FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/KA/ROAD/7440/2014   (ii). Name of Project for which Forest Land is required : Approach Road to Ramgad Iron Ore mine (M.L.No.2547)   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : M/s. Zeenath Transport Co., Bellary, was granted mining lease to mine iron ore and Manganese over an extent of 50.00 Ha., (as per CEC joint survey 49.73 Ha.) in Ramagad (Ramanadurga range) Sandur Taluk, Bellary District, Karnataka State for a period of 30 years, after obtaining Forest Clearance.   (iv). State : Karnataka   (v). Category of the Proposal : Road   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 500   (viii). Area of forest land proposed for diversion(in ha.): 9.4   (ix). Non-forest land required for this project(in ha.): 0   (x). Total period for which the forest land is proposed to be diverted(in years): NIL
A-2. Details of User Agency
  (i). Name : ZEENATH TRANSPORT COMPANY   (ii). Address1 : Zeenath House, cowl Bazaar,Bellary   (iii). Address2 : NIL   (iv). State : Karnataka   (v). District : Bellary   (vi). Pin : 583102   (vii). Landmark : Naear Masizd   (viii). Email address : ztco2000@yahoo.com   (ix). Landline Telephone No. : 8392-240085   (x). Fax No. : NIL   (xi). Mobile No. : 9844085004   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : Others
A-3. Details of Person Making Application
  (i). First Name: Syed   (ii). Middle Name: NIL   (iii). Last Name: Ahmed   (iv). Gender: Male   (v). Designation: Gpa holder   (vi). Address 1: M.Ramalinga House no;1 km yusuff compound Near vijayanagar colony cantonment Bellary   (vii). Address 2: M.Ramalinga House no;1 km yusuff compound Near vijayanagar colony cantonment Bellary   (viii). State: Karnataka   (ix). District: Bellary   (x). Tehsil: Bellary   (xi). Pin: 583104   (xii). Landmark: Near vijayanagar colony   (xiii). Email Address: ztco2000@yahoo.com   (xiv). Landline Telephone No.: 8392-240085   (xv). Fax No.: 08392240462   (xvi). Mobile No.: 9844085004   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Bellary9.40
Total9.40
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Bellary9.40
Total9.40
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Ramgad9.40
Total 9.4 0
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Approach Road9.40
Total 9.4 0
C. Maps of forest land proposed to be diverted
Division 1. : Bellary
  (i). Area of forest land proposed to be diverted(in ha.) : 9.4   (ii). Nature of the Project: Linear   (b). No. of Segments : Two
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.8.58    View File
2.0.82    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: No   (a). Reason for not providing such map: This is a existing old approach road
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 100   (iii). Temporary Employment(Number of person-days): 500
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: Yes   (a). Copy of Cost-Benefit analysis:
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : Yes
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : No
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Yes   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii). No. of districts involved for raising Compensatory Afforestation: 1   (iv). No. of patches: Two
District 1. : Kolar
  (a). Village: Nagalapur   (b). Area(in ha.): 11.33   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 999   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
District 2. : Kolar
  (a). Village: Ammeranahalli   (b). Area(in ha.): 3.47   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 999   (e). Present owner: User Agency   (f). Copy of Ownership proof:
  (v). Scanned copy of the map of the land identified for creation of Compensatory Afforestation prepared by using GPS ot Total Station:   (vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land identified for creation of Compensatory Afforestation:
Additional information Details
Documents
S.No Documents
Remarks
1
2Memorandum Of understanding by ZTC & Vesco
3Village map Sy.No152(P1)
4Suitability Certificate of Sy.No.11 Naglapur village
5Suitability Certificate of Sy.No.152(P1) Ammerahalli village
6Reply to ACCF Letter Dated 08.04.2015
7DFo letter to Tashidar for C &D land Sy .no.11 of Nagalpur, change name in coloumn no.11 in RTC copy & transfer the land to Forest dept.-Reg
8EC Ammeranahalli