FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A.
General Details
A-1.
Project Details
(i). Proposal No. :
FP/MH/IRRIG/39591/2019
(ii). Name of Project for which Forest Land is required :
ASOLAMENDHA RENOVATION PROJECT
(iii). Short narrative of the proposal and Project/scheme for which the forest land is required :
TO INCREASE THE IRRIGATION PROTENTIAL OF ASOLAMENDHA PROJECT THE HEIGHT OF THE DAM IS TO BE RAISED BY 2.70 M.HENCE FOR ADDITIONAL SUBMERGENCE AND CANAL NETWORK FOREST LAND IS REQUIRED.
(iv). State :
Maharashtra
(v). Category of the Proposal :
Irrigation
(vi). Shape of forest land proposed to be diverted :
Hybrid
(vii). Estimated cost of the Project(Rupees in lacs) :
226.6
(viii). Area of forest land proposed for diversion(in ha.):
315.74
(ix). Non-forest land required for this project(in ha.):
628.76
(x). Total period for which the forest land is proposed to be diverted(in years):
100
A-2.
Details of User Agency
(i). Name :
EXECUTIVE ENGINEER ASOLAMENDHA PROJECT RENOVATION DIVISION NO ONE MUL
(ii). Address1 :
Asolamendha Project Renovation Div No.1 Mul (MS), Behind Tahsil Office mul
(iii). Address2 :
NIL
(iv). State :
Maharashtra
(v). District :
Chandrapur
(vi). Pin :
441224
(vii). Landmark :
NIL
(viii). Email address :
eeaprdn1@gmail.com
(ix). Landline Telephone No. :
7179-240215
(x). Fax No. :
7179-
(xi). Mobile No. :
9421701538
(xii). Website (if any) :
NIL
(xiii). Legal status of User Agency :
State Government
A-3.
Details of Person Making Application
(i). First Name:
JITENDRA
(ii). Middle Name:
BHAGWANTRAO
(iii). Last Name:
TURKHEDE
(iv). Gender:
Male
(v). Designation:
EE
(vi). Address 1:
EE ASOLAMENDHA PROJECT RENOVATION DIV NO.1 MUL
(vii). Address 2:
NIL
(viii). State:
Maharashtra
(ix). District:
Chandrapur
(x). Tehsil:
Mul
(xi). Pin:
441224
(xii). Landmark:
NIL
(xiii). Email Address:
eeaprdn1@gmail.com
(xiv). Landline Telephone No.:
7179-240215
(xv). Fax No.:
NIL
(xvi). Mobile No.:
8380098321
(xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B.
Details of land required for the Project
B-1.
Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no
Proposal Status.
Proposal No.
Moef File No.
Area Proposed for Diversion(Ha.)
Area Diverted(Ha.)
Date of In-Principle Approval
Date of Final Approval
NIL
B-2.
Details of forest land proposed to be diverted
B-2.1
Details of Divisions involved
Details of Divisions involved
S.no
Division Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Bramhapuri
168.86
372.31
2.
Chandrapur
126.34
196.65
3.
Central Chanda
20.54
59.8
Total
315.74
628.76
B-2.2
Details of Districts involved
District wise breakup
S.no
District Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Chandrapur
315.74
628.76
Total
315.74
628.76
B-2.3
Village wise breakup
Villages wise breakup
S.no
Village
Forest Land(ha.)
Non-Forest Land(ha.)
1
Kanhargaon
115.61
63.03
2
Samda Khurd
20.56
18.57
3
Tekari Tukum
31.51
72.37
4
Gunjewahi Kotha
0.05
2.3
5
Gunjewahi mal 1
1.12
79.53
6
Asola ch
6.45
48
7
Pawna ch
0
28.34
8
Saradpar Rith
0
12.99
9
Pawanpar
0
95.18
10
Sawangi Dixit
19.01
34.72
11
Usarpar ch
0
0.61
12
Bhanapur
36.09
22.13
13
Pathari
10.3
0.04
14
KArgaon ch
10.62
6.99
15
Rajoli ch
3.26
7.23
16
Bhattijam
0.94
0
17
Ghodewahi
5.12
0
18
Kondekhal
0.64
0
19
Singapur
1.69
6.58
20
Kesarwahi
0.48
7.3
21
Babrala
0.75
0.6
22
Kisannagar
4.42
0
23
Hirapur
4.53
7.92
24
Sindola
1.97
0
25
Chak Piranji
4.06
2.74
26
Bhawrala
0.67
9.54
27
Chak Virkhal
1.58
0
28
chichbodi
0.75
0
29
Vyahad Bj
0.91
0
30
Ghosari
7.77
5.55
31
Futana Mokasa
3.76
10.51
32
Dighori
1.95
9.41
33
Benbal
6.32
1.7
34
Saoli
0
10.41
35
Chandapur
0
1.83
36
Palebarsa
12.85
0
37
Junasurla
0
4.24
38
Rajgad
0
5.57
39
Gadisurla
0
2.76
40
Chakdugada
0
3.98
41
Churul tukum
0
2.01
42
Saoli tu
0
4.56
43
Dugada mal
0
1.34
44
Saimara
0
3.1
45
Chak Khapri
0
13.33
46
Navegaon More
0
14.12
47
Selur ch
0
0.39
48
Chak Futana
0
1.19
49
Chak Kosambi
0
3.17
50
Bothali
0
1.25
51
Sellur Nagareddi
0
1.63
Total
315.74
628.76
B-2.4
Component wise breakup
Component wise breakup
S.no
Component
Forest Land(ha.)
