FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A.
General Details
A-1.
Project Details
(i). Proposal No. :
FP/KA/WATER/27276/2017
(ii). Name of Project for which Forest Land is required :
Vented Barrage to Gangavali River
(iii). Short narrative of the proposal and Project/scheme for which the forest land is required :
Construction of Vented barrage across Gangavali river at Honnalli to supply additional water to karwar-ankola towns, en route villages and project Sea Bird
(iv). State :
Karnataka
(v). Category of the Proposal :
Drinking Water
(vi). Shape of forest land proposed to be diverted :
Non Linear
(vii). Estimated cost of the Project(Rupees in lacs) :
15862
(viii). Area of forest land proposed for diversion(in ha.):
34.98
(ix). Non-forest land required for this project(in ha.):
17.9
(x). Total period for which the forest land is proposed to be diverted(in years):
50
A-2.
Details of User Agency
(i). Name :
KARNATAKA URBAN WATER SUPPLY AND DRAINAGE BOARD
(ii). Address1 :
Office of Assistant executive Engineer , KUWSD&B, Kajubag, Karwar
(iii). Address2 :
NIL
(iv). State :
Karnataka
(v). District :
Uttara Kannada
(vi). Pin :
581301
(vii). Landmark :
NIL
(viii). Email address :
aeekwbkarwar123@gmail.com
(ix). Landline Telephone No. :
8382-225516
(x). Fax No. :
8382-
(xi). Mobile No. :
9480813167
(xii). Website (if any) :
NIL
(xiii). Legal status of User Agency :
State Government
A-3.
Details of Person Making Application
(i). First Name:
Shivaram
(ii). Middle Name:
S
(iii). Last Name:
Naik
(iv). Gender:
Male
(v). Designation:
AEE
(vi). Address 1:
Office of Assistant executive Engineer, KUWSDB, karwar
(vii). Address 2:
NIL
(viii). State:
Karnataka
(ix). District:
Uttara Kannada
(x). Tehsil:
NIL
(xi). Pin:
581301
(xii). Landmark:
NIL
(xiii). Email Address:
aeekwbkarwar123@gmail.com
(xiv). Landline Telephone No.:
8382-225516
(xv). Fax No.:
NIL
(xvi). Mobile No.:
9480813167
(xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B.
Details of land required for the Project
B-1.
Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
Proposal Submitted in Past
S.no
Proposal Status.
Proposal No.
Moef File No.
Area Proposed for Diversion(Ha.)
Area Diverted(Ha.)
Date of In-Principle Approval
Date of Final Approval
1
Inprinciple
FP/KA/WATER/27276/2017
F.NO. 4-KRC/1234/2020-BAN
34.98
34.98
11 Dec 2020
Total
34.98
34.98
B-2.
Details of forest land proposed to be diverted
B-2.1
Details of Divisions involved
Details of Divisions involved
S.no
Division Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Honavar
10.91
5.16
2.
Karwar
24.07
12.74
Total
34.98
17.9
B-2.2
Details of Districts involved
District wise breakup
S.no
District Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Uttara Kannada
34.98
17.9
Total
34.98
17.9
B-2.3
Village wise breakup
Villages wise breakup
S.no
Village
Forest Land(ha.)
Non-Forest Land(ha.)
