FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A.
General Details
A-1.
Project Details
(i). Proposal No. :
FP/OR/MIN/13031/2015
(ii). Name of Project for which Forest Land is required :
Gandhamardan Block A
(iii). Short narrative of the proposal and Project/scheme for which the forest land is required :
The mining lease area over 618.576ha is confined within the Latitudes: 21°36’08.5824”–21°37’42.0708” North and Longitudes: 85°29’13.0596”–85°31’16.7844” East as per the Survey of India Topo sheets bearing No. 73 G/6 and 73 G/10 in 1:50000 scale. Geographically it is located at a distance of 13 from
(iv). State :
Orissa
(v). Category of the Proposal :
Mining
(vi). Shape of forest land proposed to be diverted :
Non Linear
(vii). Estimated cost of the Project(Rupees in lacs) :
10962.3135
(viii). Area of forest land proposed for diversion(in ha.):
401.7824
(ix). Non-forest land required for this project(in ha.):
46.6379
(x). Total period for which the forest land is proposed to be diverted(in years):
5
A-2.
Details of User Agency
(i). Name :
ODISHA MINING CORPORATION LTD
(ii). Address1 :
OMC House
(iii). Address2 :
Bhubaneswar
(iv). State :
Orissa
(v). District :
Khordha
(vi). Pin :
751012
(vii). Landmark :
Adjacent to Assembly House
(viii). Email address :
fdp.omc@gmail.com
(ix). Landline Telephone No. :
674-2377458
(x). Fax No. :
674-647
(xi). Mobile No. :
9437134765
(xii). Website (if any) :
www.orissamining.com
(xiii). Legal status of User Agency :
State PSU
A-3.
Details of Person Making Application
(i). First Name:
Suman Krishna
(ii). Middle Name:
NIL
(iii). Last Name:
Sit
(iv). Gender:
Female
(v). Designation:
General Manager (Geo)
(vi). Address 1:
Odisha Mining Corporation Ltd., OMC House, Bhubaneswar
(vii). Address 2:
NIL
(viii). State:
Orissa
(ix). District:
Khordha
(x). Tehsil:
bhubaneswar
(xi). Pin:
751012
(xii). Landmark:
Adjacent to Assembly House
(xiii). Email Address:
fdp.omc@gmail.com
(xiv). Landline Telephone No.:
674-2377458
(xv). Fax No.:
06742377458
(xvi). Mobile No.:
9937297830
(xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B.
Details of land required for the Project
B-1.
Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
Proposal Submitted in Past
S.no
Proposal Status.
Proposal No.
Moef File No.
Area Proposed for Diversion(Ha.)
Area Diverted(Ha.)
Date of In-Principle Approval
Date of Final Approval
1
Approved
FP/OR/MIN/6200/2010
F.No.8-15/2000-FC(Vol.)
279.351
279.351
08 Jan 2015
25 Feb 2016
2
Approved
FP/OR/MIN/9441/2015
F. NO. 8-46/2016-FC
434.935
434.935
17 Apr 2017
25 Sep 2017
3
Approved
FP/OR/MIN/22/2014
NO.5-ORB246/2015-BHU
1.31
1.31
14 Sep 2015
06 Feb 2017
4
Inprinciple
FP/OR.MIN/8471/2014
F. NO. 8-22/2016-FC
162.42
162.42
14 Sep 2017
5
Approved
FP/OR/MIN/1372/2006
8-105/2006-FC
117.9648
41.2442
17 Feb 2009
24 Apr 2017
6
Inprinciple
FP/OR/MIN/888/2010
8-54/2010-FC
79.3
79.3
27 Sep 2017
7
Inprinciple
FP/OR/TRANS/20324/2011
5-ORC281/2016-BHU
24.9612
24.9612
19 Dec 2016
8
Inprinciple
FP/OR/MIN/10335/2015
8-27/2017-FC
106.016
106.016
27 Sep 2017
9
Inprinciple
FP/OR/MIN/19/2014
8-18/2015-FC
9.696
9.696
17 Sep 2015
10
Inprinciple
FP/OR/MIN/20/2014
8-16/2015-FC
14.642
14.642
17 Sep 2015
11
Inprinciple
FP/OR/MIN/15/2014
8-29/2017-FC
9.819
9.819
06 Sep 2017
12
Inprinciple
FP/OR/MIN/8707/2014
F.No. 8-46/2018-FC
345.189
345.189
31 Jan 2019
13
Approved
FP/OR/MIN/8570/2010
F.No.8-81/2005-FC (Vol.)
