FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/OR/IND/12884/2015   (ii). Name of Project for which Forest Land is required : NTPC LTD., DARLIPALI SUPER THERMAL POWER PROJECT   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Forest Diversion Proposal for Make-Up-Water Pipeline and 132KV Transmission Lines Corridor   (iv). State : Orissa   (v). Category of the Proposal : Industry   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 15000   (viii). Area of forest land proposed for diversion(in ha.): 25.76   (ix). Non-forest land required for this project(in ha.): 169.83   (x). Total period for which the forest land is proposed to be diverted(in years): NIL
A-2. Details of User Agency
  (i). Name : NTPC LTD DARLIPALI SUPER THERMAL POWER PROJECT   (ii). Address1 : DARLIPALI SUPER THERMAL POWER PROJECT, AT/P.O.- DARLIPALI, VIA- SARGIPALI,ZINC NAGAR   (iii). Address2 : 3rd Floor,AMBA TOWER,Hospital Road,Sundargarh-770001   (iv). State : Orissa   (v). District : Sundargarh   (vi). Pin : 770072   (vii). Landmark : NIL   (viii). Email address : pramodurja@yahoo.com   (ix). Landline Telephone No. : 6622-272472   (x). Fax No. : NIL   (xi). Mobile No. : 9717677899   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : Central PSU
A-3. Details of Person Making Application
  (i). First Name: Pratibha Singh   (ii). Middle Name: NIL   (iii). Last Name: NIL   (iv). Gender: Male   (v). Designation: GROUP GENERAL MANAGER   (vi). Address 1: DARLIPALI SUPER THERMAL POWER PROJECT, AT/P.O.- DARLIPALI, VIA- SARGIPALI,ZINC NAGAR   (vii). Address 2: 3rd Floor,AMBA TOWER,Hospital Road,Sundargarh-770001   (viii). State: Orissa   (ix). District: Sundargarh   (x). Tehsil: NIL   (xi). Pin: 770072   (xii). Landmark: NIL   (xiii). Email Address: hrdarlipali@gmail.com   (xiv). Landline Telephone No.: 6622-272472   (xv). Fax No.: 06622272473   (xvi). Mobile No.: 9650990102   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Sundargarh2.813.72
2.Jharsuguda22.96156.11
Total25.76169.83
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Sundargarh2.813.72
1.Jharsuguda22.96156.11
Total25.76169.83
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Darlipali0.154.42
2Kanaktora2.659.3
3Chichinda04.95
4Kechhobahal1.588.43
5Chandlimal2.847.94
6Rajpur0.769.01
7Goudmal0.482.71
8Katapali04.74
9Degaon01.51
10Brajrajnagar Unit-2024.32
11Brajrajnagar Unit-16.675.74
12Bundia6.624.92
13Ailapali01.38
14Balput0.646.47
15Kirarama2.114.45
16Sarandamal011.36
17Dalagaon03.5
18Negipali05.83
19Telenpali09.6
20Banharpali1.267.04
Total 25.76 137.62
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Make-Up-Water Pipeline and 132KV Transmission Line25.76169.83
Total 25.76 169.83
C. Maps of forest land proposed to be diverted
Division 1. : Sundargarh
  (i). Area of forest land proposed to be diverted(in ha.) : 2.8   (ii). Nature of the Project: Linear   (b). No. of Segments : Three
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.0.15    View File
2.2.44    View File
3.0.21    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
Division 2. : Jharsuguda
  (i). Area of forest land proposed to be diverted(in ha.) : 22.96   (ii). Nature of the Project: Linear   (b). No. of Segments : Twelve
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.1.58    View File
2.2.84    View File
3.0.76    View File
4.0.48    View File
5.1.29    View File
6.3.31    View File
7.1.41    View File
8.0.66    View File
9.6.62    View File
10.0.64    View File
11.2.11    View File
12.1.26    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: No   (a). Reason for not providing such map: While deciding the route of the pipeline corridor,
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 0   (iii). Temporary Employment(Number of person-days): 400
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: Yes   (a). Copy of Cost-Benefit analysis:
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : Yes
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : No
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Not Applicable   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Not Applicable   (iii) . Reason for not providing Non-Forest Land: Not Applicable
Additional information Details
Documents
S.No Documents
Remarks
1CHECK-LIST OF DOCUMENTS/INFORMATION REQUIRED FOR PROPOSAL FOR DIVERSION OF FOREST LAND FOR NON FORESTRY USE UNDER FOREST (CONSERVATION) ACT, 1980
2FORM A (Part-I)
3Certificate for minimum use of Forest Land
4UNDERTAKING FOR PAYMENT OF COST OF NET PRESENT VALUE FOREST AREA
5Detailed Note on the Project
6UNDERTAKING FOR PAYMENT OF COST OF COMPENSATORY AFFORESTATION
7Undertaking to submit the certificate from the District Collector ,Sundargarh, Odisha along with other documents required under “The Schedule tribes and other Traditional Forest Dwellers (Recognition of Forest Rights) Act 2006
8Justification for clubbing RoU of MUW Pipeline Corridor and RoW of 132 kV Transmission line of Darlipali STPP
9Total Land Plan of the Project
10Total Land Schedule of the Project
11Tree Enumeration Report of the Project
12Annexure I, II, III, IV, V, VI, VII, VIII, IX, X, XI
131. kml files of both the division has been uploaded along with area details as per the essential details sought by Forest Department. 2. Toposheet maps of both the division authenticated by User agency were submitted earlier and once again it has been submitted for your kind approval.