FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/KA/WIND/38530/2019   (ii). Name of Project for which Forest Land is required : Ex-post facto approval for already established one Wind Mill of 0.95 MW Wind Power Project of M/s. Ramgad Minerals & Mining Limited at Guddadarangavvanahalli, Kasaba Hobli, Chitradurga Taluk and District   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : M/s Ramgad Minerals & Mining Limited to set up 1 X 0.95 MW wind energy project at Guddadaravangavvanahalli, Chitraduga taluk& Dist as per Govt of Karnataka Order   (iv). State : Karnataka   (v). Category of the Proposal : Wind Power   (vi). Shape of forest land proposed to be diverted : Hybrid   (vii). Estimated cost of the Project(Rupees in lacs) : 500   (viii). Area of forest land proposed for diversion(in ha.): 2.63   (ix). Non-forest land required for this project(in ha.): 0   (x). Total period for which the forest land is proposed to be diverted(in years): 30
A-2. Details of User Agency
  (i). Name : RMM LIMITED WIND   (ii). Address1 : BALDOTA ENCLAVE, ABHERAJ BALDOTA ROAD, HOSAPETE   (iii). Address2 : NIL   (iv). State : Karnataka   (v). District : Bellary   (vi). Pin : 583203   (vii). Landmark : NEAR SAI BABA TEMPLE   (viii). Email address : mpsaradhi@mspllimited.com   (ix). Landline Telephone No. : 8394-232005   (x). Fax No. : 8394-232444   (xi). Mobile No. : 9900532940   (xii). Website (if any) : rmml.in   (xiii). Legal status of User Agency : Private
A-3. Details of Person Making Application
  (i). First Name: CHIDANAND   (ii). Middle Name: NIL   (iii). Last Name: NARUTE   (iv). Gender: Male   (v). Designation: MANAGER   (vi). Address 1: BALDOTA ENCLAVE, ABHERAJ BALDOTA ROAD, HOSAPETE   (vii). Address 2: NIL   (viii). State: Karnataka   (ix). District: Bellary   (x). Tehsil: Hospet   (xi). Pin: 583203   (xii). Landmark: NEAR SAI BABA TEMPLE   (xiii). Email Address: chidanand.n@rmml.in   (xiv). Landline Telephone No.: 8394-232005   (xv). Fax No.: 08394232444   (xvi). Mobile No.: 9900532940   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Chitradurga2.630
Total2.630
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Chitradurga2.630
Total2.630
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1GUDDADARANGAVVANAHALLI, SY No 972.630
Total 2.63 0
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1WTG(WINDMILL)0.20250
2METERING YARD0.020
3APPROACH ROAD0.10
433KV TRANSMISSION LINE2.30
Total 2.6225 0
C. Maps of forest land proposed to be diverted
Division 1. : Chitradurga
  (i). Area of forest land proposed to be diverted(in ha.) : 2.63   (ii). Nature of the Project: Hybrid   (a). No. of patches : Two
Patch wise details
Patch No. Area of Patch(in ha.) Kml File of PatchesTo view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.0.2025    View File
2.0.02    View File
  (b). No. of Segments : Two
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.0.1    View File
2.2.3    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: No   (a). Reason for not providing such map: Existing project
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 2   (iii). Temporary Employment(Number of person-days): 2
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: Yes   (a). Copy of Cost-Benefit analysis:
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Yes   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii). No. of districts involved for raising Compensatory Afforestation: 1   (iv). No. of patches: One
District 1. : Belgaum
  (a). Village: AMAGAON   (b). Area(in ha.): 2.63   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 6/5   (e). Present owner: User Agency   (f). Copy of Ownership proof:
  (v). Scanned copy of the map of the land identified for creation of Compensatory Afforestation prepared by using GPS ot Total Station:   (vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land identified for creation of Compensatory Afforestation:
Additional information Details
Documents
S.No Documents
Remarks
1UNDERTAKING FOR CA CHARGES
2UNDERTAKING FOR NPV
3Govt Orders
4Clarification of land usage
5Covering letter
6Point wise Clarification
7RMML_Points_Clarification_130519 for shortcomings.
8Reply Letter_14-05-2019
9Area wise details of RMML Project
10MSPL NOC to RMML
11MSPL Share holder details
12RMML Share holder details
13RMML & MSPL company relationship letter
14Point wise clarification of shortcoming letter dated 03.06.2019
15RMML covering letter 16.07.2019
16No DataCadastral map of CA land
17Original revenue sketch of survey no.6 of amagaon village
18POLYGONAL MAP - I SHOWING THE BOUNDARIES OF BOTH PROPOSALS IN FOREST AND REVENUE AREA OF M/s. RAMGAD MINERALS & MINING LIMITED & M/s. MSPL LIMITED
19CADASTRAL MAP - I & II SHOWING THE BOUNDARIES OF BOTH PROPOSALS OF M/s. RAMGAD MINERALS & MINING LIMITED & M/s. MSPL LIMITED
20RMML APPROACH ROAD GPS READINGS IN WGS84. DEGREE.DECIMALS AT EVERY 20 METER
21RMML 33KV TRANSMISSION LINE GPS READINGS IN WGS84. DEGREE.DECIMALS AT EVERY 20 METER
22MSPL APPROACH ROAD GPS READINGS IN WGS84. DEGREE.DECIMALS AT EVERY 20 METER
23MSPL 33KV TRANSMISSION LINE GPS READINGS IN WGS84. DEGREE.DECIMALS AT EVERY 20 METER
24RMML REPLY LETTER WITH CLARIFFICATIONS OF FOREST LETTER DATED 17.08.2019
25RMML letter submission