FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/RJ/Approach/146453/2021   (ii). Name of Project for which Forest Land is required : Construction of Approach Access for Proposed Hindustan Petroleum Corporation Retail Outlet on Barmer- Sanchor Road NH-68 (RHS) on Khasra No-2684/2195 & 3147/2195 (Patta No F-8/90A/2013/15164) Chainage 157/766 to157/786, At Village – Barmer Gadan Tehsil & District – Barmer(Rajasthan)   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Construction of Approach Access for Proposed Hindustan Petroleum Corporation Retail Outlet on Barmer- Sanchor Road NH-68 (RHS) on Khasra No-2684/2195 & 3147/2195 (Patta No F-8/90A/2013/15164) Chainage 157/766 to157/786, At Village – Barmer Gadan Tehsil & District – Barmer(Rajasthan)   (iv). State : Rajasthan   (v). Category of the Proposal : Approach Access   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 45   (viii). Area of forest land proposed for diversion(in ha.): 0.0435   (ix). Non-forest land required for this project(in ha.): 0.0655   (x). Total period for which the forest land is proposed to be diverted(in years): 19.90
A-2. Details of User Agency
  (i). Name : Hindustan Petroleum Corporation Limited   (ii). Address1 : HINDUSTAN PETROLEUM CORPORATION LIMITED , Jodhpur Retail Region, Bhagat ki Kothi Diesel shed Road,Jodhpur   (iii). Address2 : NIL   (iv). State : Rajasthan   (v). District : Jodhpur   (vi). Pin : 342005   (vii). Landmark : Bhagat ki Kothi   (viii). Email address : gautamchanddoshi@gmail.com   (ix). Landline Telephone No. : 0-   (x). Fax No. : 0-   (xi). Mobile No. : 7073763316   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : Central PSU
A-3. Details of Person Making Application
  (i). First Name: Krishan   (ii). Middle Name: NIL   (iii). Last Name: Lal   (iv). Gender: Male   (v). Designation: Dy General Manager   (vi). Address 1: Hindustan Petroleum Corporation Limited , Jodhpur Retail Region, Bhagat ki Kothi , Diesel Shed Road, Jodhpur   (vii). Address 2: NIL   (viii). State: Rajasthan   (ix). District: Jodhpur   (x). Tehsil: Jodhpur   (xi). Pin: 342005   (xii). Landmark: NIL   (xiii). Email Address: gautamchanddoshi@gmail.com   (xiv). Landline Telephone No.: 0-   (xv). Fax No.: NIL   (xvi). Mobile No.: 7073763316   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Barmer Territorial0.04350.0655
Total0.04350.0655
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Barmer0.04350.0655
Total0.04350.0655
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Barmer Gadan0.04350.0655
Total 0.0435 0.0655
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Deceleration Lane0.0230.01275
2Front Side (Service Road )0.00250
3Acceleration Lane0.0180.01275
4Proposed Retail Outlet00.04
Total 0.0435 0.0655
C. Maps of forest land proposed to be diverted
Division 1. : Barmer Territorial
  (i). Area of forest land proposed to be diverted(in ha.) : 0.0435   (ii). Nature of the Project: Linear   (b). No. of Segments : Three
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.0.023    View File
2.0.0025    View File
3.0.018    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: No   (a). Reason for not providing such map: NH-68 side land is declared as protected forest St
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 9   (iii). Temporary Employment(Number of person-days): 150
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Not Applicable   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Not Applicable   (iii) . Reason for not providing Non-Forest Land: Not Applicable
Additional information Details
Documents
S.No Documents
Remarks
1LOI LETTER
2APPROVED LAYOUT PLAN
3MORTH PERMISSION
4Area Calculation Sheet
5CERTIFICATE FOR MINIMUM USE OF FOREST LAND
6CERTIFICATE TOWARD MUCK DISPOSAL AND MANAGMENT PLAN
7Details of Permanent Employment to be Generated
8JUSTIFICATION FOR LOCATING THE PROJECT IN FOREST AREA
9LAND DOCUMENT
10NH JAMABANDI COPY
11JAMABANDI COPY
12PROJECT RE REPORT
13STATEMENT SHOWING DETAILS OF FOREST AREA PROPOSED FOR DIVERSION
14UNDERTAKING FOR CONSERVATION OF FLORA-FAUNA AND WILDLIFE ANIMALS DURING APPROACH ACCESS CONSTRUCTION
15UNDERTAKING FOR FRA CERTIFICATE
16UNDERTAKING FOR NO HIGH TENSION LINE
17UNDERTAKING FOR LP GAS GODOWN
18UNDERTAKING FOR MUCK DISPOSAL DURING CONSTRUCTION OF APPROACH ACCESS
19UNDERTAKING FOR NO CHANGE’S IN STATUTORY POSITION OF DIVERTED FOREST LAND
20UNDERTAKING FOR PAYMENT OF ANY OTHER COST AND CONDITION
21UNDERTAKING FOR PAYMENT OF COST OF COMPENSATORY AFFORESTATION
22UNDERTAKING FOR PAYMENT OF NET PRESENT VALUE OF FOREST AREA
23UNDERTAKING FOR SITE SELECTION and DISTANCE BETWEEN RETAIL OUTLET ON EITHER SIDE
24UNDERTAKING FOR USE OF ANY MATERIAL FROM SURROUNDED FOREST
25UNDERTAKING FOR WASTE MANAGEMENT DURING CONSTRUCTION ACTIVITY
26PATTA SUPER IMPOSED
27Geo-Referenced DGPMS Required Land Coordinates with proposed Retail Outlet
28Map Showing Geo-Referenced for Survey of India Toposheet With Proposed Retail Outlet Full Toposheet No 40 O/6 Scale 1: 50000
29Geo-Referenced Google Imagery Map with proposed Retail Outlet
30EDS Reply HPCL -07-09-2021
31BAR CHART
32Power of Attorney KL 19Nov19
33STATEMENT SHOWING DETAILS OF NON-FOREST AREA PROPOSED FOR DIVERSION