FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A.
General Details
A-1.
Project Details
(i). Proposal No. :
FP/RJ/OFC/150737/2022
(ii). Name of Project for which Forest Land is required :
Laying of Underground Optical Fiber Cable Along the Road Within the Existing Row from Roneeja-Kumaharla to Bundi-Tonk District Border to Dhadrola -Dooni M/s Telesonic Networks Limited (Rajasthan)”
(iii). Short narrative of the proposal and Project/scheme for which the forest land is required :
Laying of Underground Optical Fiber Cable Along the Road Within the Existing Row from Roneeja-Kumaharla to Bundi-Tonk District Border to Dhadrola -Dooni M/s Telesonic Networks Limited (Rajasthan)” Total Route Length=28.620km
(iv). State :
Rajasthan
(v). Category of the Proposal :
Optical Fibre Cable
(vi). Shape of forest land proposed to be diverted :
Linear
(vii). Estimated cost of the Project(Rupees in lacs) :
20
(viii). Area of forest land proposed for diversion(in ha.):
0.4143
(ix). Non-forest land required for this project(in ha.):
0.8736
(x). Total period for which the forest land is proposed to be diverted(in years):
30
A-2.
Details of User Agency
(i). Name :
TELESONIC NETWORKS LIMITED
(ii). Address1 :
K-21, sunny house, Malviya Marg. C-Scheme, Jaipur
(iii). Address2 :
NIL
(iv). State :
Rajasthan
(v). District :
Jaipur
(vi). Pin :
302001
(vii). Landmark :
NIL
(viii). Email address :
ashishnain1994@gmail.com
(ix). Landline Telephone No. :
141-4044200
(x). Fax No. :
141-
(xi). Mobile No. :
9772073111
(xii). Website (if any) :
NIL
(xiii). Legal status of User Agency :
Private
A-3.
Details of Person Making Application
(i). First Name:
Hitender
(ii). Middle Name:
Singh
(iii). Last Name:
Sangwan
(iv). Gender:
Male
(v). Designation:
Senior Manager
(vi). Address 1:
C-28, Keshav NAgar, Civil Lines, Jaipur
(vii). Address 2:
NIL
(viii). State:
Rajasthan
(ix). District:
Jaipur
(x). Tehsil:
NIL
(xi). Pin:
302006
(xii). Landmark:
NIL
(xiii). Email Address:
ashishnain1994@gmail.com
(xiv). Landline Telephone No.:
141-2462397
(xv). Fax No.:
NIL
(xvi). Mobile No.:
9772073111
(xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B.
Details of land required for the Project
B-1.
Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
Proposal Submitted in Past
S.no
Proposal Status.
Proposal No.
Moef File No.
Area Proposed for Diversion(Ha.)
Area Diverted(Ha.)
Date of In-Principle Approval
Date of Final Approval
1
Under Processing at State Government
FP/RJ/OFC/150256/2021
0.606
0
Total
0.606
0
B-2.
Details of forest land proposed to be diverted
B-2.1
Details of Divisions involved
Details of Divisions involved
S.no
Division Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Tonk Territorial
0.1425
0.6819
2.
Bundi Territorial
0.2718
0.1917
Total
0.4143
0.8736
B-2.2
Details of Districts involved
District wise breakup
S.no
District Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Tonk
0.1425
0.6819
1.
Bundi
0.2718
0.1917
Total
0.4143
0.8736
B-2.3
Village wise breakup
Villages wise breakup
S.no
Village
Forest Land(ha.)
Non-Forest Land(ha.)
1
Dooni
0
0.0666
2
Devpura
0
0.0702
3
Bhilwasiya
0
0.0513
4
Gothra
0
0.0621
5
Anwa
0.0864
0.0477
6
Rampura
0
0.0711
7
Khawaspura
0
0.0702
8
Chak Anandpura
0
0.0846
9
Dhardhari
0.1638
0.0252
10
Toda ka Gothra
0.0117
0.0261
11
Roneeja
0.0963
0.0648
12
Hanumanpura
0
0.0612
13
Kumaharla
0
0.0756
14
Dharola
0.0561
0.0969
Total
0.4143
0.8736
B-2.4
Component wise breakup
Component wise breakup
S.no
Component
Forest Land(ha.)
Non-Forest Land(ha.)
1
Laying of Underground Optical Fiber Cable in Tonk
0.1425
0.6819
2
Laying of Underground Optical Fiber Cable in Bundi
0.2718
0.1917
Total
0.4143
0.8736
C.
Maps of forest land proposed to be diverted
Division 1. : Bundi Territorial
(i). Area of forest land proposed to be diverted(in ha.) :
0.2718
(ii). Nature of the Project:
Linear
(b). No. of Segments :
Four
Segment wise details
Segments
Segment Area(in ha.)
Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.
