FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/OR/IRRIG/27702/2017   (ii). Name of Project for which Forest Land is required : PROPOSAL FOR DIVERSION OF 113.075 ha OF FOREST LAND FOR KARAPANI IRRIGATION PROJECT   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Construction of Dam across Karapani river at village Barghat & Dhanijam in Lahunipada block of sundargarh district under Brahmani Basin of Odisha.   (iv). State : Orissa   (v). Category of the Proposal : Irrigation   (vi). Shape of forest land proposed to be diverted : Hybrid   (vii). Estimated cost of the Project(Rupees in lacs) : 14515   (viii). Area of forest land proposed for diversion(in ha.): 113.075   (ix). Non-forest land required for this project(in ha.): 366.859   (x). Total period for which the forest land is proposed to be diverted(in years): 99
A-2. Details of User Agency
  (i). Name : EXECUTIVE ENGINEER IB INVESTIGATION DIVISION   (ii). Address1 : EXECUTIVE ENGINEER   (iii). Address2 : IB INVESTIGATION DIVISION   (iv). State : Orissa   (v). District : Sundargarh   (vi). Pin : 770020   (vii). Landmark : Near Sankarsana Park   (viii). Email address : fdpkarapani@gmail.com   (ix). Landline Telephone No. : 6622-235720   (x). Fax No. : 6622-   (xi). Mobile No. : 943737591   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: Soumendra   (ii). Middle Name: Kumar   (iii). Last Name: Pradhan   (iv). Gender: Male   (v). Designation: EXECUTIVEENGINEER   (vi). Address 1: EXECUTIVE ENGINEER   (vii). Address 2: IB INVESTIGATION DIVISION   (viii). State: Orissa   (ix). District: Sundargarh   (x). Tehsil: Sundargarh Town   (xi). Pin: 770020   (xii). Landmark: Near sankarasana Park   (xiii). Email Address: fdpkarapani@gmail.com   (xiv). Landline Telephone No.: 6622-235720   (xv). Fax No.: NIL   (xvi). Mobile No.: 9437137591   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
Proposal Submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
1InprincipleFP/OR/IRRIG/13364/20155-ORC303/2016-BHU14.5314.5324 Jul 2017
Total 14.53 14.53
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Bonai113.075366.859
Total113.075366.859
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Sundargarh113.075366.859
Total113.075366.859
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Angul14.50444.553
2Sulabhadihi27.867116.293
3Barghat5.75110.737
4Dhanijam11.8766.519
5Haldikudar1.6962.246
6Jadibahal0.2756.625
7Kantakudar5.7792.934
8Ranja18.60488.859
9Sadhubahal2.9022.529
10Khajurinali02.233
11Mahuldihi4.50810.603
12Sialikudar0.2715.953
13Sihidiha2.6146.775
14Lunga RF3.6260
15Kundeibera RF4.3340
16Nagaria PRF8.4740
Total 113.075 366.859
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Left Canal19.05629.807
2Right Canal2.66412.324
3Dam Axis3.919.2
4Pondage87.445315.528
Total 113.075 366.859
C. Maps of forest land proposed to be diverted
Division 1. : Bonai
  (i). Area of forest land proposed to be diverted(in ha.) : 113.075   (ii). Nature of the Project: Hybrid   (a). No. of patches : One
Patch wise details
Patch No. Area of Patch(in ha.) Kml File of PatchesTo view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.113.075    View File
  (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.0    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 50   (iii). Temporary Employment(Number of person-days): 30000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: Yes   (a). Total Number of families : 148   (b). Number of Scheduled Caste families : 21   (c). Number of Schedule Tribes families : 127   (d). Number of other families : NIL   (ii). Copy of Rehabilitation and Resettlement Plan:   (a). Copy of approval to Ministry of Tribal Affairs,Government of India to Rehabilitation and Resettlement:
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: Yes   (a). Copy of Cost-Benefit analysis:
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : Yes   (a). Status of the Environmental Clearance to the Project: EC application yet to be submitted
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : No
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Yes   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Yes   (a). Reason Category: CA Will be raised on degraded forest land as well as on land provided by User Agency   (b). Degraded forest area on which CA has to be raised by forest department(in ha.): 143.923   (c). Area of non-forest or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation(in ha.): 115.014   (iii). No. of districts involved for raising Compensatory Afforestation: 1   (iv). No. of patches: One
District 1. : Sundargarh
  (a). Village: Dumangadiri   (b). Area(in ha.): 91.898   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 72   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
District 2. : Sundargarh
  (a). Village: Karmabahal   (b). Area(in ha.): 23.116   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 88   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
District 3. : Sundargarh
  (a). Village: Harapalli RF   (b). Area(in ha.): 143.923   (c). Copy of KML file of the patch:     View File   (d). Khasra details: Harapalli RF   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
  (v). Scanned copy of the map of the land identified for creation of Compensatory Afforestation prepared by using GPS ot Total Station:   (vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land identified for creation of Compensatory Afforestation:
M. Hydel/Irrigation/Multipurpose Project
  (i). Installed power generation capacity of the Project(in MW): 0   (ii). Total command area of the Project(in ha.): 3500   (a). Copy of the approval of competent authority to the Catchment Area Treatment Plan (CAT Plan):   (b). Copy of the approved CAT plan:
Additional information Details
Documents
S.No Documents
Remarks
1Detail note of the project
2Compliance of EDS
3CA Scheme
4CA land (Non-forest and degraded area) index map
5Letter and undertakings as per MoEF EDS