1177.211
1177.211
14 Sep 2017
09 Oct 2018
14
Inprinciple
FP/OR/MIN/21011/2016
F.No.8-21/2018-FC
68
68
16 Nov 2018
15
Approved
FP/OR/MRL/2/2017
5-ORB331/2017-BHU
1.502
1.502
24 Sep 2018
16 Oct 2018
16
Inprinciple
FP/OR/MRL/3/2017
8-50/2018-FC
5.782
4.782
14 Sep 2018
17
Inprinciple
FP/OR/MRL/4/2017
8-51/2018-FC
7.54
7.54
14 Sep 2018
18
Inprinciple
FP/OR/MRL/16/2014
8-43/201/-FC
7.94
7.94
16 Aug 2018
19
Inprinciple
FP/OR/MRL/18/2014
8-45/2018-FC
3.606
3.606
19 Dec 2017
20
Inprinciple
FP/OR/MRL/17/2014
8-41/2018-FC
6.699
6.699
16 Aug 2018
21
Inprinciple
FP/OR/MRL/6/2015
8-41/2018-FC
5.597
5.597
07 Aug 2018
22
Inprinciple
FP/OR/MRL/27/2014
8-49/2017-FC
4.62
4.62
05 Feb 2019
23
Approved
FP/OR/MRL/14/2014
8-17/2015-FC
6.5495
6.5495
21 Sep 2015
13 Dec 2018
24
Inprinciple
FP/OR/Others/14546/2015
5-ORC322/2017-BHU
11.912
11.912
28 Nov 2018
25
Approved
FP/OR/MIN/8308/2014
8-113/2000-FC(Vol.II)
517.888
517.888
25 Feb 2016
29 Nov 2018
Total
3410.4505
3332.7299
B-2.
Details of forest land proposed to be diverted
B-2.1
Details of Divisions involved
Details of Divisions involved
S.no
Division Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Keonjhar
401.7824
46.6379
Total
401.7824
46.6379
B-2.2
Details of Districts involved
District wise breakup
S.no
District Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Keonjhar
401.7824
46.6379
Total
401.7824
46.6379
B-2.3
Village wise breakup
Villages wise breakup
S.no
Village
Forest Land(ha.)
Non-Forest Land(ha.)
1
Gandhamardan PRF
278.0247
0
2
Daonra
114.0277
29.5108
3
Suakati
9.53
17.1271
Total
401.5824
46.6379
B-2.4
Component wise breakup
Component wise breakup
S.no
Component
Forest Land(ha.)
Non-Forest Land(ha.)
1
Mining
338.1681
16.1868
2
Dumping of overburden
7.4716
0
3
Stacking of ore
4.7877
10.3543
4
Sub-grade ore stacking
11.1385
2.464
5
Processing & Stacking
28.9267
3.4835
6
Prohibited and protected sz area
7.2807
14.1493
7
Safety zone area for magazine
4.0091
0
Total
401.7824
46.6379
C.
Maps of forest land proposed to be diverted
Division 1. : Keonjhar
(i). Area of forest land proposed to be diverted(in ha.) :
401.7824
(ii). Nature of the Project:
Non Linear
(a). No. of patches :
One
Patch wise details
Patch No.
Area of Patch(in ha.)
Kml File of Patches
To view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.
401.7824
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D.
Justification for locating the Project in forest land and details of alternatives examined:
(i). Copy of note containing justification for locating the Project in forest land:
E.
Employment likely to be generated
(i). Whether the Project is likely to generate employment ?:
Yes
(ii). Permanent/Regular Employment(Number of persons):
377
(iii). Temporary Employment(Number of person-days):
2000
F.
Displacement of People due to the Project, if any
(i). Whether Project involves displacement?:
No
G.
Details of Cost-Benefit analysis for the Project
(i). Whether the Project requires Cost-Benefit analysis?:
Yes
(a). Copy of Cost-Benefit analysis:
H.
Status of Environmental Clearance
(i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? :
Yes
(a). Status of the Environmental Clearance to the Project:
EC obtained
(b). Environmental Clearance File No.:
J-11015/1088/2007-IA.II(M)
(c). Copy of Environmental Clearance to the Project:
(d). Date of grant of Environmental Clearance to the Project:
16 Jan 2009
I.
Status of Wildelife Clearance
(i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? :
No
J.
Applicability of special provisions governing Scheduled Areas
(i).Whether the Project or a part thereof is located in a Scheduled Area? :
No
K.
Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
(i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? :
Yes
(a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L.