1
Agasur62- Div-Karwar
8.35
0
2
Agasur66- Div-Karwar
0
0.01
3
Agasur69- Div-Karwar
5.3
0
4
Agasur51/15- Div-Karwar
0
0.01
5
Agasur51/23- Div-Karwar
0
0.13
6
Agasur51/24- Div-Karwar
0
0.5
7
Agasur51/25- Div-Karwar
0
0.5
8
Agasur51/26- Div-Karwar
0
0.01
9
Agasur61/37- Div-Karwar
0
0.96
10
Agasur61/37P- Div-Karwar
0
0.01
11
Agasur64/10- Div-Karwar
0
1.01
12
Agasur64/11- Div-Karwar
0
0.92
13
Agasur64/12- Div-Karwar
0
0.74
14
Agasur64/13- Div-Karwar
0
0.44
15
Agasur64/14- Div-Karwar
0
0.51
16
Agasur64/15- Div-Karwar
0
0.96
17
Agasur64/16- Div-Karwar
0
0.39
18
Agasur64/17- Div-Karwar
0
0.54
19
Agasur64/18- Div-Karwar
0
0.54
20
Agasur64/2- Div-Karwar
0
0.09
21
Agasur64/3- Div-Karwar
0
0.22
22
Agasur64/4- Div-Karwar
0
0.83
23
Agasur64/7- Div-Karwar
0
0.39
24
Agasur64/8- Div-Karwar
0
2.16
25
Agasur68/1- Div-Karwar
0
0.25
26
Agasur68/2- Div-Karwar
0
0.35
27
Heggaramaakkigadde51P- Div-Karwar
0
0.29
28
Heggaramaakkigadde40- Div-Karwar
0.42
0
29
Heggaramaakkigadde52P- Div-Karwar
0
0.01
30
Kavalahalli13- Div-Honnavar
10.01
0
31
Gundabala92/5- Div-Honnavar
0
0.52
32
Gundabala98- Div-Honnavar
6.39
0
33
Gundabala92/1- Div-Honnavar
0
0.18
34
Gundabala92/4- Div-Honnavar
0
0.33
35
Gundabala93/4- Div-Honnavar
0
0.51
36
Gundabala93/2- Div-Honnavar
0
0.26
37
Gundabala93/3- Div-Honnavar
0
0.75
38
Gundabala92/3- Div-Honnavar
0
1.48
39
Gundabala93/5- Div-Honnavar
0
0.22
40
Gundabala91- Div-Honnavar
0.97
0
41
Gundabala92/2- Div-Honnavar
0
0.7
42
Hillur333/1- Div-Honnavar
0
0.04
43
Hillur333/4- Div-Honnavar
0
0.06
44
Hillur377- Div-Honnavar
0.54
0
45
Hillur330- Div-Honnavar
0
0.02
46
Hillur324- Div-Honnavar
2.85
0
47
Hillur379- Div-Honnavar
0
0.02
48
Hillur333/11- Div-Honnavar
0
0.04
49
Hillur357- Div-Honnavar
0.15
0
Total
34.98
17.9
B-2.4
Component wise breakup
Component wise breakup
S.no
Component
Forest Land(ha.)
Non-Forest Land(ha.)
1
Left Bank Abutment
0.68
0
2
Left Bank Submergence area
10.23
5.16
3
Approach road
0.61
0
4
Right Bank Abutment
0.68
0
5
Right Bank Submergence area
22.74
12.74
6
Storage shed
0.04
0
Total
34.98
17.9
C.
Maps of forest land proposed to be diverted
Division 1. : Honavar
(i). Area of forest land proposed to be diverted(in ha.) :
10.91
(ii). Nature of the Project:
Non Linear
(a). No. of patches :
Two
Patch wise details
Patch No.
Area of Patch(in ha.)
Kml File of Patches
To view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.
0.68
View File
2.
10.23
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
Division 2. : Karwar
(i). Area of forest land proposed to be diverted(in ha.) :
24.07
(ii). Nature of the Project:
Non Linear
(a). No. of patches :
Four
Patch wise details
Patch No.
Area of Patch(in ha.)
Kml File of Patches
To view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.
0.61
View File
2.
0.68
View File
3.
22.74
View File
4.
0.04
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D.
Justification for locating the Project in forest land and details of alternatives examined:
(i). Copy of note containing justification for locating the Project in forest land:
E.
Employment likely to be generated
(i). Whether the Project is likely to generate employment ?:
Yes
(ii). Permanent/Regular Employment(Number of persons):
100
(iii). Temporary Employment(Number of person-days):
3000
F.
Displacement of People due to the Project, if any
(i). Whether Project involves displacement?:
No
G.
Details of Cost-Benefit analysis for the Project
(i). Whether the Project requires Cost-Benefit analysis?:
Yes
(a). Copy of Cost-Benefit analysis:
H.
Status of Environmental Clearance
(i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? :
No
I.
Status of Wildelife Clearance
(i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? :
No
J.
Applicability of special provisions governing Scheduled Areas
(i).Whether the Project or a part thereof is located in a Scheduled Area? :
No
K.
Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
(i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? :
Yes
(a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L.
