FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/MP/IRRIG/139995/2021   (ii). Name of Project for which Forest Land is required : ISP KALISINDH PHASE-II MICRO LIFT IRRIGATION PROJECT SCHEME (PIPELINE)   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Project provides irrigation facilities to 270 villages of shajapur and rajgarh district   (iv). State : Madhya Pradesh   (v). Category of the Proposal : Irrigation   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 461934   (viii). Area of forest land proposed for diversion(in ha.): 147.09   (ix). Non-forest land required for this project(in ha.): 40   (x). Total period for which the forest land is proposed to be diverted(in years): 99
A-2. Details of User Agency
  (i). Name : EE ND DIVISION NO TWENTY MANDLESHWAR   (ii). Address1 : Narmada Development Division number 20 Mandleshwar   (iii). Address2 : NIL   (iv). State : Madhya Pradesh   (v). District : Khargaone   (vi). Pin : 451221   (vii). Landmark : Near Snake Temple   (viii). Email address : eenvda20mdl1@gmail.com   (ix). Landline Telephone No. : 7283-2333440   (x). Fax No. : 7283-   (xi). Mobile No. : 8959116615   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: T   (ii). Middle Name: R   (iii). Last Name: Pachore   (iv). Gender: Male   (v). Designation: ExecutiveEngineer   (vi). Address 1: Narmada Development Division number 20 Mandleshwar   (vii). Address 2: NIL   (viii). State: Madhya Pradesh   (ix). District: Khargaone   (x). Tehsil: maheshwar   (xi). Pin: 451221   (xii). Landmark: Near Snake Temple   (xiii). Email Address: eeenvda20mdl@gmail.com   (xiv). Landline Telephone No.: 7283-2333440   (xv). Fax No.: NIL   (xvi). Mobile No.: 9425046676   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Khandwa(T)46.9890
2.Dewas(T)100.10140
Total147.0940
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Khandwa46.9890
1.Dewas100.10140
Total147.0940
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Boranya11.7090
2Devasya7.4130
3Tumri Kheda13.910
4Bajrang garh02.183
5Dehri7.0930.837
6Bor Khalya024.418
7Piplya Khari5.0620
8Rupalipura010.827
9Gadiya01.735
10Singladeh31.2280
11Kharadi23.6860
12Banka Palash (Viraan)46.9890
Total 147.09 40
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Single Pipeline (4.6 mtr. dia) with Transmission L111.647520.25
2Single Pipeline (4.6 mtr. dia)19.26259.25
3Pump House No. 15.940
4Pump House No. 205
5Pump House No. 37.190
6Pump House No. 405
7BPT 10.50
8BPT 20.50
9DC00.5
10Approach Road to PH 30.50
11Approach Road to BPT-10.50
12Approach Road to BPT-21.050
Total 147.09 40
C. Maps of forest land proposed to be diverted
Division 1. : Dewas(T)
  (i). Area of forest land proposed to be diverted(in ha.) : 100.101   (ii). Nature of the Project: Linear   (b). No. of Segments : Eleven
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.60.421    View File
2.2.19    View File
3.1.221    View File
4.5.92    View File
5.1.846    View File
6.7.475    View File
7.11.788    View File
8.7.19    View File
9.0.5    View File
10.0.50
11.1.051
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
Division 2. : Khandwa(T)
  (i). Area of forest land proposed to be diverted(in ha.) : 46.989   (ii). Nature of the Project: Linear   (b). No. of Segments : Six
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.0.725    View File
2.1.428    View File
3.37.896    View File
4.5.94    View File
5.0.5    View File
6.0.5    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 150   (iii). Temporary Employment(Number of person-days): 1500
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: Yes   (a). Copy of Cost-Benefit analysis:
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : Yes   (a). Status of the Environmental Clearance to the Project: EC under process   (ii). Environmental Clearance File No.: 7044/2020
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Yes   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii). No. of districts involved for raising Compensatory Afforestation: 1   (iv). No. of patches: Five
District 1. : Shajapur
  (a). Village: Favaka   (b). Area(in ha.): 39.54   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 816/1 to 816/19, 816/822   (e). Present owner: User Agency   (f). Copy of Ownership proof:
District 2. : Shajapur
  (a). Village: Kadula   (b). Area(in ha.): 25.48   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 2243/3, 2244, 2245, 2246, 2247   (e). Present owner: User Agency   (f). Copy of Ownership proof:
District 3. : Shajapur
  (a). Village: Malyahedi   (b). Area(in ha.): 13.44   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 939, 941   (e). Present owner: User Agency   (f). Copy of Ownership proof:
District 4. : Shajapur
  (a). Village: Mangliya   (b). Area(in ha.): 44.76   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 72, 73, 44/3, 182, 220, 285/4, 736/4, 239   (e). Present owner: User Agency   (f). Copy of Ownership proof:
District 5. : Shajapur
  (a). Village: Bandahedi   (b). Area(in ha.): 28   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 103, 313, 435   (e). Present owner: User Agency   (f). Copy of Ownership proof:
  (v). Scanned copy of the map of the land identified for creation of Compensatory Afforestation prepared by using GPS ot Total Station:   (vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land identified for creation of Compensatory Afforestation:
M. Hydel/Irrigation/Multipurpose Project
  (i). Installed power generation capacity of the Project(in MW): 0   (ii). Total command area of the Project(in ha.): 0
Additional information Details
Documents
S.No Documents
Remarks
1
2INDEX MAP
3Reply letter dated 16-04-2021
4CA undertaking
5Collector Shajapur CA Order
6Component wise breakup
7Coordinate
8Cost Benefit Analysis
9Extra NPV
10Minimume Forest Area
11Muk Disposal
12NPV
13SOI KALISINDH II FULL_WITH COMPT
14SOI KALISINDH II KHANDWA_WITH COMPT
15SOI KALISINDH II DEWAS_WITH COMPT Signed