FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/PB/ROAD/29749/2017   (ii). Name of Project for which Forest Land is required : Construction of Access road to Retail Outlet of Essar Oil Limited at Bahadurpur Fakira   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Diversion of 0.074591 Ha. of Forest land for construction of Access road to the proposed retail outlet for Essar Oil Ltd. Situated at Village Bahadurpur Fakira on Patiala - Pehowa road, SH - 8, Between KM Stone No 24 - 25 at RD KM 24.664. L.H.S., Tehsil Dudhan Sadhan Distt. Patiala   (iv). State : Punjab   (v). Category of the Proposal : Road   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 60   (viii). Area of forest land proposed for diversion(in ha.): 0.074591   (ix). Non-forest land required for this project(in ha.): 0.137467   (x). Total period for which the forest land is proposed to be diverted(in years): 15
A-2. Details of User Agency
  (i). Name : ESSAR OIL LIMITED MOHALI   (ii). Address1 : Plot No. F-33, 3rd Floor,Phase - III, Industrial Area, Mohali (SAS Nagar)   (iii). Address2 : NIL   (iv). State : Punjab   (v). District : SAS Nagar   (vi). Pin : 160071   (vii). Landmark : NIL   (viii). Email address : puran1985@gmail.com   (ix). Landline Telephone No. : 988-8699891   (x). Fax No. : 988-   (xi). Mobile No. : 9888699891   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : Private
A-3. Details of Person Making Application
  (i). First Name: Sandeep   (ii). Middle Name: NIL   (iii). Last Name: Sharma   (iv). Gender: Male   (v). Designation: Divisional Engineer   (vi). Address 1: Plot No. F-33, 3rd Floor, Phase - VIII, Industrial Area, Mohali (SAS NAGAR)   (vii). Address 2: NIL   (viii). State: Punjab   (ix). District: SAS Nagar   (x). Tehsil: S.A.S.Nagar (Mohali)   (xi). Pin: 160071   (xii). Landmark: NIL   (xiii). Email Address: puran1985@gmail.com   (xiv). Landline Telephone No.: 988-8699891   (xv). Fax No.: NIL   (xvi). Mobile No.: 9888699891   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Patiala0.0745910.137467
Total0.0745910.137467
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Patiala0.0745910.137467
Total0.0745910.137467
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Bahadurpur Fakira0.0745910.137467
Total 0.074591 0.137467
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
11. Project Site Area00.137467
22. Entry Side - Area of A10.0088570
33. Entry Side- Area of A20.0124890
44. Entry Side- Area of A30.0032680
55. Entry Side- Area of A40.0002260
66. Exit Side- Area of B10.008250
77. Exit Side- Area of B20.0380970
88. Exit Side- Area of B30.0032740
99. Exit Side- Area of B40.000130
Total 0.074591 0.137467
C. Maps of forest land proposed to be diverted
Division 1. : Patiala
  (i). Area of forest land proposed to be diverted(in ha.) : 0.074591   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.0.074591    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 8   (iii). Temporary Employment(Number of person-days): 0
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Not Applicable   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Not Applicable   (iii) . Reason for not providing Non-Forest Land: Not Applicable
Additional information Details
Documents
S.No Documents
Remarks
1Blue Map
2Geo Reference Map
3LOI
4NOC from Agriculture Dept in English
5NOC from Agriculture Dept in Punjabi
6NOC from District Development and Panchayat officer in English
7NOC from District Development and Panchayat officer in Punjabi
8NOC from Fire Brigade Officer in English
9NOC from Fire Brigade Officer in Punjabi
10NOC from Punjab Polution Control Board in English
11NOC from Punjab Polution Control Board in Punjabi
12NOC from PUDA in English
13NOC from PUDA in Punjabi
14NOC from SDM in English
15NOC from SDM in Punjabi
16NOC from SSP in English
17NOC from SSP in Punjabi
18Registry in English
19Registry in Punjabi
20Sajra Plan
21Toposheet
22NOC from DTP in English
23NOC from DTP in Punjabi
24PWD Approved Drawing.
25PWD NOC in English
26PWD NOC in Punjabi
27DTP Final NOC in English
28DTP Final NOC in Punjabi
29Schedule Tribe Certificate (FRA 2006)
30Jmabandi in English
31Jamabandi in Punjabi
32Certificate of Name Changing of the company
33Power of Attorney
34Covering Letter
35Application
36Application 2
37Annexure A
38Affidavit
39Certificate
40Detail Note of the Project
41Form A
42Justification
43Minimum Use of Forest land
44Undertaking for Additional NPV
45Undertaking for CA
46Undertaking for Cost of trees
47Undertaking for No High Tension Line
48Undertaking for NO LPG Godown
49Undertaking for No Other Retail Outlet and Toll Plaza
50Undertaking for No Railway Overbridge
51Undertaking for NPV
52Undertaking
53Detail of Non Forest Land
54Letter
55Justification for Environment Clearance
56Doc
57Name of Village Clarification Doc
58Name of Village Clarification
59Letter 2
60Letter 3
61Documents
62Undertaking for FCA 1980
63Undertaking Reg Change Name of Essar oil to Nayara Energy Limited