Details of land identified for Compensatory Afforestation
(i). Whether non-forest or Revenue forest land is required to be provided by User Agency?:
Yes
(ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?:
Yes
(a). Provide reasons thereof:
519.7472ha (total forest land in ML)-64.7242ha(bro
(b). Area of non-forest or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation(in ha.):
329.7743
(iii). No. of districts involved for raising Compensatory Afforestation:
1
(iv). No. of patches:
One
District 1. : Kalahandi
(a). Village:
Khamarpadar
(b). Area(in ha.):
329.7743
(c). Copy of KML file of the patch:
View File
(d). Khasra details:
Khata No. 246, Abada Ajogya Anabadi, details in ownership document
(e). Present owner:
Others
(f). Copy of ownership proof:
(g). Copy of Mou/agreement executed between the Present owner and the User Agency:
(h). Copy of non encumberence certificate for the forest land:
(v). Scanned copy of the map of the land identified for creation of Compensatory Afforestation prepared by using GPS ot Total Station:
(vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land identified for creation of Compensatory Afforestation:
M.
Mining Details
M-1.
Details of Mineral Concessions
(i). Whether the forest land is aquired under Coal Bearing Areas Act:
No
(a). Reference number of Letter of Intent for grant of mining lease.(approval letter of the State Mines and Geology Department):
2338(2) MG
(b). Date of issue of the Letter of Intent(LOI) for grant of mining lease:
01 Mar 1963
(c). Copy the Letter of Intent(LOI):
(d). Total area of the mining lease(in ha.):
618.576
(e). Area of forest land located in the mining lease(in ha.):
519.7472
M-2.
Details of Mining Plan
(i). Date of approval of mining plan:
14 Aug 2013
(ii). Approval authority:
IBM
(iii). Copy of approval of mining plan:
(iv). Copy of approved mining plan:
(v). Nature of mining (underground/opencast):
Opencast
(vi). Copy of the detailed land use plan in 1:4,000 scale prepared by using GPS or Total Station :
(vii). Copy of map of the outer boundary of mining lease area:
View file
M-3.
Details of prospecting undertaken to assess mineral reserves
(i). Whether detailed prospecting to assess mineral reserve in the lease has been undertaken:
No
M-4.
Details of extension (if any) of original prospecting licence issued in the past
(i). Whether detailed prospecting to assess mineral reserve in the lease has been undertaken:
No
M-5.
Brief details of prospecting activities undertaken in the mining lease :
(i). Detail of prospecting activity under taken in the mining lease:
Detail of prospecting activity under taken in the mining lease is mentioned in Page No. 18,19 & 20 of the approved mining plan enclosed at Sl. no. M-2
M-5.1
Details of bore holes drilled for prospecting :
Bore holes drilled for prospecting
S.no
No. of Bore holes (in forest land)
Diameters(in inch.) forest land
No. of Bore holes (in non-forest land)
Diameters(in inch.) non-forest land
1
39
4
0
0
M-5.2
Estimated Reserve along with accuracy and confidence level
Estimated Reserve along with accuracy and confidence level
Minerals
Estimated Reserve
(million tones)
% accuracy (+ -)
% confidence level
Estimated Reserve
(million tones)
% accuracy (+ -)
% confidence level
Iron Ore
37.42
10
95
2.36
10
95
M-6.
Details of approval under the Forest (Consevation) Act,1980 obtained for undertaking prospecting activities in the forest land located in the mining lease
(i).Whether approval under the Forest (Conservation) Act, 1980 for undertaking prospecting activities in the forest land located in the mining lease have been obtained
No
Details of approval under the Forest(Consevation) Act,1980
S.no
MoEF File No
Date of approval
Area of forest land diverted(in ha.)
From Date
To Date
NIL
M-7.
Mineral wise details
(i). No. of minerals:
One
Mineral wise details
Minerals
Estimated reserve in
non forest land(million tons.)
Estimated reserve
in forest land(million tons.)
Estimated annual
extraction(million tons.)
Estimated life
of mine(Yrs.)
Total estimated extraction during
mining lease period(million tons.)
Estimated mineral reserve
at the end of mining lease(million tons.)
Iron Ore
2.36
37.42
0.35
114
1.75
38.02
M-7.1
Proposed use of the minerals proposed to be raised from the mining lease
(i). Proposed use of the minerals proposed to be raised from the mining lease:
Non captive
(ii).Copy note containing details of the plan for the transportation of the minerals proposed to be raised from the mining lease:
Additional information Details
Documents
S.No
Documents
Remarks
1
Order dt. 06.02.2015 by Ministry of Mines, Govt. of India for extension of mining lease till 31.03.2020 for Government Companies and Corporation.
2
Patch wise DGPS reading of forest land involved in the proposal over 401.7824 ha of Gandhamardan Block A.
Print