FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A.
General Details
A-1.
Project Details
(i). Proposal No. :
FP/KA/Others/17464/2016
(ii). Name of Project for which Forest Land is required :
Diversion of 235.648Ha. outside ML area of Donimalai at Donimalai Complex, in favour of the NMDC Limited
(iii). Short narrative of the proposal and Project/scheme for which the forest land is required :
Donimalai Iron ore Mine of NMDC Limited had submitted an application for diversion of 235.648 Ha of forest area including regularization of 96.87Ha utilized for infrastructure development and 136.778 Ha of inter locked forest areas outside ML (2396) area at Donimalai Complex
(iv). State :
Karnataka
(v). Category of the Proposal :
Others
(vi). Shape of forest land proposed to be diverted :
Hybrid
(vii). Estimated cost of the Project(Rupees in lacs) :
39131
(viii). Area of forest land proposed for diversion(in ha.):
235.648
(ix). Non-forest land required for this project(in ha.):
0
(x). Total period for which the forest land is proposed to be diverted(in years):
50
A-2.
Details of User Agency
(i). Name :
NMDC LIMITED DONIMALAI
(ii). Address1 :
Donimalai Township, Dist. Bellary Pin: 583 118 (Karnataka)
(iii). Address2 :
Donimalai Township, Dist. Bellary Pin: 583 118 (Karnataka)
(iv). State :
Karnataka
(v). District :
Bellary
(vi). Pin :
583118
(vii). Landmark :
Donimalai
(viii). Email address :
skverma@nmdc.co.in
(ix). Landline Telephone No. :
8395-274624
(x). Fax No. :
NIL
(xi). Mobile No. :
9449871000
(xii). Website (if any) :
NIL
(xiii). Legal status of User Agency :
Central PSU
A-3.
Details of Person Making Application
(i). First Name:
SANJEEV
(ii). Middle Name:
NIL
(iii). Last Name:
SAHI
(iv). Gender:
Male
(v). Designation:
GENERAL MANAGER
(vi). Address 1:
Donimalai Township, Dist. Bellary Pin: 583 118 (Karnataka)
(vii). Address 2:
Donimalai Township, Dist. Bellary Pin: 583 118 (Karnataka)
(viii). State:
Karnataka
(ix). District:
Bellary
(x). Tehsil:
Sandur
(xi). Pin:
583118
(xii). Landmark:
Donimalai
(xiii). Email Address:
envdiom@gmail.com
(xiv). Landline Telephone No.:
8395-274624
(xv). Fax No.:
08395274649
(xvi). Mobile No.:
9691162304
(xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B.
Details of land required for the Project
B-1.
Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no
Proposal Status.
Proposal No.
Moef File No.
Area Proposed for Diversion(Ha.)
Area Diverted(Ha.)
Date of In-Principle Approval
Date of Final Approval
NIL
B-2.
Details of forest land proposed to be diverted
B-2.1
Details of Divisions involved
Details of Divisions involved
S.no
Division Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Bellary
235.648
0
Total
235.648
0
B-2.2
Details of Districts involved
District wise breakup
S.no
District Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Bellary
235.648
0
Total
235.648
0
B-2.3
Village wise breakup
Villages wise breakup
S.no
Village
Forest Land(ha.)
Non-Forest Land(ha.)
1
Narsinghapura, Donimalai South Range
235.648
0
Total
235.648
0
B-2.4
Component wise breakup
Component wise breakup
S.no
Component
Forest Land(ha.)
Non-Forest Land(ha.)
1
Power Lines
10.49
0
2
Tunnel
0.57
0
3
Conveyor
2.74
0
4
Water Pipeline
0.85
0
5
Railway Line
0.39
0
6
Tailing Dam Area
43.69
0
7
Water Treatment Plant
2.57
0
8
Valley Store Area
3.42
0
9
Autogarage
2.32
0
10
Mechanical Office
2.97
0
11
Water Tank Area
5.17
0
12
Screening Plant Area
4.55
0
13
Borewell Area
0.33
0
14
Stock Yard
1.5
0
15
Control Room
0.15
0
16
Roads
15.16
0
17
Interlocked area between infrastructures
138.778
0
Total
235.648
0
C.
Maps of forest land proposed to be diverted
Division 1. : Bellary
(i). Area of forest land proposed to be diverted(in ha.) :
235.648
(ii). Nature of the Project:
Hybrid
(a). No. of patches :
Twelve
Patch wise details
Patch No.
Area of Patch(in ha.)
Kml File of Patches
To view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.
43.69
View File
2.
2.57
View File
3.
3.42
View File
4.
2.32
View File
5.
2.97
View File
6.
5.17
View File
7.
4.55
View File
8.
0.33
View File
9.
1.5
View File
10.
0.15
View File
11.
15.16
View File
12.
138.778
View File
(b). No. of Segments :
Five
Segment wise details
Segments
Segment Area(in ha.)
Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.
10.49
View File
2.
0.57
View File
3.
2.74
View File
4.
0.85
View File
5.
0.39
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D.
Justification for locating the Project in forest land and details of alternatives examined:
(i). Copy of note containing justification for locating the Project in forest land:
(ii). Whether a copy of map indicating location of alternative examine is required to be provided:
No
(a). Reason for not providing such map:
Already Infrastructure facilities was constructed
E.
Employment likely to be generated
(i). Whether the Project is likely to generate employment ?:
No
F.
Displacement of People due to the Project, if any
(i). Whether Project involves displacement?:
No
G.
Details of Cost-Benefit analysis for the Project
(i). Whether the Project requires Cost-Benefit analysis?:
Yes
(a). Copy of Cost-Benefit analysis:
H.
Status of Environmental Clearance
(i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? :
Yes
(a). Status of the Environmental Clearance to the Project:
EC obtained
(b). Environmental Clearance File No.:
J-11015/151/2008-IA.II(M)
(c). Copy of Environmental Clearance to the Project:
(d). Date of grant of Environmental Clearance to the Project:
2009-07-08
I.
Status of Wildelife Clearance
(i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? :
No
J.
Applicability of special provisions governing Scheduled Areas
(i).Whether the Project or a part thereof is located in a Scheduled Area? :
No
K.
Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
(i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? :
Yes
(a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
No Data
L.
Details of land identified for Compensatory Afforestation
(i). Whether non-forest or Revenue forest land is required to be provided by User Agency?:
Not Applicable
(ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?:
Not Applicable
(iii) . Reason for not providing Non-Forest Land:
Not Applicable
Additional information Details
Documents
S.No
Documents
Remarks
1
additional Information point no.3
2
Ecozone Map
3
FRA
4
Land Suitability
5
Proposed Regularization GPS readings in Degree Decimals.
6
Cover letter for submission of revised proposal (235.648Ha.)
7
Undertaking for CA charges for proposed area.
8
Undertaking for NPV & Addl NPV charges for proposed area.
9
Undertaking for stock yard and Screening Plant.
10
Undertaking for forest area interlocked between the infrastructures
11
Undertaking for minimum forest area utilization.
12
DIOM FC copy.
13
10Km radius map from the proposed area.
14
Mine plan approval copy.
15
Revised Justification of the porposal.
16
Cost benefit analysis for proposal.
17
Addl. CA 197.608Ha Google Map
18
Addl. CA 197.608Ha Village Map
19
Letter to DCF against clarification on 04.07.2022
20
Google map of CA land for proposed area (235.648Ha.)
21
Village map of CA land for proposed area (235.648Ha.)
22
Reply letter with relevant annexures against the EDS raised by MoEF dated.17.12.2022.
Print