0.1638
View File
2.
0.0117
View File
3.
0.0414
View File
4.
0.0549
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
Division 2. : Tonk Territorial
(i). Area of forest land proposed to be diverted(in ha.) :
0.1425
(ii). Nature of the Project:
Linear
(b). No. of Segments :
Two
Segment wise details
Segments
Segment Area(in ha.)
Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.
0.0864
View File
2.
0.0561
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D.
Justification for locating the Project in forest land and details of alternatives examined:
(i). Copy of note containing justification for locating the Project in forest land:
(ii). Whether a copy of map indicating location of alternative examine is required to be provided:
No
(a). Reason for not providing such map:
Cable Along the Road Within the Existing Row
E.
Employment likely to be generated
(i). Whether the Project is likely to generate employment ?:
Yes
(ii). Permanent/Regular Employment(Number of persons):
8
(iii). Temporary Employment(Number of person-days):
150
F.
Displacement of People due to the Project, if any
(i). Whether Project involves displacement?:
No
G.
Details of Cost-Benefit analysis for the Project
(i). Whether the Project requires Cost-Benefit analysis?:
No
H.
Status of Environmental Clearance
(i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? :
No
I.
Status of Wildelife Clearance
(i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? :
No
J.
Applicability of special provisions governing Scheduled Areas
(i).Whether the Project or a part thereof is located in a Scheduled Area? :
No
K.
Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
(i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? :
Yes
(a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L.
Details of land identified for Compensatory Afforestation
(i). Whether non-forest or Revenue forest land is required to be provided by User Agency?:
Not Applicable
(ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?:
Not Applicable
(iii) . Reason for not providing Non-Forest Land:
Not Applicable
Additional information Details
Documents
S.No
Documents
Remarks
1
Authorization Letter
2
Company Registration Certificate
3
CROSS SECTION OF OFC CABLE
4
EDS Reply-06-03-2022
5
EDS Reply of 31/03/2022
6
Jamabandi & Rajasav Map
7
EDS Clearance
8
Regarding Sreply of EDS Dated 04-04-2022
9
EDS Reply 04-07-2022
10
Area Calculation Sheet
11
BAR CHART
12
CERTIFICATE FOR MINIMUM USE OF FOREST LAND
13
Details of Permanent Employment to be Generated
14
JUSTIFICATION FOR LOCATING THE PROJECT IN FOREST AREA
15
PROJECT REPORT
16
UNDERTAKING FOR OF CLAYING WORK WILL BE EXECUTE WITH IN THERIGHT OF WAY ON ROAD SIDE
17
UNDERTAKING FOR CONSERVATION OF FLORA-FAUNA AND WILDLIFE ANIMALS DURING LAYING OFC CABLE
18
UNDERTAKING FOR MUCK DISPOSAL DURING LAYING
19
UNDERTAKING FOR NO CHANGE SINSTATUTORY POSITION OF DIVERTED FOREST LAND
20
UNDERTAKING FOR NO TREE CUTTING DURING LAYING
21
UNDERTAKING FOR PAYMENT OF ANY OTHER COSTANDCONDITION
22
UNDERTAKING FOR PAYMENT OF COST OF COMPENSATORYAF FORESTATION
23
UNDERTAKING FOR PAYMENT OF NET PRESENT VALUE OF FOREST AREA
24
UNDERTAKING FOR THE PROPOSED AREA DOES NOT FALL IN SANCTUARY OR NATIONAL PARK
25
UNDERTAKING FOR USE OF ANY MATERIAL FROM SURROUNDED FOREST LAND DURING LAYING OFC CABLE
26
UNDERTAKING FOR USE OF FOREST LAND
27
UNDERTAKING FOR VARIOUS POINTS
28
UNDERTAKING FOR WASTE MANAGEMENT DURING CONSTRUCTION ACTIVITY
29
UNDERTAKING OF FRA CERTIFICATE
30
Village Wise Area calculation Sheet
31
EDS Reply Bundi Division-31-10-2022
32
EDS Reply Tonk Division-31-10-2022
33
31-10-2022 EDS Reply on 10-11-2022
34
PWD NOC
35
EDS Reply to DCF Tonk-02-12-2022
36
EDS Reply to DCF Bundi-07-12-2022
37
Map Showing for Geo-Refracted Survey of India Toposheet With Laying of Underground Optical Fiber Cable Along the Road Within the Existing Row from Roneeja-Kumaharla to Bundi-Tonk District Border to Dhadrola -Dooni Scale 1 : 50000
38
Geo-Refracted Digital map Showing for Required Land Coordinate With Laying of Underground Optical Fiber Cable Along the Road Within the Existing Row from Roneeja-Kumaharla to Bundi-Tonk District Border to Dhadrola -Dooni
39
EDS Reply-18-01-2023
Print