Details of land identified for Compensatory Afforestation
(i). Whether non-forest or Revenue forest land is required to be provided by User Agency?:
Yes
(ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?:
No
(iii). No. of districts involved for raising Compensatory Afforestation:
1
(iv). No. of patches:
Twelve
District 1. : Uttara Kannada
(a). Village:
Devakar
(b). Area(in ha.):
5.18
(c). Copy of KML file of the patch:
View File
(d). Khasra details:
45
(e). Present owner:
User Agency
(f). Copy of Ownership proof:
District 2. : Uttara Kannada
(a). Village:
Devakar
(b). Area(in ha.):
5.04
(c). Copy of KML file of the patch:
View File
(d). Khasra details:
40
(e). Present owner:
User Agency
(f). Copy of Ownership proof:
District 3. : Uttara Kannada
(a). Village:
Devakar
(b). Area(in ha.):
0.89
(c). Copy of KML file of the patch:
View File
(d). Khasra details:
109
(e). Present owner:
User Agency
(f). Copy of Ownership proof:
District 4. : Uttara Kannada
(a). Village:
Devakar
(b). Area(in ha.):
5.99
(c). Copy of KML file of the patch:
View File
(d). Khasra details:
15
(e). Present owner:
User Agency
(f). Copy of Ownership proof:
District 5. : Uttara Kannada
(a). Village:
Devakar
(b). Area(in ha.):
3.25
(c). Copy of KML file of the patch:
View File
(d). Khasra details:
14
(e). Present owner:
User Agency
(f). Copy of Ownership proof:
District 6. : Uttara Kannada
(a). Village:
Devakar
(b). Area(in ha.):
0.56
(c). Copy of KML file of the patch:
View File
(d). Khasra details:
31
(e). Present owner:
User Agency
(f). Copy of Ownership proof:
District 7. : Uttara Kannada
(a). Village:
Devakar
(b). Area(in ha.):
4.81
(c). Copy of KML file of the patch:
View File
(d). Khasra details:
39
(e). Present owner:
User Agency
(f). Copy of Ownership proof:
District 8. : Uttara Kannada
(a). Village:
Devakar
(b). Area(in ha.):
0.73
(c). Copy of KML file of the patch:
View File
(d). Khasra details:
38
(e). Present owner:
User Agency
(f). Copy of Ownership proof:
District 9. : Uttara Kannada
(a). Village:
Devakar
(b). Area(in ha.):
2.1
(c). Copy of KML file of the patch:
View File
(d). Khasra details:
32
(e). Present owner:
User Agency
(f). Copy of Ownership proof:
District 10. : Uttara Kannada
(a). Village:
Devakar
(b). Area(in ha.):
3.03
(c). Copy of KML file of the patch:
View File
(d). Khasra details:
41
(e). Present owner:
User Agency
(f). Copy of Ownership proof:
District 11. : Uttara Kannada
(a). Village:
Devakar
(b). Area(in ha.):
0.63
(c). Copy of KML file of the patch:
View File
(d). Khasra details:
108
(e). Present owner:
User Agency
(f). Copy of Ownership proof:
District 12. : Uttara Kannada
(a). Village:
Devakar
(b). Area(in ha.):
4.15
(c). Copy of KML file of the patch:
View File
(d). Khasra details:
28
(e). Present owner:
User Agency
(f). Copy of Ownership proof:
(v). Scanned copy of the map of the land identified for creation of Compensatory Afforestation prepared by using GPS ot Total Station:
(vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land identified for creation of Compensatory Afforestation:
Additional information Details
Documents
S.No
Documents
Remarks
1
Copy f administrative approval
2
CA Land DC letter
3
Undertaking letter
4
Agasur village Georeferenced map
5
Gundabala village Georeferenced map
6
Heggaramakkigadde village Georeferenced map
7
Hillur village Georeferenced map
8
Kavalahalli village Georeferenced map
9
Hebula village Georeferenced map
10
Note on Vented Barrage and abstract
11
CA Land area details
12
Proposed Forest GPS readings
13
Component wise Proposed area details
14
Survey number wise proposed vented barrage area details
15
CA Land GPS Readings
16
Proposal Acknowledge Copy of DC and DCF
17
Compliance to essential details sought by DCF, Karwar
18
No Data
Study Report of Fisheries Resources along Upstream & Downstream of River Gangavali
19
Study report of Plant Diversity of Gangavali river
Print