FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A.
General Details
A-1.
Project Details
(i). Proposal No. :
FP/MZ/ROAD/41727/2019
(ii). Name of Project for which Forest Land is required :
Widening and upgradation of NH-54 to 2-Lane with paved shoulder and geometric improvements from Km 8.00 to Km 380.00 in the State of Mizoram (JICA Funded), Km 8.0 to Km 125.0 (Package-1)
(iii). Short narrative of the proposal and Project/scheme for which the forest land is required :
The present configuration of road is varying from 3.75m to 5.5 m with earthen shoulder. NH-54 is the lifeline of the State of Mizoram linking its capital Aizawl in northern side at Km 8.00 to Tuipang in southern end at Km 380.00. In this JICA funded project, 372 Km road length is proposed to be wid
(iv). State :
Mizoram
(v). Category of the Proposal :
Road
(vi). Shape of forest land proposed to be diverted :
Linear
(vii). Estimated cost of the Project(Rupees in lacs) :
616759
(viii). Area of forest land proposed for diversion(in ha.):
5.06
(ix). Non-forest land required for this project(in ha.):
224.98
(x). Total period for which the forest land is proposed to be diverted(in years):
99
A-2.
Details of User Agency
(i). Name :
NHIDCL
(ii). Address1 :
NHIDCL OFFICE,EDDIE KHAWLHRING BUILDING, NIKANG VENG, CP ROAD, TLANGNUAM, AIZAWL
(iii). Address2 :
NIL
(iv). State :
Mizoram
(v). District :
Aizawl
(vi). Pin :
796005
(vii). Landmark :
NEAR PLAYGROUND
(viii). Email address :
aizawl.nhidcl@gmail.com
(ix). Landline Telephone No. :
11-23461603
(x). Fax No. :
11-
(xi). Mobile No. :
9414370651
(xii). Website (if any) :
www.nhidcl.com
(xiii). Legal status of User Agency :
Central PSU
A-3.
Details of Person Making Application
(i). First Name:
ASHOK
(ii). Middle Name:
KUMAR
(iii). Last Name:
SHRIVASTAVA
(iv). Gender:
Male
(v). Designation:
GM
(vi). Address 1:
NHIDCL OFFICE, Project Monitoring Unit-Seling, Mizoram, C/o Tourist Lodge Thingsulthliah
(vii). Address 2:
Near Power House on Hospital Road
(viii). State:
Mizoram
(ix). District:
Aizawl
(x). Tehsil:
NIL
(xi). Pin:
796161
(xii). Landmark:
Tourist Lodge Thingsulthliah
(xiii). Email Address:
pmu.seling@nhidcl.com
(xiv). Landline Telephone No.:
389-2950166
(xv). Fax No.:
NIL
(xvi). Mobile No.:
9818941494
(xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B.
Details of land required for the Project
B-1.
Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
Proposal Submitted in Past
S.no
Proposal Status.
Proposal No.
Moef File No.
Area Proposed for Diversion(Ha.)
Area Diverted(Ha.)
Date of In-Principle Approval
Date of Final Approval
1
Approved
FP/MZ/ROAD/23965/2017
No. 3-MZ C 076/2017-SHI/830-831
11.61
0
18 May 2018
20 Aug 2019
Total
11.61
0
B-2.
Details of forest land proposed to be diverted
B-2.1
Details of Divisions involved
Details of Divisions involved
S.no
Division Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Aizawl
3.62
117.47
2.
Thenzawl
1.44
107.51
Total
5.06
224.98
B-2.2
Details of Districts involved
District wise breakup
S.no
District Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Aizawl
3.62
117.47
1.
Serchhip
1.44
107.51
Total
5.06
224.98
B-2.3
Village wise breakup
Villages wise breakup
S.no
Village
Forest Land(ha.)
Non-Forest Land(ha.)
1
Zemabawk
1.36
21.95
2
Thingsulthliah
0.66
16.54
3
Darlawng
0.47
9.81
4
Tlungvel
1.13
14.61
5
Chhiahtlang
1.44
22.61
Total
5.06
85.52
B-2.4
Component wise breakup
Component wise breakup
S.no
Component
Forest Land(ha.)
