FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/RJ/Approach/149575/2021   (ii). Name of Project for which Forest Land is required : “Construction of Approach Access for Proposed Hindustan Petroleum Corporation Retail Outlet on NH -11 (New-NH-21) LHS on Khasra No 476, Chainage 75/776 to 75/824, At Village – Sewla, Tehsil -Nadabai,   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : “Construction of Approach Access for Proposed Hindustan Petroleum Corporation Retail Outlet on NH -11 (New-NH-21) LHS on Khasra No 476, Chainage 75/776 to 75/824, At Village – Sewla, Tehsil -Nadabai, District – Bharatpur (Rajasthan)”   (iv). State : Rajasthan   (v). Category of the Proposal : Approach Access   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 45   (viii). Area of forest land proposed for diversion(in ha.): 0.1409   (ix). Non-forest land required for this project(in ha.): 0.213   (x). Total period for which the forest land is proposed to be diverted(in years): 20
A-2. Details of User Agency
  (i). Name : HINDUSTAN PETROLIUM CORPORATION LIMITED   (ii). Address1 : KOTA RETAIL REGION,3-A-5,RANGBARI MAIN ROAD,TALWANDI, KOTA   (iii). Address2 : NIL   (iv). State : Rajasthan   (v). District : Kota   (vi). Pin : 324005   (vii). Landmark : RANGABARI MAIN ROAD   (viii). Email address : naharsingh0732@gmail.com   (ix). Landline Telephone No. : 744-2422411   (x). Fax No. : 744-   (xi). Mobile No. : 9929761556   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : Central PSU
A-3. Details of Person Making Application
  (i). First Name: Devansh   (ii). Middle Name: NIL   (iii). Last Name: Jindal   (iv). Gender: Male   (v). Designation: Sales Officer   (vi). Address 1: KOTA RETAIL REGION,3-A-5,RANGABARI MAIN ROAD , TALWANDI, KOTA   (vii). Address 2: NIL   (viii). State: Rajasthan   (ix). District: Kota   (x). Tehsil: Ladpura   (xi). Pin: 324005   (xii). Landmark: RANGBARI MAIN ROAD   (xiii). Email Address: naharsingh073@gmail.com   (xiv). Landline Telephone No.: 744-2422411   (xv). Fax No.: NIL   (xvi). Mobile No.: 9929761556   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Bharatpur Territorial0.14090.213
Total0.14090.213
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Bharatpur0.14090.213
Total0.14090.213
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Sewla0.14090.213
Total 0.1409 0.213
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Deceleration Lane0.0450.012
2Acceleration Lane0.0750.012
3Front Side (Service Access )0.02090
4Retail Outlet00.189
Total 0.1409 0.213
C. Maps of forest land proposed to be diverted
Division 1. : Bharatpur Territorial
  (i). Area of forest land proposed to be diverted(in ha.) : 0.1409   (ii). Nature of the Project: Linear   (b). No. of Segments : Three
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.0.045    View File
2.0.075    View File
3.0.0209    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: No   (a). Reason for not providing such map: NH-11(New NH-21) side land is declared as protecte
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 9   (iii). Temporary Employment(Number of person-days): 150
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Not Applicable   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Not Applicable   (iii) . Reason for not providing Non-Forest Land: Not Applicable
Additional information Details
Documents
S.No Documents
Remarks
1LOI LETTER
2Authorization Letter
3Morth Permission
4Approved layout plan
5AREA CALCULATION SHEET
6BAR CHART
7CERTIFICATE FOR MINIMUM USE OF FOREST LAND
8CERTIFICATE TOWARD MUCK DISPOSAL AND MANAGMENT PLAN
9Details of Permanent Employment to be Generated
10JUSTIFICATION FOR LOCATING THE PROJECT IN FOREST AREA
11PROJECT RE REPORT
12STATEMENT SHOWING DETAILS OF FOREST AREA PROPOSED FOR DIVERSION
13STATEMENT SHOWING DETAILS OF NON FOREST AREA INVOLVED IN THE PROPOSAL
14UNDERTAKING FOR CONSERVATION OF FLORA-FAUNA AND WILDLIFE ANIMALS DURING APPROACH ACCESS CONSTRUCTION
15UNDERTAKING FOR FRA CERTIFICATE
16UNDERTAKING FOR HIGH TENSION LINE
17UNDERTAKING FOR LP GAS GODOWN
18UNDERTAKING FOR MUCK DISPOSAL DURING CONSTRUCTION OF APPROACH ACCESS
19UNDERTAKING FOR NO CHANGE S IN STATUTORY POSITION OF DIVERTED FOREST LAND
20UNDERTAKING FOR PAYMENT OF ANY OTHER COST AND CONDITION
21UNDERTAKING FOR PAYMENT OF COST OF COMPENSATORY AFFORESTATION
22UNDERTAKING FOR PAYMENT OF NET PRESENT VALUE OF FOREST AREA
23UNDERTAKING FOR SITE SELECTION AND DISTANCE BETWEEN RETAIL OUTLET ON EITHER SIDE
24UNDERTAKING FOR USE OF ANY MATERIAL FROM SURROUNDED FOREST
25UNDERTAKING FOR WASTE MANAGEMENT DURING CONSTRUCTION ACTIVITY
26JAMABANDI AND KHASRA BY PATWARI
27GEO-REFERENCED SURVEY OF INDIA TOPOSHEET WITH PROPOSED APPROACH ROAD ALIGNMENT Full Toposheet NO 54E/8 SCALE 1 : 50,000
28Geo-Referenced DGPS Map Showing for Required Land Coordinate with Proposed Approach Accesses Alignment
29Geo-Referenced Google Imagery Map
30KHASRA MAP SUPER IMPOSED Scale 1 : 4000
31LAND CONVERSION DOCUMENT