FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/RJ/OFC/122165/2021   (ii). Name of Project for which Forest Land is required : Permission for laying underground OFC in ROW of existing PWD road from Ajmer to Harsore from Lat/long point 26.6671/74.704598 to 26.666798/74.715323 for total and area in forest are 1.071 KM & 0.0482 ha   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Permission for laying underground OFC in ROW of existing PWD road from Ajmer to Harsore from Lat/long point 26.6671/74.704598 to 26.666798/74.715323 for total and area in forest are 1.071 KM & 0.0482 ha in Nagaur District, Rajasthan   (iv). State : Rajasthan   (v). Category of the Proposal : Optical Fibre Cable   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 3.321   (viii). Area of forest land proposed for diversion(in ha.): 0.0482   (ix). Non-forest land required for this project(in ha.): 0   (x). Total period for which the forest land is proposed to be diverted(in years): 30
A-2. Details of User Agency
  (i). Name : JIO DIGITAL FIBER PVT LTD   (ii). Address1 : 1st floor, Anand Bhawan,SC Road, Jaipur   (iii). Address2 : NIL   (iv). State : Rajasthan   (v). District : Jaipur   (vi). Pin : 302001   (vii). Landmark : Near GPO   (viii). Email address : aashish.a.sharma@ril.com   (ix). Landline Telephone No. : 141-3554352   (x). Fax No. : 141-   (xi). Mobile No. : 9314401011   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : Private
A-3. Details of Person Making Application
  (i). First Name: Suresh Kumar Singhal   (ii). Middle Name: NIL   (iii). Last Name: NIL   (iv). Gender: Male   (v). Designation: AVP   (vi). Address 1: 1st floor, Anand Bhawan, SC Road, Jaipur   (vii). Address 2: NIL   (viii). State: Rajasthan   (ix). District: Jaipur   (x). Tehsil: Jaipur   (xi). Pin: 302001   (xii). Landmark: Near GPO   (xiii). Email Address: ashwani.pundir0@gmail.com   (xiv). Landline Telephone No.: 141-3554352   (xv). Fax No.: NIL   (xvi). Mobile No.: 9414030898   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Nagaur Territorial0.04820
Total0.04820
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Nagaur0.04820
Total0.04820
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Charnawas0.04820
Total 0.0482 0
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1OFC laying with in existing ROW of road in Nagaur0.04820
Total 0.0482 0
C. Maps of forest land proposed to be diverted
Division 1. : Nagaur Territorial
  (i). Area of forest land proposed to be diverted(in ha.) : 0.0482   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.0.0482    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: No   (a). Reason for not providing such map: No Alternate path available with in same span
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 0   (iii). Temporary Employment(Number of person-days): 20
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Not Applicable   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Not Applicable   (iii) . Reason for not providing Non-Forest Land: Not Applicable
Additional information Details
Documents
S.No Documents
Remarks
1Area Calculation
2Cross section
3Declaration for Area less than 50 Ha
4Details and status of previous project
5Draft Estimate
6JDFPL IP Registration certificate
7POA
8Project Note JDFPL
9UNDERTAKING FOR ANY OTHER CONDITION IMPOSED AS PER RULE
10UNDERTAKING FOR COMPENSATORY AFFORESTATION
11UNDERTAKING FOR MINIMUM USE OF LAND
12Undertaking for no other project on same route New
13UNDERTAKING FOR NO USE of FOREST PRODUCE
14UNDERTAKING FOR PAYMENT OF NET PRESENT VALUE
15Undertaking for various points
16Undertaking no damage to plantation new
17UT for FRA
18Sir, Please find enclosed EDS reply of (UT for Ajmer Harsore and letter Aug 2021. PWD Permission copy and DCF Nagaur letter is uploaded Separately)
19EDS Reply (4 Aug21) - PWD Permission Copy
20EDS Reply (4 Aug21) - Ajmer-Harsor Forest Nagaur Letter for non wildlife and national park
21Rev Bar Chart
22Rev Topo Sheet
23Revised GPS map
24EDS reply 20.09.21
25EDS Reply- 28/02/22, Document submitted
26EDS Reply for CD submission
27EDS Reply -letter-16.0521
28EDS Reply16.05.21 -PWD Permission
29EDS reply -10Jun22-122165
30EDS reply 23.06.22 -UT for no alternate path revised
31Sir, We have already replied for EDS. Copy of the same enclosed
32EDS Reply 25September22
33EDS Reply 8 Dec22