Non-Forest Land(ha.)
1
Road Ch 10+340 to 11+860
1.36
21.95
2
Road Ch 49+280 to 50+200
0.66
16.54
3
Road Ch 51+560 to 51+830
0.31
5.13
4
Road Ch 52+840 to 53+080
0.16
4.68
5
Road Ch 55+100 to 55+900
0.61
7.46
6
Road Ch 59+320 to 60+080
0.52
7.15
7
Road Ch 87+845 to 88+420
0.31
7.55
8
Road Ch 90+485 to Ch 91+100
0.52
7.88
9
Road Ch 93+760 to 94+330
0.607305
7.18
Total
5.057305
85.52
C.
Maps of forest land proposed to be diverted
Division 1. : Aizawl
(i). Area of forest land proposed to be diverted(in ha.) :
3.62
(ii). Nature of the Project:
Linear
(b). No. of Segments :
Twelve
Segment wise details
Segments
Segment Area(in ha.)
Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.
0.87
View File
2.
0.39
View File
3.
0.1
View File
4.
0.28
View File
5.
0.384
View File
6.
0.3
View File
7.
0.07
View File
8.
0.08
View File
9.
0.08
View File
10.
0.25
View File
11.
0.28
View File
12.
0.52
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
Division 2. : Thenzawl
(i). Area of forest land proposed to be diverted(in ha.) :
1.44
(ii). Nature of the Project:
Linear
(b). No. of Segments :
Four
Segment wise details
Segments
Segment Area(in ha.)
Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.
0.31
View File
2.
0.27
View File
3.
0.25
View File
4.
0.61
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D.
Justification for locating the Project in forest land and details of alternatives examined:
(i). Copy of note containing justification for locating the Project in forest land:
(ii). Whether a copy of map indicating location of alternative examine is required to be provided:
No
(a). Reason for not providing such map:
NIL
E.
Employment likely to be generated
(i). Whether the Project is likely to generate employment ?:
Yes
(ii). Permanent/Regular Employment(Number of persons):
100
(iii). Temporary Employment(Number of person-days):
50000
F.
Displacement of People due to the Project, if any
(i). Whether Project involves displacement?:
No
G.
Details of Cost-Benefit analysis for the Project
(i). Whether the Project requires Cost-Benefit analysis?:
Yes
(a). Copy of Cost-Benefit analysis:
H.
Status of Environmental Clearance
(i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? :
No
I.
Status of Wildelife Clearance
(i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? :
No
J.
Applicability of special provisions governing Scheduled Areas
(i).Whether the Project or a part thereof is located in a Scheduled Area? :
Yes
K.
Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
(i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? :
No
L.
Details of land identified for Compensatory Afforestation
(i). Whether non-forest or Revenue forest land is required to be provided by User Agency?:
Not Applicable
(ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?:
Not Applicable
(iii) . Reason for not providing Non-Forest Land:
Not Applicable
Additional information Details
Documents
S.No
Documents
Remarks
1
Undetaking for Net present value
2
Undertaking for use of Total Station for survey
3
Map of Block-Aizawl District
4
Map of Block-Serchhip District
5
technical report
6
Permission for splitting Package
7
MOM 10/01/2019
8
The Proposal for Deemed Forest Clearance is already submitted in Hard Copy to Principal Chief Conservator of Forest & Nodal Officer for Forest Clearance, Govt. of Mizoram on 27.08.2019.
9
Muck Disposal Plan
10
Submission of EDS in Hardcopy in 3Sets to PCCF, E&F Dept Govt. of Mizoram
11
Diagrammatic Sketch of Road
12
length of Proposed Road & GPS Coordinate
13
Letter to NHIDCL from PCCF & MoEF
14
Submission of Addl. EDS sought by PCCF Mizoram
15
Existing & Proposed Right of Way
16
Signed copy of Muck Disposal Plan approved by UA
17
Undertaking for CA