FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/RJ/OFC/150737/2022   (ii). Name of Project for which Forest Land is required : Laying of Underground Optical Fiber Cable Along the Road Within the Existing Row from Roneeja-Kumaharla to Bundi-Tonk District Border to Dhadrola -Dooni M/s Telesonic Networks Limited (Rajasthan)”   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Laying of Underground Optical Fiber Cable Along the Road Within the Existing Row from Roneeja-Kumaharla to Bundi-Tonk District Border to Dhadrola -Dooni M/s Telesonic Networks Limited (Rajasthan)” Total Route Length=28.620km   (iv). State : Rajasthan   (v). Category of the Proposal : Optical Fibre Cable   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 20   (viii). Area of forest land proposed for diversion(in ha.): 0.4143   (ix). Non-forest land required for this project(in ha.): 0.8736   (x). Total period for which the forest land is proposed to be diverted(in years): 30
A-2. Details of User Agency
  (i). Name : TELESONIC NETWORKS LIMITED   (ii). Address1 : K-21, sunny house, Malviya Marg. C-Scheme, Jaipur   (iii). Address2 : NIL   (iv). State : Rajasthan   (v). District : Jaipur   (vi). Pin : 302001   (vii). Landmark : NIL   (viii). Email address : ashishnain1994@gmail.com   (ix). Landline Telephone No. : 141-4044200   (x). Fax No. : 141-   (xi). Mobile No. : 9772073111   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : Private
A-3. Details of Person Making Application
  (i). First Name: Hitender   (ii). Middle Name: Singh   (iii). Last Name: Sangwan   (iv). Gender: Male   (v). Designation: Senior Manager   (vi). Address 1: C-28, Keshav NAgar, Civil Lines, Jaipur   (vii). Address 2: NIL   (viii). State: Rajasthan   (ix). District: Jaipur   (x). Tehsil: NIL   (xi). Pin: 302006   (xii). Landmark: NIL   (xiii). Email Address: ashishnain1994@gmail.com   (xiv). Landline Telephone No.: 141-2462397   (xv). Fax No.: NIL   (xvi). Mobile No.: 9772073111   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
Proposal Submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
1Under Processing at State GovernmentFP/RJ/OFC/150256/20210.6060
Total 0.606 0
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Tonk Territorial0.14250.6819
2.Bundi Territorial0.27180.1917
Total0.41430.8736
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Tonk0.14250.6819
1.Bundi0.27180.1917
Total0.41430.8736
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Dooni00.0666
2Devpura00.0702
3Bhilwasiya00.0513
4Gothra00.0621
5Anwa0.08640.0477
6Rampura00.0711
7Khawaspura00.0702
8Chak Anandpura00.0846
9Dhardhari0.16380.0252
10Toda ka Gothra0.01170.0261
11Roneeja0.09630.0648
12Hanumanpura00.0612
13Kumaharla00.0756
14Dharola0.05610.0969
Total 0.4143 0.8736
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Laying of Underground Optical Fiber Cable in Tonk0.14250.6819
2Laying of Underground Optical Fiber Cable in Bundi0.27180.1917
Total 0.4143 0.8736
C. Maps of forest land proposed to be diverted
Division 1. : Bundi Territorial
  (i). Area of forest land proposed to be diverted(in ha.) : 0.2718   (ii). Nature of the Project: Linear   (b). No. of Segments : Four
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.0.1638    View File
2.0.0117    View File
3.0.0414    View File
4.0.0549    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
Division 2. : Tonk Territorial
  (i). Area of forest land proposed to be diverted(in ha.) : 0.1425   (ii). Nature of the Project: Linear   (b). No. of Segments : Two
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.0.0864    View File
2.0.0561    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: No   (a). Reason for not providing such map: Cable Along the Road Within the Existing Row
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 8   (iii). Temporary Employment(Number of person-days): 150
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Not Applicable   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Not Applicable   (iii) . Reason for not providing Non-Forest Land: Not Applicable
Additional information Details
Documents
S.No Documents
Remarks
1Authorization Letter
2Company Registration Certificate
3CROSS SECTION OF OFC CABLE
4EDS Reply-06-03-2022
5EDS Reply of 31/03/2022
6Jamabandi & Rajasav Map
7EDS Clearance
8Regarding Sreply of EDS Dated 04-04-2022
9EDS Reply 04-07-2022
10Area Calculation Sheet
11BAR CHART
12CERTIFICATE FOR MINIMUM USE OF FOREST LAND
13Details of Permanent Employment to be Generated
14JUSTIFICATION FOR LOCATING THE PROJECT IN FOREST AREA
15PROJECT REPORT
16UNDERTAKING FOR OF CLAYING WORK WILL BE EXECUTE WITH IN THERIGHT OF WAY ON ROAD SIDE
17UNDERTAKING FOR CONSERVATION OF FLORA-FAUNA AND WILDLIFE ANIMALS DURING LAYING OFC CABLE
18UNDERTAKING FOR MUCK DISPOSAL DURING LAYING
19UNDERTAKING FOR NO CHANGE SINSTATUTORY POSITION OF DIVERTED FOREST LAND
20UNDERTAKING FOR NO TREE CUTTING DURING LAYING
21UNDERTAKING FOR PAYMENT OF ANY OTHER COSTANDCONDITION
22UNDERTAKING FOR PAYMENT OF COST OF COMPENSATORYAF FORESTATION
23UNDERTAKING FOR PAYMENT OF NET PRESENT VALUE OF FOREST AREA
24UNDERTAKING FOR THE PROPOSED AREA DOES NOT FALL IN SANCTUARY OR NATIONAL PARK
25UNDERTAKING FOR USE OF ANY MATERIAL FROM SURROUNDED FOREST LAND DURING LAYING OFC CABLE
26UNDERTAKING FOR USE OF FOREST LAND
27UNDERTAKING FOR VARIOUS POINTS
28UNDERTAKING FOR WASTE MANAGEMENT DURING CONSTRUCTION ACTIVITY
29UNDERTAKING OF FRA CERTIFICATE
30Village Wise Area calculation Sheet
31EDS Reply Bundi Division-31-10-2022
32EDS Reply Tonk Division-31-10-2022
3331-10-2022 EDS Reply on 10-11-2022
34PWD NOC
35EDS Reply to DCF Tonk-02-12-2022
36EDS Reply to DCF Bundi-07-12-2022
37Map Showing for Geo-Refracted Survey of India Toposheet With Laying of Underground Optical Fiber Cable Along the Road Within the Existing Row from Roneeja-Kumaharla to Bundi-Tonk District Border to Dhadrola -Dooni Scale 1 : 50000
38Geo-Refracted Digital map Showing for Required Land Coordinate With Laying of Underground Optical Fiber Cable Along the Road Within the Existing Row from Roneeja-Kumaharla to Bundi-Tonk District Border to Dhadrola -Dooni
39EDS Reply-18-01-2023