FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/MP/IRRIG/16372/2015   (ii). Name of Project for which Forest Land is required : KEN-BETWA LINK PROJECT   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Ken- Betwa link project is a multipurpose project among various schemes under the peninsular river development component of NPP. DPR of this project was prepared in the Year 2008. In this respect,project covers both state MP and UP , canal area of UP 196.24 ha which is Non forest area.   (iv). State : Madhya Pradesh   (v). Category of the Proposal : Irrigation   (vi). Shape of forest land proposed to be diverted : Non Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 939300   (viii). Area of forest land proposed for diversion(in ha.): 6017   (ix). Non-forest land required for this project(in ha.): 5967   (x). Total period for which the forest land is proposed to be diverted(in years): 99
A-2. Details of User Agency
  (i). Name : MINISTRY OF WATER RESOURCES,GOVT. OF INDIA NATIONAL WATER DEVELOPMENT AGENCY NWDA   (ii). Address1 : A-3. Sahyog Parishar, Trilanga, Bhopal   (iii). Address2 : Madhya Pradesh   (iv). State : Madhya Pradesh   (v). District : Bhopal   (vi). Pin : 462039   (vii). Landmark : Opposite Sahakari Prashikchhan Kendra   (viii). Email address : eenwdabpl@rediffmail.com   (ix). Landline Telephone No. : 755-2566818   (x). Fax No. : 755-755   (xi). Mobile No. : 9425393854   (xii). Website (if any) : www.nwda.gov.in   (xiii). Legal status of User Agency : Central Government
A-3. Details of Person Making Application
  (i). First Name: Amar   (ii). Middle Name: Shri   (iii). Last Name: Nayak   (iv). Gender: Male   (v). Designation: Executive Engineer   (vi). Address 1: A-3. Sahyog Parishar, Trilanga, Bhopal   (vii). Address 2: Madhya Pradesh   (viii). State: Madhya Pradesh   (ix). District: Bhopal   (x). Tehsil: Huzur   (xi). Pin: 462039   (xii). Landmark: Opposite Sahakari Prashikchhan Kendra   (xiii). Email Address: eenwdabpl@rediffmail.com   (xiv). Landline Telephone No.: 755-2566818   (xv). Fax No.: 07552566818   (xvi). Mobile No.: 9425393854   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Panna National Park5578.922922
2.Chhatarpur(T)337.562097
3.Panna North(T)00
4.Tikamgarh(T)100.52948
Total60175967
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Chhatarpur4581.683906
1.Panna1334.81113
3.Tikamgarh100.52948
Total60175967
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Daudhan37960
2Kharyani1761.49561
3Palkoha494.24826
4Sukwaha552.55275
5Basudha46.6491
6Bhoukua1056.2431
7Ghughari404.3951
8Kupi56.27204
9Shahpura96.6827
10Bedari065.28
11Didoniya015.82
12Ganj021.67
13Jhamtulli066.4
14Kandoha025.5
15Karodiya23.7953.11
16Karree029.81
17Katiya305.13
18Katiya027.39
19Kota014.08
20Lakhrawan024.6
21Pahra22.6442.51
22Turya023.68
23Vardhawaha28.4981.35
24Kabar3.7729.94
25Silon1.9752.45
26Bhusaur02.49
27Deogaon09.47
28Gangwaha010.82
29Garha018.27
30Hatwaha010.12
31Imiliya016.67
32Khairi039.77
33Manpura022.51
34Nayagaon017.92
35Nadya016.29
36Ontapurwa017.67
37Pahadi Maimaru06.35
38Para035.32
39Sadna024.58
40Sewdi016.98
41Vikrampur035.96
42Lugasi3.1475.67
43Mau09.55
44Naygaon052.12
45Tidani025.08
46Khakri Birpur09.52
47Sadrai028.5
48Gadijot036.84
49Gorarijot018.64
50Gour019.35
51Kurraha015.64
52Kusmajot6.1910.5
53Lahar04.09
54Madri09.82
55Maharajpur038.73
56Malharjot010.71
57Mau maharajpur039.76
58Nuna038.11
59Padwaha03.93
60Sela041.25
61Tatam042.55
62Putari05.91
63Pur00.03
64Nathpur021.12
65Budrakh041.59
66Bikora07.78
67Bandi kalan050.92
68Didol011.98
69Isha Nagar04.05
70Katore ka Purwa016.28
71Lahera016.76
72Maharajganj016.4
73Nandgaikalan041.13
74Pathada026.79
75Phadgaon07.89
76Rajapurwa017.86
77Rampur027.68
78Tudar03.82
79Parapatti3025.8
80Purwa020.28
81Sigon00.14
82Bangay Bangaon8205.78
83Bahro Tal0.418.61
84Bamohri Abda8.146.94
85Deoraha4.219.94
86Machhora5.1814.99
87Rajnagar012.27
88Ramnagar khurd00.1
89Tanga030.92
90Bhanpur037.66
91Chakramadhosingh02.09
92Chidari024.63
93Deri023.06
94Dhanera021.27
95Asati Khas016.44
96Bamhori Sheetal0.1324.13
97Binwara04.18
98Devendrapura027.23
99Ghughsi Khas00.23
100Mudara01.33
101Niwadi Bhata025.15
102Niwari Khas07.05
103Teela09.52
104Thona030.74
105Bamhaurikalan028.59
106Barkachhar07.73
107Basatgua1.227.17
108Bhatgoura025.84
109Bhagwantpura Khirak09.64
110Chari66.560.22
111Chhidara012.16
112Etaile0.7923.09
113Guda Naj Pali2.2630.66
114Jaraya019.8
115Jewar033.91
116Jitkora09.76
