FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/MH/IRRIG/39591/2019   (ii). Name of Project for which Forest Land is required : ASOLAMENDHA RENOVATION PROJECT   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : TO INCREASE THE IRRIGATION PROTENTIAL OF ASOLAMENDHA PROJECT THE HEIGHT OF THE DAM IS TO BE RAISED BY 2.70 M.HENCE FOR ADDITIONAL SUBMERGENCE AND CANAL NETWORK FOREST LAND IS REQUIRED.   (iv). State : Maharashtra   (v). Category of the Proposal : Irrigation   (vi). Shape of forest land proposed to be diverted : Hybrid   (vii). Estimated cost of the Project(Rupees in lacs) : 226.6   (viii). Area of forest land proposed for diversion(in ha.): 315.74   (ix). Non-forest land required for this project(in ha.): 628.76   (x). Total period for which the forest land is proposed to be diverted(in years): 100
A-2. Details of User Agency
  (i). Name : EXECUTIVE ENGINEER ASOLAMENDHA PROJECT RENOVATION DIVISION NO ONE MUL   (ii). Address1 : Asolamendha Project Renovation Div No.1 Mul (MS), Behind Tahsil Office mul   (iii). Address2 : NIL   (iv). State : Maharashtra   (v). District : Chandrapur   (vi). Pin : 441224   (vii). Landmark : NIL   (viii). Email address : eeaprdn1@gmail.com   (ix). Landline Telephone No. : 7179-240215   (x). Fax No. : 7179-   (xi). Mobile No. : 9421701538   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: JITENDRA   (ii). Middle Name: BHAGWANTRAO   (iii). Last Name: TURKHEDE   (iv). Gender: Male   (v). Designation: EE   (vi). Address 1: EE ASOLAMENDHA PROJECT RENOVATION DIV NO.1 MUL   (vii). Address 2: NIL   (viii). State: Maharashtra   (ix). District: Chandrapur   (x). Tehsil: Mul   (xi). Pin: 441224   (xii). Landmark: NIL   (xiii). Email Address: eeaprdn1@gmail.com   (xiv). Landline Telephone No.: 7179-240215   (xv). Fax No.: NIL   (xvi). Mobile No.: 8380098321   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Bramhapuri168.86372.31
2.Chandrapur126.34196.65
3.Central Chanda20.5459.8
Total315.74628.76
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Chandrapur315.74628.76
Total315.74628.76
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Kanhargaon115.6163.03
2Samda Khurd20.5618.57
3Tekari Tukum31.5172.37
4Gunjewahi Kotha0.052.3
5Gunjewahi mal 11.1279.53
6Asola ch6.4548
7Pawna ch028.34
8Saradpar Rith012.99
9Pawanpar095.18
10Sawangi Dixit19.0134.72
11Usarpar ch00.61
12Bhanapur36.0922.13
13Pathari10.30.04
14KArgaon ch10.626.99
15Rajoli ch3.267.23
16Bhattijam0.940
17Ghodewahi5.120
18Kondekhal0.640
19Singapur1.696.58
20Kesarwahi0.487.3
21Babrala0.750.6
22Kisannagar4.420
23Hirapur4.537.92
24Sindola1.970
25Chak Piranji4.062.74
26Bhawrala0.679.54
27Chak Virkhal1.580
28chichbodi0.750
29Vyahad Bj0.910
30Ghosari7.775.55
31Futana Mokasa3.7610.51
32Dighori1.959.41
33Benbal6.321.7
34Saoli010.41
35Chandapur01.83
36Palebarsa12.850
37Junasurla04.24
38Rajgad05.57
39Gadisurla02.76
40Chakdugada03.98
41Churul tukum02.01
42Saoli tu04.56
43Dugada mal01.34
44Saimara03.1
45Chak Khapri013.33
46Navegaon More014.12
47Selur ch00.39
48Chak Futana01.19
49Chak Kosambi03.17
50Bothali01.25
51Sellur Nagareddi01.63
Total 315.74 628.76
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1CANAL AND NETWORK SYSTEM72.4799.08
2Submergence243.27529.68
Total 315.74 628.76
C. Maps of forest land proposed to be diverted
Division 1. : Chandrapur
  (i). Area of forest land proposed to be diverted(in ha.) : 126.34   (ii). Nature of the Project: Hybrid   (a). No. of patches : One
Patch wise details
Patch No. Area of Patch(in ha.) Kml File of PatchesTo view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.126.34    View File
  (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.0    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
Division 2. : Central Chanda
  (i). Area of forest land proposed to be diverted(in ha.) : 20.54   (ii). Nature of the Project: Hybrid   (a). No. of patches : One
Patch wise details
Patch No. Area of Patch(in ha.) Kml File of PatchesTo view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.20.54    View File
  (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.0    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
Division 3. : Bramhapuri
  (i). Area of forest land proposed to be diverted(in ha.) : 168.86   (ii). Nature of the Project: Hybrid   (a). No. of patches : One
Patch wise details
Patch No. Area of Patch(in ha.) Kml File of PatchesTo view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.168.86    View File
  (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.0    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: No   (a). Reason for not providing such map: MINIMUM FOREST AREA SELECTED FOR THIS PROJECT.
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 0   (iii). Temporary Employment(Number of person-days): 133560000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: Yes   (a). Total Number of families : 152   (b). Number of Scheduled Caste families : 15   (c). Number of Schedule Tribes families : 65   (d). Number of other families : 72   (ii). Copy of Rehabilitation and Resettlement Plan:   (a). Copy of approval to Ministry of Tribal Affairs,Government of India to Rehabilitation and Resettlement:
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: Yes   (a). Copy of Cost-Benefit analysis: No Data
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : Yes   (a). Status of the Environmental Clearance to the Project: EC obtained   (b). Environmental Clearance File No.: j-11016(7)/84-EN.5/IA   (c). Copy of Environmental Clearance to the Project:   (d). Date of grant of Environmental Clearance to the Project: 1988-02-03
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : Yes
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Yes   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii). No. of districts involved for raising Compensatory Afforestation: 1   (iv). No. of patches: One
District 1. : Yavatmal
  (a). Village: Pahur and Dhabha   (b). Area(in ha.): 315.74   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 93/1,94,97,98,99/1,99/2,100/101/1,100/2,102,i03/1,103/1/A,l 03/2,103/3,l05/1,105/ 1/A, 105/1/B,105/2,105/3,l06,107/1,10712,107/3,147/1,147/2,147/3,147/4,148/2, 149,l 50/1,150/2,154/2,154/3,156/1,156/2   (e). Present owner: User Agency   (f). Copy of Ownership proof: No Data
  (v). Scanned copy of the map of the land identified for creation of Compensatory Afforestation prepared by using GPS ot Total Station:   (vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land identified for creation of Compensatory Afforestation:
M. Hydel/Irrigation/Multipurpose Project
  (i). Installed power generation capacity of the Project(in MW): 0.00   (ii). Total command area of the Project(in ha.): 54879   (a). Copy of the approval of competent authority to the Catchment Area Treatment Plan (CAT Plan): No Data   (b). Copy of the approved CAT plan: No Data
Additional information Details
Documents
S.No Documents
Remarks
1ASOLAMENDHA PROJECT IRRIGATION POTENTIAL : 54879 Ha.
2CA Land Map
3Authority letter
4EC
5Rehab plan
6Suitability Certificate
7CA Scheme
8BC Ration
9CAT Plan
10FDCM NOC English Translation
11FDCM NOC Marathi
12All Div Index Map
13EDS 10.10.2023 Complainces
14Additional EDS Complainces
15EDS 20.05.2024 Compliances