FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A.
General Details
A-1.
Project Details
(i). Proposal No. :
FP/OR/IND/36705/2018
(ii). Name of Project for which Forest Land is required :
Iron Ore Grinding, De-Sliming (Beneficiation) Plant & Slurry Pumping Station and Water Intake System of M/s JSW Utkal Steel Ltd., Barbil Tahasil, Keonjhar District
(iii). Short narrative of the proposal and Project/scheme for which the forest land is required :
M/s JSW Utkal Steel Ltd. ["JSW USL"] is intend to setup a new Iron Ore Grinding, De-Sliming (Beneficiation) Plant, Slurry Pumping Station and Water Intake System under Barbil Tahasil & District Keonjhar, Odisha State along with associate facilities to produce 30 MTPA iron ore concentrate for transp
(iv). State :
Orissa
(v). Category of the Proposal :
Industry
(vi). Shape of forest land proposed to be diverted :
Non Linear
(vii). Estimated cost of the Project(Rupees in lacs) :
299000
(viii). Area of forest land proposed for diversion(in ha.):
22.671
(ix). Non-forest land required for this project(in ha.):
57.834
(x). Total period for which the forest land is proposed to be diverted(in years):
99
A-2.
Details of User Agency
(i). Name :
JSW UTKAL STEEL LIMITED
(ii). Address1 :
JSW Utkal Steel Limited Plot No. 3, Forest Park, Bhubaneshwar, Odisha
(iii). Address2 :
NIL
(iv). State :
Orissa
(v). District :
Khordha
(vi). Pin :
751009
(vii). Landmark :
NIL
(viii). Email address :
mm@jsw.in
(ix). Landline Telephone No. :
674-2596117
(x). Fax No. :
674-
(xi). Mobile No. :
9861094290
(xii). Website (if any) :
NIL
(xiii). Legal status of User Agency :
Private
A-3.
Details of Person Making Application
(i). First Name:
Shankarpratap
(ii). Middle Name:
NIL
(iii). Last Name:
Singh
(iv). Gender:
Male
(v). Designation:
Director
(vi). Address 1:
JSW Utkal Steel Limited, Plot No. 3, Forest Park, Bhubaneshwar
(vii). Address 2:
NIL
(viii). State:
Orissa
(ix). District:
Khordha
(x). Tehsil:
Saheednagar
(xi). Pin:
751009
(xii). Landmark:
NIL
(xiii). Email Address:
anilkumar.singh@jsw.in
(xiv). Landline Telephone No.:
674-2596117
(xv). Fax No.:
NIL
(xvi). Mobile No.:
7077758074
(xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B.
Details of land required for the Project
B-1.
Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no
Proposal Status.
Proposal No.
Moef File No.
Area Proposed for Diversion(Ha.)
Area Diverted(Ha.)
Date of In-Principle Approval
Date of Final Approval
NIL
B-2.
Details of forest land proposed to be diverted
B-2.1
Details of Divisions involved
Details of Divisions involved
S.no
Division Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Keonjhar
22.671
57.834
Total
22.671
57.834
B-2.2
Details of Districts involved
District wise breakup
S.no
District Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Keonjhar
22.671
57.834
Total
22.671
57.834
B-2.3
Village wise breakup
Villages wise breakup
S.no
Village
Forest Land(ha.)
Non-Forest Land(ha.)
1
Gobardhanpur
2.168
12.904
2
bhagalpur
3.834
38.244
3
Lahanda
15.628
0
4
Sialijoda
0
5.399
5
Kandra
1.041
1.287
Total
22.671
57.834
B-2.4
Component wise breakup
Component wise breakup
S.no
Component
Forest Land(ha.)
Non-Forest Land(ha.)
1
Admin Building, Store with yard, Ambulance Room, F
0.225
0.861
2
Grinding with Desliming Unit, Grinding Unit, Conce
1.58
10.6
3
Ore Stock pile area, Stacker Reclaimers, Conveyors
1.458
18.917
4
Emergency Dump pond Roads & Drains.
