sheet uploaded as Annexure -1 in respect of S.No.2 of the shortcoming list.
24Revised DGPS sheet uploaded as Annexure -2 in respect of S.No.3 of the shortcoming list.
25Relevant Excerpts of Site Selection Committee report is enclosed as Annexure -3 in respect of S.No.4 of the shortcoming list.
26R&R plan in line with RFCTLARR 2013 is enclosed as Annexure -4 in respect of S.No.5 of the shortcoming list.
27Highlighted relevant portion of the Award notifying NPCIL approval/acceptance is enclosed as Annexure-5 in respect of S.No-5 of shortcoming list
28Serial wise responses to shortcomings raised by Nodal Officer on 11.7.2017
29Supporting document(Authorization letters) in respect of S.No.1 of the shortcoming list.
30Supporting document(Modified DGPS sheet showing entry and exit point for forest land) in respect of S.No.3 of the shortcoming list.
31Supporting document(Certificate in respect of non-submission of full report of Site Selection Committee) in respect of S.No.4 of the shortcoming list.
32Response to letter dated 12.10.2017
33r&r plan part 1
34r&r plan part 2
35r&r plan part 3
36r&r plan part 4
37r&r plan part 5
38Main award part-1
39Main award part-2
40Main award part-3
41Main award part-4
42Main award part-5
43Main award part-6
44R & R package part-1
45R & R package part-2
46R & R package part-3
47R & R package part-4
48R & R package part-5
49R & R package part-6
50Village wise calculation
51DGPS drawing latest
52GT sheet latest
53Bar Chart
54Cost Benefit Analysis
55Khasra Wise Calculation
56Response to DCF letter vide no 6594 dated 28.10.2020
57Annexure A of letter no NPCIL/MBRAPP-1to4/HQ/2021/M/6 dated 26.02.2021
58Annexure B of letter no NPCIL/MBRAPP-1to4/HQ/2021/M/6 dated 26.02.2021
59Annexure C of letter no NPCIL/MBRAPP-1to4/HQ/2021/M/6 dated 26.02.2021
60Annexure D of letter no NPCIL/MBRAPP-1to4/HQ/2021/M/6 dated 26.02.2021
61Annexure E of letter no NPCIL/MBRAPP-1to4/HQ/2021/M/6 dated 26.02.2021
62Annexure F of letter no NPCIL/MBRAPP-1to4/HQ/2021/M/6 dated 26.02.2021
63Annexure G of letter no NPCIL/MBRAPP-1to4/HQ/2021/M/6 dated 26.02.2021
64Annexure H of letter no NPCIL/MBRAPP-1to4/HQ/2021/M/6 dated 26.02.2021
65NPCIL/MBRAPP/2021/266 dated 26.10.2021 for response of DFO letter no 10650 dated 25.10.2021
66Annexure - 1 of letter no NPCIL/MBRAPP/2021/266 dated 26.10.2021 - DFO letter no 10650 dated 25.10.2021
67Annexure - 2 of letter no NPCIL/MBRAPP/2021/266 dated 26.10.2021 - Rakba Summary
68Annexure - 3 of letter no NPCIL/MBRAPP/2021/266 dated 26.10.2021 - Jamma Bandi
69Annexure - 4 of letter no NPCIL/MBRAPP/2021/266 dated 26.10.2021 - Jamma Bandi
70Annexure - 5 of letter no NPCIL/MBRAPP/2021/266 dated 26.10.2021 - Revenue Map marking 100 Ha Additional DFL land
71Annexure - 6 of letter no NPCIL/MBRAPP/2021/266 dated 26.10.2021 - DGPS Map marking 100 Ha Additional DFL land
72Annexure - 7 of letter no NPCIL/MBRAPP/2021/266 dated 26.10.2021 - KML Map marking 100 Ha Additional DFL land
73Annexure - 8 of letter no NPCIL/MBRAPP/2021/266 dated 26.10.2021 - GT Map marking 100 Ha Additional DFL land
74Annexure - 9 of letter no NPCIL/MBRAPP/2021/266 dated 26.10.2021 - CMD letter for Authorized Signatory for Mahi Banswara Project-MBRAPP -1to4
75Annexure - 10 of letter no NPCIL/MBRAPP/2021/266 dated 26.10.2021 - Undertaking for Payment of cost towards CA on 286 Ha DFL
76Revised Justification for locating the project in Forest land details of alternative examined
77Undertaking for payment of Net Present Value of Forest land
78Undertaking for payment of any other cost and condition
79Certificate regarding other conditions
80NPCIL/MBRAPP/2021/319 dated 30.12.2021 for response of DFO letter no 11632 dated 16.12.2021
81Annexure - 1 of letter no NPCIL/MBRAPP/2021/319 dated 30.12.2021 - Employment details
82Annexure - 2 of letter no NPCIL/MBRAPP/2021/319 dated 30.12.2021 - Details of trees proposed to be cut
83Letter to DFO for EDS via letter no NPCIL/MBRAPP/2022/74 dated 02.04.2022
84Annexure 1A of Letter to DFO for EDS via letter no NPCIL/MBRAPP/2022/74 dated 02.04.2022 Forest Boundary Sajwania Part 1
85Annexure 1B of Letter to DFO for EDS via letter no NPCIL/MBRAPP/2022/74 dated 02.04.2022 Forest Boundary Sajwania Part 2
86Annexure 1C of Letter to DFO for EDS via letter no NPCIL/MBRAPP/2022/74 dated 02.04.2022 Forest Boundary Sajwania Part 3
87Annexure 1D of Letter to DFO for EDS via letter no NPCIL/MBRAPP/2022/74 dated 02.04.2022 Forest Boundary Adi bheet
88Annexure 1E of Letter to DFO for EDS via letter no NPCIL/MBRAPP/2022/74 dated 02.04.2022 Forest Boundary Katumbi
89Annexure 1F of Letter to DFO for EDS via letter no NPCIL/MBRAPP/2022/74 dated 02.04.2022 Forest Boundary Bari
90Annexure 2 of Letter to DFO for EDS via letter no NPCIL/MBRAPP/2022/74 dated 02.04.2022 KML Google Earth
91Annexure 3 of Letter to DFO for EDS via letter no NPCIL/MBRAPP/2022/74 dated 02.04.2022 DGPS
92Annexure 4 of Letter to DFO for EDS via letter no NPCIL/MBRAPP/2022/74 dated 02.04.2022 Toposheet
93Response to DFO letter no 3805 dated 24.06.2022 via NPCIL letter no NPCIL/MBRAPP/2022/158 dated 30.06.2022
94Annexure-1 (DFO Letter) of NPCIL letter no NPCIL/MBRAPP/2022/158 dated 30.06.2022
95Annexure-2 (Certificate for locating plant) of NPCIL letter no NPCIL/MBRAPP/2022/158 dated 30.06.2022
96Annexure-3 (R&R details) of NPCIL letter no NPCIL/MBRAPP/2022/158 dated 30.06.2022
97Response to item no 3 of EDS 8-10/2022-FC dated 05.12.2022
98Response to item no 5.1 of EDS 8-10/2022-FC dated 05.12.2022
99Response to item no 5.2 of EDS 8-10/2022-FC dated 05.12.2022