FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A.
General Details
A-1.
Project Details
(i). Proposal No. :
FP/JK/ROAD/146187/2021
(ii). Name of Project for which Forest Land is required :
Construction and Upgradation to 2 lane with paved Shoulder of road from design Chainage 31.449 (Khellani, Pariyot) to Km 51.700 (Prem Nagar) (Design length 20.251 Km.) in the Union territory of Jammu and Kashmir Package-1 of NH-24
(iii). Short narrative of the proposal and Project/scheme for which the forest land is required :
The project envisages construction of 2 Lane with paved shoulder NH configuration of 20.251 Km. from Km. 31.449 to Km. 51.700 of NH-244. This package of NH-244 is a part of the strategic road between Jammu and Kashmir Division.
(iv). State :
Jammu and Kashmir
(v). Category of the Proposal :
Road
(vi). Shape of forest land proposed to be diverted :
Linear
(vii). Estimated cost of the Project(Rupees in lacs) :
48645
(viii). Area of forest land proposed for diversion(in ha.):
3.2549356
(ix). Non-forest land required for this project(in ha.):
53.6383044
(x). Total period for which the forest land is proposed to be diverted(in years):
99
A-2.
Details of User Agency
(i). Name :
NHIDCL PMU DODA
(ii). Address1 :
Chenab View Hotel, Near Indian Oil petrol Pump, Doda -City, District-Doda
(iii). Address2 :
NIL
(iv). State :
Jammu and Kashmir
(v). District :
Doda
(vi). Pin :
182202
(vii). Landmark :
Indian Oil Petrol pump Near Khan Plaza Hotel
(viii). Email address :
pmunhidcldoda@gmail.com
(ix). Landline Telephone No. :
0-
(x). Fax No. :
0-
(xi). Mobile No. :
9818941494
(xii). Website (if any) :
NIL
(xiii). Legal status of User Agency :
Central PSU
A-3.
Details of Person Making Application
(i). First Name:
Naginder
(ii). Middle Name:
Singh
(iii). Last Name:
Gill
(iv). Gender:
Male
(v). Designation:
General Manager Project
(vi). Address 1:
Chenab View Hotel, Near Indian Oil Petrol Pump, Doda City, Dist-Doda
(vii). Address 2:
NIL
(viii). State:
Jammu and Kashmir
(ix). District:
Doda
(x). Tehsil:
Doda
(xi). Pin:
182202
(xii). Landmark:
Near Indian Oil Petrol Pump, Doda
(xiii). Email Address:
pmunhidcldoda@gmail.com
(xiv). Landline Telephone No.:
0-
(xv). Fax No.:
NIL
(xvi). Mobile No.:
9663539977
(xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B.
Details of land required for the Project
B-1.
Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no
Proposal Status.
Proposal No.
Moef File No.
Area Proposed for Diversion(Ha.)
Area Diverted(Ha.)
Date of In-Principle Approval
Date of Final Approval
NIL
B-2.
Details of forest land proposed to be diverted
B-2.1
Details of Divisions involved
Details of Divisions involved
S.no
Division Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Bhaderwah Forest Division
3.2549356
53.6383044
Total
3.2549356
53.6383044
B-2.2
Details of Districts involved
District wise breakup
S.no
District Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Doda
3.2549356
53.6383044
Total
3.2549356
53.6383044
B-2.3
Village wise breakup
Villages wise breakup
S.no
Village
Forest Land(ha.)
Non-Forest Land(ha.)
1
Shaja
0.093265
3.32365
2
Sohanda
0.068937
3.944
3
Thalela
0.655787
3.22722
4
Malhori
0
0.10216
5
Shaerna Kalan
0
1.94881
6
Saras
0
0.13284
7
Jangalwa
0.591228
5.76112
8
Bhadra
0.025195
2.23083
9
Kehlote
0.020234
3.11431
10
Balasu
0
0.35535
11
Bhela
0
10.51624
12
Daron Kerani
0
1.36779
13
Hamirpur
0
1.52769
14
Haneja
0
2.14972
15
Hud
0
0.00144
16
Shibnot
0
8.234594
17
Paryote
1.8002896
5.70054
Total
3.2549356
53.638304
B-2.4
Component wise breakup
Component wise breakup
S.no
Component
Forest Land(ha.)
Non-Forest Land(ha.)
1
Road and protection Works
3.2549356
45.4083
2
Wayside Amenities, Road Furniture, Muck disposal
0
8.230004
Total
3.2549356
53.638304
C.
Maps of forest land proposed to be diverted
Division 1. : Bhaderwah Forest Division
(i). Area of forest land proposed to be diverted(in ha.) :
3.2549356
(ii). Nature of the Project:
Linear
(b). No. of Segments :
One
Segment wise details
Segments
Segment Area(in ha.)
Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.
3.2549356
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D.
Justification for locating the Project in forest land and details of alternatives examined:
(i). Copy of note containing justification for locating the Project in forest land:
(ii). Whether a copy of map indicating location of alternative examine is required to be provided:
Yes
(a). Copy of map indicating location of alternative examined:
E.
Employment likely to be generated
(i). Whether the Project is likely to generate employment ?:
Yes
(ii). Permanent/Regular Employment(Number of persons):
300
(iii). Temporary Employment(Number of person-days):
500
F.
Displacement of People due to the Project, if any
(i). Whether Project involves displacement?:
No
G.
Details of Cost-Benefit analysis for the Project
(i). Whether the Project requires Cost-Benefit analysis?:
No
H.
Status of Environmental Clearance
(i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? :
No
I.
Status of Wildelife Clearance
(i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? :
No
J.
Applicability of special provisions governing Scheduled Areas
(i).Whether the Project or a part thereof is located in a Scheduled Area? :
No
K.
Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
(i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? :
Yes
(a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L.
Details of land identified for Compensatory Afforestation
(i). Whether non-forest or Revenue forest land is required to be provided by User Agency?:
Not Applicable
(ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?:
Not Applicable
(iii) . Reason for not providing Non-Forest Land:
Not Applicable
Additional information Details
Documents
S.No
Documents
Remarks
1
Certificate for min use of forest land
2
Google alignment of the project
3
Justification for locating project in forest land
4
Technical schedule of DPR
5
Alternate alignment report
6
DPR design report
7
Administrative approval and financial sanction of project
8
Land details of forest and non forest land in the alignment
9
Executive summary of project
10
3A Gazette notification of Khellani Chatroo
11
DPR Main Report
12
Justification for permanent employment
13
Letter to Nodal office for reply of EDS
14
FRA Certificate to DC-DOda
15
Project Layout Plan Package-1-NH-244
16
Topo-Sheet Map Package-1-NH-244
17
Letter to DFO Badherwah for compliance of EDS raised by SG.
18
Geo referenced Map
19
letter to DFO Badhwerwah for EDS compliance raised by Nodal officer on 02-12-2021
20
Verified Muck disposal Plan along with undertaking
21
Revised Undertaking of NPV
22
Revised Undertaking of CA
23
Joint Inspection Report
24
UA Letter to DFO for compliance of EDS by IRO Jammu dated 17.01.2022
Print