FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A.
General Details
A-1.
Project Details
(i). Proposal No. :
FP/MP/IRRIG/7403/2014
(ii). Name of Project for which Forest Land is required :
Ken - Betwa Link Project
(iii). Short narrative of the proposal and Project/scheme for which the forest land is required :
The project is proposed to meet the irrigation and drinking water requirement for needy area of Shivpuri and Datia districts. The CCA and Annual Irrigation are 45047ha 65000ha respectively.About 1.65 lakh population will be benefited by the drinking water supply.
(iv). State :
Madhya Pradesh
(v). Category of the Proposal :
Irrigation
(vi). Shape of forest land proposed to be diverted :
Non Linear
(vii). Estimated cost of the Project(Rupees in lacs) :
137083
(viii). Area of forest land proposed for diversion(in ha.):
968.24
(ix). Non-forest land required for this project(in ha.):
1755.46
(x). Total period for which the forest land is proposed to be diverted(in years):
100
A-2.
Details of User Agency
(i). Name :
MINISTRY OF WATER RESOURCES,GOVT. OF INDIA NATIONAL WATER DEVELOPMENT AGENCY NWDA
(ii). Address1 :
A-3. Sahyog Parishar, Trilanga, Bhopal
(iii). Address2 :
Madhya Pradesh
(iv). State :
Madhya Pradesh
(v). District :
Bhopal
(vi). Pin :
462039
(vii). Landmark :
Opposite Sahakari Prashikchhan Kendra
(viii). Email address :
eenwdabpl@rediffmail.com
(ix). Landline Telephone No. :
755-2566818
(x). Fax No. :
755-755
(xi). Mobile No. :
9425393854
(xii). Website (if any) :
www.nwda.gov.in
(xiii). Legal status of User Agency :
Central Government
A-3.
Details of Person Making Application
(i). First Name:
Amar
(ii). Middle Name:
Shri
(iii). Last Name:
Nayak
(iv). Gender:
Male
(v). Designation:
Executive Engineer
(vi). Address 1:
A-3. Sahyog Parishar, Trilanga, Bhopal
(vii). Address 2:
Madhya Pradesh
(viii). State:
Madhya Pradesh
(ix). District:
Bhopal
(x). Tehsil:
Huzur
(xi). Pin:
462039
(xii). Landmark:
Opposite Sahakari Prashikchhan Kendra
(xiii). Email Address:
eenwdabpl@rediffmail.com
(xiv). Landline Telephone No.:
755-2566818
(xv). Fax No.:
07552566818
(xvi). Mobile No.:
9425393854
(xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B.
Details of land required for the Project
B-1.
Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no
Proposal Status.
Proposal No.
Moef File No.
Area Proposed for Diversion(Ha.)
Area Diverted(Ha.)
Date of In-Principle Approval
Date of Final Approval
NIL
B-2.
Details of forest land proposed to be diverted
B-2.1
Details of Divisions involved
Details of Divisions involved
S.no
Division Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Ashok Nagar(T)
694.58
1476.42
2.
Shivpuri(T)
273.66
279.04
Total
968.24
1755.46
B-2.2
Details of Districts involved
District wise breakup
S.no
District Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Ashoknagar
694.58
1476.42
1.
Shivpuri
273.66
279.04
Total
968.24
1755.46
B-2.3
Village wise breakup
Villages wise breakup
S.no
Village
Forest Land(ha.)
Non-Forest Land(ha.)
1
Lidhora
340.972
422.07
2
Pagara
0
327.08
3
Pahadpur
2.08
64.95
4
Kirraya
67.77
139.13
5
Bithala
0
147.08
6
Khyawada
149.55
189.46
7
Naroni
232.87
234.74
8
Danga Berasiya
15.58
99.49
9
Gadariya Konder
10.97
79.93
10
Burhi Chanderi
83.14
7.62
11
Lakhari
33.39
39.56
12
Lohagarh
31.91
4.35
Total
968.232
1755.46
B-2.4
Component wise breakup
Component wise breakup
S.no
Component
Forest Land(ha.)
Non-Forest Land(ha.)
1
Spillway Portion
0
4.26
2
Earthen dam portion
1.5
26.5
3
Submergence area
966.74
1724.7
Total
968.24
1755.46
C.
Maps of forest land proposed to be diverted
Division 1. : Ashok Nagar(T)
(i). Area of forest land proposed to be diverted(in ha.) :
694.58
(ii). Nature of the Project:
Non Linear
(a). No. of patches :
One
Patch wise details
Patch No.
Area of Patch(in ha.)
Kml File of Patches
To view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.
694.58
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
Division 2. : Shivpuri(T)
(i). Area of forest land proposed to be diverted(in ha.) :
273.66
(ii). Nature of the Project:
Non Linear
(a). No. of patches :
One
Patch wise details
Patch No.
Area of Patch(in ha.)
Kml File of Patches
To view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.
273.66
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D.
Justification for locating the Project in forest land and details of alternatives examined:
(i). Copy of note containing justification for locating the Project in forest land:
E.
Employment likely to be generated
(i). Whether the Project is likely to generate employment ?:
Yes
(ii). Permanent/Regular Employment(Number of persons):
1950
(iii). Temporary Employment(Number of person-days):
4270000
F.
Displacement of People due to the Project, if any
(i). Whether Project involves displacement?:
Yes
(a). Total Number of families :
944
(b). Number of Scheduled Caste families :
NIL
(c). Number of Schedule Tribes families :
290
(d). Number of other families :
654
(ii). Copy of Rehabilitation and Resettlement Plan:
(a). Copy of approval to Ministry of Tribal Affairs,Government of India to Rehabilitation and Resettlement:
No Data
G.
Details of Cost-Benefit analysis for the Project
(i). Whether the Project requires Cost-Benefit analysis?:
Yes
(a). Copy of Cost-Benefit analysis:
H.
Status of Environmental Clearance
(i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? :
Yes
(a). Status of the Environmental Clearance to the Project:
EC application yet to be submitted
I.
Status of Wildelife Clearance
(i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? :
No
J.
Applicability of special provisions governing Scheduled Areas
(i).Whether the Project or a part thereof is located in a Scheduled Area? :
No
K.
Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
(i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? :
Yes
(a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L.
Details of land identified for Compensatory Afforestation
(i). Whether non-forest or Revenue forest land is required to be provided by User Agency?:
Not Applicable
(ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?:
Not Applicable
(iii) . Reason for not providing Non-Forest Land:
Not Applicable
M.
Hydel/Irrigation/Multipurpose Project
(i). Installed power generation capacity of the Project(in MW):
0
(ii). Total command area of the Project(in ha.):
45047
(a). Copy of the approval of competent authority to the Catchment Area Treatment Plan (CAT Plan):
(b). Copy of the approved CAT plan:
Additional information Details
Documents
S.No
Documents
Remarks
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
Reply of APCCF letter
27
Map ofThree altenate
28
Statement showing the reduction in Dam height
29
3 D image at RL 370 m
30
3 D image at RL 375 m
31
3 D image at RL 380 m
32
3 D image of RL 370 m , 375 m and 380 m
33
Reply for quarry dated 03/11/2016
Print