FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/OR/IND/36705/2018   (ii). Name of Project for which Forest Land is required : Iron Ore Grinding, De-Sliming (Beneficiation) Plant & Slurry Pumping Station and Water Intake System of M/s JSW Utkal Steel Ltd., Barbil Tahasil, Keonjhar District   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : M/s JSW Utkal Steel Ltd. ["JSW USL"] is intend to setup a new Iron Ore Grinding, De-Sliming (Beneficiation) Plant, Slurry Pumping Station and Water Intake System under Barbil Tahasil & District Keonjhar, Odisha State along with associate facilities to produce 30 MTPA iron ore concentrate for transp   (iv). State : Orissa   (v). Category of the Proposal : Industry   (vi). Shape of forest land proposed to be diverted : Non Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 299000   (viii). Area of forest land proposed for diversion(in ha.): 22.671   (ix). Non-forest land required for this project(in ha.): 57.834   (x). Total period for which the forest land is proposed to be diverted(in years): 99
A-2. Details of User Agency
  (i). Name : JSW UTKAL STEEL LIMITED   (ii). Address1 : JSW Utkal Steel Limited Plot No. 3, Forest Park, Bhubaneshwar, Odisha   (iii). Address2 : NIL   (iv). State : Orissa   (v). District : Khordha   (vi). Pin : 751009   (vii). Landmark : NIL   (viii). Email address : mm@jsw.in   (ix). Landline Telephone No. : 674-2596117   (x). Fax No. : 674-   (xi). Mobile No. : 9861094290   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : Private
A-3. Details of Person Making Application
  (i). First Name: Shankarpratap   (ii). Middle Name: NIL   (iii). Last Name: Singh   (iv). Gender: Male   (v). Designation: Director   (vi). Address 1: JSW Utkal Steel Limited, Plot No. 3, Forest Park, Bhubaneshwar   (vii). Address 2: NIL   (viii). State: Orissa   (ix). District: Khordha   (x). Tehsil: Saheednagar   (xi). Pin: 751009   (xii). Landmark: NIL   (xiii). Email Address: anilkumar.singh@jsw.in   (xiv). Landline Telephone No.: 674-2596117   (xv). Fax No.: NIL   (xvi). Mobile No.: 7077758074   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Keonjhar22.67157.834
Total22.67157.834
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Keonjhar22.67157.834
Total22.67157.834
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Gobardhanpur2.16812.904
2bhagalpur3.83438.244
3Lahanda15.6280
4Sialijoda05.399
5Kandra1.0411.287
Total 22.671 57.834
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Admin Building, Store with yard, Ambulance Room, F0.2250.861
2Grinding with Desliming Unit, Grinding Unit, Conce1.5810.6
3Ore Stock pile area, Stacker Reclaimers, Conveyors1.45818.917
4Emergency Dump pond Roads & Drains.00.64
5MRSS, LBDS, DG ,Electricals Installations, Car par0.52.32
6Intake Well,Intake Chamber,Flash Mixture, Clariflo0.0220.133
7Sub Station & DG, Control Room with Office0.0590.56
8Operator Room,Security room & Maintenance Room0.280
9Pump house & Delivery Pipe System0.0760.068
10Truck Unloading Area, Weigh Bridges, Ground Hopper10.2450
11Water Resorvior, Roads & Drains.0.0954.24
12Work shop & Assembly points,LBDS00.78
13Security office & Security barrack0.020.126
14Roads & Drains0.0690.064
15Green belt areas (33%)8.04218.525
Total 22.671 57.834
C. Maps of forest land proposed to be diverted
Division 1. : Keonjhar
  (i). Area of forest land proposed to be diverted(in ha.) : 22.671   (ii). Nature of the Project: Non Linear   (a). No. of patches : Four
Patch wise details
Patch No. Area of Patch(in ha.) Kml File of PatchesTo view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.0.125    View File
2.1.041    View File
3.5.868    View File
4.15.617    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 200   (iii). Temporary Employment(Number of person-days): 300
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: Yes   (a). Copy of Cost-Benefit analysis:
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : Yes   (a). Status of the Environmental Clearance to the Project: EC under process   (ii). Environmental Clearance File No.: IA-J-11011/271/2018-IA-II(I)
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : No
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Yes   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii). No. of districts involved for raising Compensatory Afforestation: 1   (iv). No. of patches: Two
District 1. : Keonjhar
  (a). Village: Podadihi (Plot No-329 (P))   (b). Area(in ha.): 11   (c). Copy of KML file of the patch:     View File   (d). Khasra details: Parbat-I   (e). Present owner: User Agency   (f). Copy of Ownership proof:
District 2. : Keonjhar
  (a). Village: Podadihi (Plot No-519 (P))   (b). Area(in ha.): 11.8   (c). Copy of KML file of the patch:     View File   (d). Khasra details: Parbat-I   (e). Present owner: User Agency   (f). Copy of Ownership proof:
  (v). Scanned copy of the map of the land identified for creation of Compensatory Afforestation prepared by using GPS ot Total Station:   (vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land identified for creation of Compensatory Afforestation:
Additional information Details
Documents
S.No Documents
Remarks
1Submission of FDP & Compliance of EDS in 6 sets
2CA Land_Revised Allotment Order from Collector
3CA Land Joint Inspection Report
4CA Land Topo map
5CA Land_Note
6SOI Topo sheet authenticated by FRO & TDR
7DGPS Maps authenticated by FRO & TDR
8EDS has been complied vide letter No. 108 dated 29.05.2019.
9EDS reply on dated 20.06.2019
10Querry Reply dated 16.7.2019 of DFO, Keonjhar