Non-Forest Land(ha.)
1
CANAL AND NETWORK SYSTEM
72.47
99.08
2
Submergence
243.27
529.68
Total
315.74
628.76
C.
Maps of forest land proposed to be diverted
Division 1. : Chandrapur
(i). Area of forest land proposed to be diverted(in ha.) :
126.34
(ii). Nature of the Project:
Hybrid
(a). No. of patches :
One
Patch wise details
Patch No.
Area of Patch(in ha.)
Kml File of Patches
To view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.
126.34
View File
(b). No. of Segments :
One
Segment wise details
Segments
Segment Area(in ha.)
Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.
0
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
Division 2. : Central Chanda
(i). Area of forest land proposed to be diverted(in ha.) :
20.54
(ii). Nature of the Project:
Hybrid
(a). No. of patches :
One
Patch wise details
Patch No.
Area of Patch(in ha.)
Kml File of Patches
To view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.
20.54
View File
(b). No. of Segments :
One
Segment wise details
Segments
Segment Area(in ha.)
Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.
0
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
Division 3. : Bramhapuri
(i). Area of forest land proposed to be diverted(in ha.) :
168.86
(ii). Nature of the Project:
Hybrid
(a). No. of patches :
One
Patch wise details
Patch No.
Area of Patch(in ha.)
Kml File of Patches
To view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.
168.86
View File
(b). No. of Segments :
One
Segment wise details
Segments
Segment Area(in ha.)
Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.
0
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D.
Justification for locating the Project in forest land and details of alternatives examined:
(i). Copy of note containing justification for locating the Project in forest land:
(ii). Whether a copy of map indicating location of alternative examine is required to be provided:
No
(a). Reason for not providing such map:
MINIMUM FOREST AREA SELECTED FOR THIS PROJECT.
E.
Employment likely to be generated
(i). Whether the Project is likely to generate employment ?:
Yes
(ii). Permanent/Regular Employment(Number of persons):
0
(iii). Temporary Employment(Number of person-days):
133560000
F.
Displacement of People due to the Project, if any
(i). Whether Project involves displacement?:
Yes
(a). Total Number of families :
152
(b). Number of Scheduled Caste families :
15
(c). Number of Schedule Tribes families :
65
(d). Number of other families :
72
(ii). Copy of Rehabilitation and Resettlement Plan:
(a). Copy of approval to Ministry of Tribal Affairs,Government of India to Rehabilitation and Resettlement:
G.
Details of Cost-Benefit analysis for the Project
(i). Whether the Project requires Cost-Benefit analysis?:
Yes
(a). Copy of Cost-Benefit analysis:
No Data
H.
Status of Environmental Clearance
(i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? :
Yes
(a). Status of the Environmental Clearance to the Project:
EC obtained
(b). Environmental Clearance File No.:
j-11016(7)/84-EN.5/IA
(c). Copy of Environmental Clearance to the Project:
(d). Date of grant of Environmental Clearance to the Project:
1988-02-03
I.
Status of Wildelife Clearance
(i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? :
No
J.
Applicability of special provisions governing Scheduled Areas
(i).Whether the Project or a part thereof is located in a Scheduled Area? :
Yes
K.
Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
(i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? :
Yes
(a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L.
Details of land identified for Compensatory Afforestation
(i). Whether non-forest or Revenue forest land is required to be provided by User Agency?:
Yes
(ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?:
No
(iii). No. of districts involved for raising Compensatory Afforestation:
1
(iv). No. of patches:
One
District 1. : Yavatmal
(a). Village:
Pahur and Dhabha
(b). Area(in ha.):
315.74
(c). Copy of KML file of the patch:
View File
(d). Khasra details:
93/1,94,97,98,99/1,99/2,100/101/1,100/2,102,i03/1,103/1/A,l 03/2,103/3,l05/1,105/ 1/A, 105/1/B,105/2,105/3,l06,107/1,10712,107/3,147/1,147/2,147/3,147/4,148/2, 149,l 50/1,150/2,154/2,154/3,156/1,156/2
(e). Present owner:
User Agency
(f). Copy of Ownership proof:
No Data
(v). Scanned copy of the map of the land identified for creation of Compensatory Afforestation prepared by using GPS ot Total Station:
(vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land identified for creation of Compensatory Afforestation:
M.
Hydel/Irrigation/Multipurpose Project
(i). Installed power generation capacity of the Project(in MW):
0.00
(ii). Total command area of the Project(in ha.):
54879
(a). Copy of the approval of competent authority to the Catchment Area Treatment Plan (CAT Plan):
No Data
(b). Copy of the approved CAT plan:
No Data
Additional information Details
Documents
S.No
Documents
Remarks
1
ASOLAMENDHA PROJECT IRRIGATION POTENTIAL : 54879 Ha.
2
CA Land Map
3
Authority letter
4
EC
5
Rehab plan
6
Suitability Certificate
7
CA Scheme
8
BC Ration
9
CAT Plan
10
FDCM NOC English Translation
11
FDCM NOC Marathi
12
All Div Index Map
13
EDS 10.10.2023 Complainces
14
Additional EDS Complainces
15
EDS 20.05.2024 Compliances
Print