FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/OR/IRRIG/13379/2015   (ii). Name of Project for which Forest Land is required : Turi-Guntat Irrigation Project   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Turi-Guntat Irrigation Project is an integrated diversion scheme. It envisages to construct two barrages one each across River Turi near Chatahandi village and River Guntat at Deula Village and will irrigate 9135 ha   (iv). State : Orissa   (v). Category of the Proposal : Irrigation   (vi). Shape of forest land proposed to be diverted : Hybrid   (vii). Estimated cost of the Project(Rupees in lacs) : 11787.5   (viii). Area of forest land proposed for diversion(in ha.): 51.783   (ix). Non-forest land required for this project(in ha.): 957.19   (x). Total period for which the forest land is proposed to be diverted(in years): 99
A-2. Details of User Agency
  (i). Name : KORAPUT INVESTIGATION DIVISION, JEYPORE   (ii). Address1 : Koraput Investigation Division, Jeypore, Koraput   (iii). Address2 : NIL   (iv). State : Orissa   (v). District : Koraput   (vi). Pin : 764004   (vii). Landmark : NIL   (viii). Email address : fdpturiguntat1@gmail.com   (ix). Landline Telephone No. : 6854-257102   (x). Fax No. : 6854-   (xi). Mobile No. : 8596935438   (xii). Website (if any) : www.dowrorissa.gov.in   (xiii). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: Rabindra   (ii). Middle Name: Kumar   (iii). Last Name: Mohapatra   (iv). Gender: Male   (v). Designation: Executive Engineer   (vi). Address 1: Koraput Investigation Division,Jeypore, Koraput   (vii). Address 2: NIL   (viii). State: Orissa   (ix). District: Koraput   (x). Tehsil: Jeypore   (xi). Pin: 764004   (xii). Landmark: NIL   (xiii). Email Address: fdpturiguntat1@gmail.com   (xiv). Landline Telephone No.: 6854-257102   (xv). Fax No.: NIL   (xvi). Mobile No.: 8596935438   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Nowrangpur51.783957.19
Total51.783957.19
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Nabarangpur51.783957.19
Total51.783957.19
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Simila0.07116.734
2Kokadi07.499
3Asanga0.16117.316
4Chuarahandi1.2336.361
5Chirma2.3612.933
6Sankarda08.94
7Mundagada1.83110.344
8Baragaon07.572
9Bhatigaon014.5
10Badamasigaon7.31810.111
11Bhurbasi0.61612.077
12Betal032.177
13Mantriguda011.298
14Dharanabeda07.135
15Taragaon09.397
16Chikili0.91312.753
17Gumaguda0.6034.373
18Pilika015.52
19Dangriguda0.246132.059
20Pakhanguda012.348
21Teliguda0.19530.003
22Bikrampur9.29756.013
23Sindhigaon010.64
24Manjor07.01
25Pujariguda0.01327.73
26Bhatra013.021
27Deola051.343
28Agnipur013.581
29Bangapali08.074
30Hirli07.908
31Deodaspali02.699
32Kusumi2.7798.952
33Siuni0.63713.692
34Chirmapandi0.0863.181
35Sanamasigaon06.078
36Daspur03.575
37Mohulpadar09.686
38Dengaguda00.721
39Saranpur0.93531.497
40Hatibeda03.412
41Karki054.257
42Mokia037.98
43Sirisi06.042
44Chatahandi22.322106.47
Total 51.616 875.012
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Canal20.774342.535
2Pondage & Head work31.009614.655
Total 51.783 957.19
C. Maps of forest land proposed to be diverted
Division 1. : Nowrangpur
  (i). Area of forest land proposed to be diverted(in ha.) : 51.783   (ii). Nature of the Project: Hybrid   (a). No. of patches : One
Patch wise details
Patch No. Area of Patch(in ha.) Kml File of PatchesTo view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.31.009    View File
  (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.20.774    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 30   (iii). Temporary Employment(Number of person-days): 400000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: Yes   (a). Copy of Cost-Benefit analysis:
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : Yes   (a). Status of the Environmental Clearance to the Project: EC obtained   (b). Environmental Clearance File No.: 2006   (c). Copy of Environmental Clearance to the Project:   (d). Date of grant of Environmental Clearance to the Project: 24 Apr 2013
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Yes   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii). No. of districts involved for raising Compensatory Afforestation: 1   (iv). No. of patches: Two
District 1. : Nabarangpur
  (a). Village: Nuagaon   (b). Area(in ha.): 20.785   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 1577   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
District 2. : Nabarangpur
  (a). Village: Bamani   (b). Area(in ha.): 30.316   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 107 & 914   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
  (v). Scanned copy of the map of the land identified for creation of Compensatory Afforestation prepared by using GPS ot Total Station:   (vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land identified for creation of Compensatory Afforestation:
M. Hydel/Irrigation/Multipurpose Project
  (i). Installed power generation capacity of the Project(in MW): 0   (ii). Total command area of the Project(in ha.): 9135   (a). Copy of the approval of competent authority to the Catchment Area Treatment Plan (CAT Plan):   (b). Copy of the approved CAT plan:
Additional information Details
Documents
S.No Documents
Remarks
1ORSAC DGPS Survey certificate and clarification regarding mismatch of area to be diverted and KML area