FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/JK/ROAD/51130/2020   (ii). Name of Project for which Forest Land is required : Construction of Motorable Road Ikhala Block Boundary Kishtwar to Lopara Road part -II   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : The proposed Sub Road Project Ikhala Block Boundary Kishtwar to lopara is aimed to connect the Nowapachi Marwah the H.Q of Sub Division Marwah benefiting thereby a population of more than 30000 which is still un-connected by the all weather road to its District H.Q /Rest of the UT of J&k since the   (iv). State : Jammu and Kashmir   (v). Category of the Proposal : Road   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 4294   (viii). Area of forest land proposed for diversion(in ha.): 5.9312   (ix). Non-forest land required for this project(in ha.): 21.3   (x). Total period for which the forest land is proposed to be diverted(in years): 100
A-2. Details of User Agency
  (i). Name : CHIEF ENGINEER PMGSY (JKRRDA) JAMMU   (ii). Address1 : Office of the Chief Engineer PMGSY (JKRRDA) Jammu 4th Floor JKPCC Complex Panama Chowk Jammu   (iii). Address2 : JAmmu   (iv). State : Jammu and Kashmir   (v). District : Jammu   (vi). Pin : 180001   (vii). Landmark : Panama Chowk Jammu   (viii). Email address : klthakur18@gmail.com   (ix). Landline Telephone No. : 0-   (x). Fax No. : 0-   (xi). Mobile No. : 7051295951   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: Mohd   (ii). Middle Name: Aslam   (iii). Last Name: Lone   (iv). Gender: Male   (v). Designation: Executive Engineer   (vi). Address 1: PMGSY Division PIU   (vii). Address 2: Marwah   (viii). State: Jammu and Kashmir   (ix). District: Kishtwar   (x). Tehsil: marwah   (xi). Pin: 182205   (xii). Landmark: NIL   (xiii). Email Address: klthakur18@gmail.com   (xiv). Landline Telephone No.: 0-   (xv). Fax No.: NIL   (xvi). Mobile No.: 7051295951   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Marwah Forest Division5.931221.3
Total5.931221.3
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Kishtwar5.931221.3
Total5.931221.3
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Lopara4.6117.04
2Dherna Hanzal1.32124.26
Total 5.9312 21.3
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1KM 32/00- RD 54/00018.4079
204 Nos Dumping Sites in non- forest Land00.1141
306 Nos Dumping Sites in forest Land0.17120
4RD 54/000 - RD 54/07500.045
5RD 54/075- RD 54/2000.0750
6RD 54/200-RD54/40000.12
7RD 54/400- RD 55/3250.5550
8RD 55/325 - RD 55/5250.120
9RD 55/525-RD 55/57500.03
10RD 55/575 - RD 56/9500.8250
11RD 56/950- RD 57/10000.09
12RD 57/100 -RD 57/8500.450
13RD 57/850 -RD 58/02500.105
14RD 58/025- RD 59/6250.960
15RD 59/625- RD 59/72500.06
16RD 59/725- RD 61/7751.230.738
17RD 61/775- RD 61/97500.12
18RD 61/975- RD 64/5501.5450
19RD 64/550 -RD 67/00001.47
Total 5.9312 21.3
C. Maps of forest land proposed to be diverted
Division 1. : Marwah Forest Division
  (i). Area of forest land proposed to be diverted(in ha.) : 5.9312   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.5.9312    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: No   (a). Reason for not providing such map: There is no alternate option
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 0   (iii). Temporary Employment(Number of person-days): 299756
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: Yes   (a). Copy of Cost-Benefit analysis:
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: No   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii) . Reason for not providing Non-Forest Land: Others
Additional information Details
Documents
S.No Documents
Remarks
1Detailed Project Report Ikhala Block Boundary Kishtwar to Lopara
2The evaluation process is still awaited on your part due to which this office is not in a position to clear the additional EDS showing on part of the user Agency instead of yours
3joint inspection stand completed and same was communicated to you vide the attachment letter enclosed
4Administrative Approval of The Project
5Technical Sanction of Project of The Project
6Revised FRA Report Issued by District Magistrate Kishtwar
7Technical Feasibility report regarding no alternate alignment is possible other than this
8minutes of meeting with District Magistrate kishtwar
9engineering measures for stabilization of muck dumping in forest land
10copy of authenticated geo refrence map
11copy of authenticated DGPS map
12copy of authenticated Toposheet
13copy of authenticated layout plan
14Undertaking CA
15A complete plan for habitat improvement and types ,Nos of Structures involved in animal passage plan along with the cost estimates duly vetted by CWLW
16opy of Feasibility report along with comparative statement of alignments on both sides of the marsudhar river including all kind of cost estimates and complete DPR