FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/JK/ROAD/146187/2021   (ii). Name of Project for which Forest Land is required : Construction and Upgradation to 2 lane with paved Shoulder of road from design Chainage 31.449 (Khellani, Pariyot) to Km 51.700 (Prem Nagar) (Design length 20.251 Km.) in the Union territory of Jammu and Kashmir Package-1 of NH-24   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : The project envisages construction of 2 Lane with paved shoulder NH configuration of 20.251 Km. from Km. 31.449 to Km. 51.700 of NH-244. This package of NH-244 is a part of the strategic road between Jammu and Kashmir Division.   (iv). State : Jammu and Kashmir   (v). Category of the Proposal : Road   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 48645   (viii). Area of forest land proposed for diversion(in ha.): 3.2549356   (ix). Non-forest land required for this project(in ha.): 53.6383044   (x). Total period for which the forest land is proposed to be diverted(in years): 99
A-2. Details of User Agency
  (i). Name : NHIDCL PMU DODA   (ii). Address1 : Chenab View Hotel, Near Indian Oil petrol Pump, Doda -City, District-Doda   (iii). Address2 : NIL   (iv). State : Jammu and Kashmir   (v). District : Doda   (vi). Pin : 182202   (vii). Landmark : Indian Oil Petrol pump Near Khan Plaza Hotel   (viii). Email address : pmunhidcldoda@gmail.com   (ix). Landline Telephone No. : 0-   (x). Fax No. : 0-   (xi). Mobile No. : 9818941494   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : Central PSU
A-3. Details of Person Making Application
  (i). First Name: Naginder   (ii). Middle Name: Singh   (iii). Last Name: Gill   (iv). Gender: Male   (v). Designation: General Manager Project   (vi). Address 1: Chenab View Hotel, Near Indian Oil Petrol Pump, Doda City, Dist-Doda   (vii). Address 2: NIL   (viii). State: Jammu and Kashmir   (ix). District: Doda   (x). Tehsil: Doda   (xi). Pin: 182202   (xii). Landmark: Near Indian Oil Petrol Pump, Doda   (xiii). Email Address: pmunhidcldoda@gmail.com   (xiv). Landline Telephone No.: 0-   (xv). Fax No.: NIL   (xvi). Mobile No.: 9663539977   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Bhaderwah Forest Division3.254935653.6383044
Total3.254935653.6383044
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Doda3.254935653.6383044
Total3.254935653.6383044
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Shaja0.0932653.32365
2Sohanda0.0689373.944
3Thalela0.6557873.22722
4Malhori00.10216
5Shaerna Kalan01.94881
6Saras00.13284
7Jangalwa0.5912285.76112
8Bhadra0.0251952.23083
9Kehlote0.0202343.11431
10Balasu00.35535
11Bhela010.51624
12Daron Kerani01.36779
13Hamirpur01.52769
14Haneja02.14972
15Hud00.00144
16Shibnot08.234594
17Paryote1.80028965.70054
Total 3.2549356 53.638304
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Road and protection Works3.254935645.4083
2Wayside Amenities, Road Furniture, Muck disposal08.230004
Total 3.2549356 53.638304
C. Maps of forest land proposed to be diverted
Division 1. : Bhaderwah Forest Division
  (i). Area of forest land proposed to be diverted(in ha.) : 3.2549356   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.3.2549356    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 300   (iii). Temporary Employment(Number of person-days): 500
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Not Applicable   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Not Applicable   (iii) . Reason for not providing Non-Forest Land: Not Applicable
Additional information Details
Documents
S.No Documents
Remarks
1Certificate for min use of forest land
2Google alignment of the project
3Justification for locating project in forest land
4Technical schedule of DPR
5Alternate alignment report
6DPR design report
7Administrative approval and financial sanction of project
8Land details of forest and non forest land in the alignment
9Executive summary of project
103A Gazette notification of Khellani Chatroo
11DPR Main Report
12Justification for permanent employment
13Letter to Nodal office for reply of EDS
14FRA Certificate to DC-DOda
15Project Layout Plan Package-1-NH-244
16Topo-Sheet Map Package-1-NH-244
17Letter to DFO Badherwah for compliance of EDS raised by SG.
18Geo referenced Map
19letter to DFO Badhwerwah for EDS compliance raised by Nodal officer on 02-12-2021
20Verified Muck disposal Plan along with undertaking
21Revised Undertaking of NPV
22Revised Undertaking of CA
23Joint Inspection Report
24UA Letter to DFO for compliance of EDS by IRO Jammu dated 17.01.2022