0
0.64
5
MRSS, LBDS, DG ,Electricals Installations, Car par
0.5
2.32
6
Intake Well,Intake Chamber,Flash Mixture, Clariflo
0.022
0.133
7
Sub Station & DG, Control Room with Office
0.059
0.56
8
Operator Room,Security room & Maintenance Room
0.28
0
9
Pump house & Delivery Pipe System
0.076
0.068
10
Truck Unloading Area, Weigh Bridges, Ground Hopper
10.245
0
11
Water Resorvior, Roads & Drains.
0.095
4.24
12
Work shop & Assembly points,LBDS
0
0.78
13
Security office & Security barrack
0.02
0.126
14
Roads & Drains
0.069
0.064
15
Green belt areas (33%)
8.042
18.525
Total
22.671
57.834
C.
Maps of forest land proposed to be diverted
Division 1. : Keonjhar
(i). Area of forest land proposed to be diverted(in ha.) :
22.671
(ii). Nature of the Project:
Non Linear
(a). No. of patches :
Four
Patch wise details
Patch No.
Area of Patch(in ha.)
Kml File of Patches
To view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.
0.125
View File
2.
1.041
View File
3.
5.868
View File
4.
15.617
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D.
Justification for locating the Project in forest land and details of alternatives examined:
(i). Copy of note containing justification for locating the Project in forest land:
E.
Employment likely to be generated
(i). Whether the Project is likely to generate employment ?:
Yes
(ii). Permanent/Regular Employment(Number of persons):
200
(iii). Temporary Employment(Number of person-days):
300
F.
Displacement of People due to the Project, if any
(i). Whether Project involves displacement?:
No
G.
Details of Cost-Benefit analysis for the Project
(i). Whether the Project requires Cost-Benefit analysis?:
Yes
(a). Copy of Cost-Benefit analysis:
H.
Status of Environmental Clearance
(i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? :
Yes
(a). Status of the Environmental Clearance to the Project:
EC under process
(ii). Environmental Clearance File No.:
IA-J-11011/271/2018-IA-II(I)
I.
Status of Wildelife Clearance
(i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? :
No
J.
Applicability of special provisions governing Scheduled Areas
(i).Whether the Project or a part thereof is located in a Scheduled Area? :
No
K.
Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
(i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? :
No
L.
Details of land identified for Compensatory Afforestation
(i). Whether non-forest or Revenue forest land is required to be provided by User Agency?:
Yes
(ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?:
No
(iii). No. of districts involved for raising Compensatory Afforestation:
1
(iv). No. of patches:
Two
District 1. : Keonjhar
(a). Village:
Podadihi (Plot No-329 (P))
(b). Area(in ha.):
11
(c). Copy of KML file of the patch:
View File
(d). Khasra details:
Parbat-I
(e). Present owner:
User Agency
(f). Copy of Ownership proof:
District 2. : Keonjhar
(a). Village:
Podadihi (Plot No-519 (P))
(b). Area(in ha.):
11.8
(c). Copy of KML file of the patch:
View File
(d). Khasra details:
Parbat-I
(e). Present owner:
User Agency
(f). Copy of Ownership proof:
(v). Scanned copy of the map of the land identified for creation of Compensatory Afforestation prepared by using GPS ot Total Station:
(vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land identified for creation of Compensatory Afforestation:
Additional information Details
Documents
S.No
Documents
Remarks
1
Submission of FDP & Compliance of EDS in 6 sets
2
CA Land_Revised Allotment Order from Collector
3
CA Land Joint Inspection Report
4
CA Land Topo map
5
CA Land_Note
6
SOI Topo sheet authenticated by FRO & TDR
7
DGPS Maps authenticated by FRO & TDR
8
EDS has been complied vide letter No. 108 dated 29.05.2019.
9
EDS reply on dated 20.06.2019
10
Querry Reply dated 16.7.2019 of DFO, Keonjhar
Print