FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A.
General Details
A-1.
Project Details
(i). Proposal No. :
FP/LA/TRANS/151761/2022
(ii). Name of Project for which Forest Land is required :
220 kV Drass-Padum S/C Transmission Line under plan PMDP 2015
(iii). Short narrative of the proposal and Project/scheme for which the forest land is required :
220 kV S/C Transmission Line from Drass-Padum is to be established in Kargil district of Ladakh under PMDP-2015. The said transmission line is extremely important to ensure uninterrupted quality grid power supply to the people of Ladakh as well as Defence establishments in the UT Ladakh region.
(iv). State :
Ladakh
(v). Category of the Proposal :
Transmission Line
(vi). Shape of forest land proposed to be diverted :
Linear
(vii). Estimated cost of the Project(Rupees in lacs) :
72817
(viii). Area of forest land proposed for diversion(in ha.):
5.14
(ix). Non-forest land required for this project(in ha.):
646.42
(x). Total period for which the forest land is proposed to be diverted(in years):
40
A-2.
Details of User Agency
(i). Name :
CHIEF ENGINEER, LADAKH POWER DEVELOPMENT DEPARTMENT
(ii). Address1 :
Sub Transmission Division
(iii). Address2 :
NIL
(iv). State :
Ladakh
(v). District :
Leh
(vi). Pin :
194101
(vii). Landmark :
Bomb Ghar
(viii). Email address :
xenstdleh@gmail.com
(ix). Landline Telephone No. :
1982-251244
(x). Fax No. :
1982-251244
(xi). Mobile No. :
9596949606
(xii). Website (if any) :
NIL
(xiii). Legal status of User Agency :
State Government
A-3.
Details of Person Making Application
(i). First Name:
Tundup
(ii). Middle Name:
NIL
(iii). Last Name:
Spalzang
(iv). Gender:
Male
(v). Designation:
Executive Engineer
(vi). Address 1:
Sub Transmission Division, Leh
(vii). Address 2:
NIL
(viii). State:
Ladakh
(ix). District:
Leh
(x). Tehsil:
Leh
(xi). Pin:
194101
(xii). Landmark:
NIL
(xiii). Email Address:
xenstdleh@gmail.com
(xiv). Landline Telephone No.:
1982-251244
(xv). Fax No.:
01982251244
(xvi). Mobile No.:
9596949606
(xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B.
Details of land required for the Project
B-1.
Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no
Proposal Status.
Proposal No.
Moef File No.
Area Proposed for Diversion(Ha.)
Area Diverted(Ha.)
Date of In-Principle Approval
Date of Final Approval
NIL
B-2.
Details of forest land proposed to be diverted
B-2.1
Details of Divisions involved
Details of Divisions involved
S.no
Division Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Kargil
5.14
646.42
Total
5.14
646.42
B-2.2
Details of Districts involved
District wise breakup
S.no
District Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Kargil
5.14
646.42
Total
5.14
646.42
B-2.3
Village wise breakup
Villages wise breakup
S.no
Village
Forest Land(ha.)
Non-Forest Land(ha.)
1
Manda, Phey, Acting, Shager, Saini
5.14
646.42
Total
5.14
646.42
B-2.4
Component wise breakup
Component wise breakup
S.no
Component
Forest Land(ha.)
Non-Forest Land(ha.)
1
Linear (Zanskar Range)
5.138
646.415
Total
5.138
646.415
C.
Maps of forest land proposed to be diverted
Division 1. : Kargil
(i). Area of forest land proposed to be diverted(in ha.) :
5.14
(ii). Nature of the Project:
Linear
(b). No. of Segments :
One
Segment wise details
Segments
Segment Area(in ha.)
Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.
5.14
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D.
Justification for locating the Project in forest land and details of alternatives examined:
(i). Copy of note containing justification for locating the Project in forest land:
(ii). Whether a copy of map indicating location of alternative examine is required to be provided:
No
(a). Reason for not providing such map:
DGRE advised Route, forest barest minim in route
E.
Employment likely to be generated
(i). Whether the Project is likely to generate employment ?:
Yes
(ii). Permanent/Regular Employment(Number of persons):
0
(iii). Temporary Employment(Number of person-days):
50
F.
Displacement of People due to the Project, if any
(i). Whether Project involves displacement?:
No
G.
Details of Cost-Benefit analysis for the Project
(i). Whether the Project requires Cost-Benefit analysis?:
No
H.
Status of Environmental Clearance
(i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? :
No
I.
Status of Wildelife Clearance
(i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? :
No
J.
Applicability of special provisions governing Scheduled Areas
(i).Whether the Project or a part thereof is located in a Scheduled Area? :
No
K.
Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
(i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? :
No
L.
Details of land identified for Compensatory Afforestation
(i). Whether non-forest or Revenue forest land is required to be provided by User Agency?:
No
(ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?:
No
(iii) . Reason for not providing Non-Forest Land:
Central Govt. Project
Additional information Details
Documents
S.No
Documents
Remarks
1
UNDERTAKING FOR FRA CERTIFICATE
2
UNDERTAKING FOR MINIMUM USE OF FOREST LAND
3
UNDERTAKING FOR MINIMUM FELLING OF TREES
4
UNDERTAKING FOR MUCK DISPOSAL
5
UNDERTAKING TO PAY COMPENSATARY AFFORESTATION
6
UNDERTAKING TO PAY NET PRESENT VALUE OF FOREST LAND
7
UNDERTAKING TO PAY EXTRACTION CHARGES OF TREES
8
Bare Minimum Forest Requirement Certificate 1
9
Bare Minimum Forest Requirement Certificate 2
10
CERTIFICATE ON NON VIOLATION OF FOREST CONSERVATION ACT
11
Key Project Details
12
e-Joint Survey Report
13
Detailed Project Report
14
In response to the query raised by the DFO, Kargil dated 27.04.2022, the joint inspection has recently been completed for all 3 packages with all kind support extended by the Forest Department, Kargil. A compiled joint inspection report for all three packages has been uploaded for further necessary action at your end, please.
15
Reply to queries raised by DFO, Kargil on dated 16.08.2022
16
Reply to DFO Query dated 12.12.2022
17
Clarification of LPDD against query raised by DFO on dated 23..01.2023 reg. compensatory non forest land
18
As per the query raised by DFO Kargil dated 08.05.2023, a joint survey of the trees coming under the alignment of 220 kV Drass-Padum Transmission Line has been carried out along with the officers of Forest Department Kargil. A report issued by DFO Kargil in this regard is enclosed herewith for kind reference and further necessary action, please.
19
CA land alloted by DC Kargil
20
Alignment marked on SOI toposheed
21
Geo-reference Map of the proposed alignment.
22
geologist report of the proposed sie.
23
Schematic layout plan showing the dimension of the diversion.