117Magrai012.34
118Mardanpura08.58
119Mendwara027.47
120Moramanna012.04
121Maunthi04.22
122Nuna Palera014.52
123Pachaura03.98
124Pachghora011.54
125Pali3.3223.97
126Phulpur014.9
127Ram Nagar Buzurg046.03
128Rampur Urf Nibawari4.84.47
129Ratwas024.29
130Semra Khurd01.68
131Upara Chakra307.96
132Uprarakhas09.19
133Varana056.36
134Out PTR Panna0495
135PTR Panna979618
136Tagedi3.5827.06
Total 6017 5966.91
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Canal LBC0631
2Submergence Area57613239
3Spillway300
4Power House-170
5Power House-240
6Upper level tunnel1.150
7Lower level tunnel0.550
8Plant area50
9Road Bhusor gate to Dam Axis100
10Approach road for PH-220
11Road from plant area to abutment0.80
12Land of switch yard,transformer yard etc.50
13Canal190.52097
Total 6017 5967
C. Maps of forest land proposed to be diverted
Division 1. : Panna National Park
  (i). Area of forest land proposed to be diverted(in ha.) : 5578.92   (ii). Nature of the Project: Non Linear   (a). No. of patches : One
Patch wise details
Patch No. Area of Patch(in ha.) Kml File of PatchesTo view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.5578.92    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
Division 2. : Panna North(T)
  (i). Area of forest land proposed to be diverted(in ha.) : 0   (ii). Nature of the Project: Non Linear   (a). No. of patches : One
Patch wise details
Patch No. Area of Patch(in ha.) Kml File of PatchesTo view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.0    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
Division 3. : Chhatarpur(T)
  (i). Area of forest land proposed to be diverted(in ha.) : 337.56   (ii). Nature of the Project: Non Linear   (a). No. of patches : One
Patch wise details
Patch No. Area of Patch(in ha.) Kml File of PatchesTo view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.337.56    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
Division 4. : Tikamgarh(T)
  (i). Area of forest land proposed to be diverted(in ha.) : 100.5   (ii). Nature of the Project: Non Linear   (a). No. of patches : One
Patch wise details
Patch No. Area of Patch(in ha.) Kml File of PatchesTo view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.100.5    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 5000   (iii). Temporary Employment(Number of person-days): 10950000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: Yes   (a). Total Number of families : 1913   (b). Number of Scheduled Caste families : 271   (c). Number of Schedule Tribes families : 648   (d). Number of other families : 994   (ii). Copy of Rehabilitation and Resettlement Plan:   (a). Copy of approval to Ministry of Tribal Affairs,Government of India to Rehabilitation and Resettlement:
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: Yes   (a). Copy of Cost-Benefit analysis:
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : Yes   (a). Status of the Environmental Clearance to the Project: EC application yet to be submitted
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : Yes   (a). Whether Project or a part thereof is located within a Protected Area ? : Yes   (b). Status of approval of the Supreme Court : Application yet to b   (ii). Status of approval of the Standing Committee of National Board for the Wildlife(NBWL) to the Project : Application yet to be submitted
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : Yes
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Not Applicable   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Not Applicable   (iii) . Reason for not providing Non-Forest Land: Not Applicable
M. Hydel/Irrigation/Multipurpose Project
  (i). Installed power generation capacity of the Project(in MW): 78   (ii). Total command area of the Project(in ha.): 515215   (a). Copy of the approval of competent authority to the Catchment Area Treatment Plan (CAT Plan):   (b). Copy of the approved CAT plan:   (a). Copy of the approval of competent authority to the Catchment Area Treatment Plan (CAT Plan):   (b). Copy of the approved CAT plan:
Additional information Details
Documents
S.No Documents
Remarks
1
2
3
4
5Query sought by DFO dated 23-04-2016
6Query sought by DFO dated 01-05-2016
7Query sought by FD Panna dated 03-06-2016
8Querry sought by DFO Chhatarpur and Director PTR
9Query sought by DFO chhatarpur dated 22-06-2016
10Query sought by DFO dated 04-07-2016
11Query sought by DFO dated 05-09-2016