FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/JH/MIN/59823/2020   (ii). Name of Project for which Forest Land is required : Pachwara South Coal Mine Project.   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Pachwara South Coal Block was allotted to Neyveli Uttar Pradesh Power Ltd. (NUPPL)- a joint venture of NLC India Limited and Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited vide, allotment order no 13016/26/2004-CA-I/CA-III(Pt) (Vol.II), Dated 03.10.2016 from MoC, GOI.   (iv). State : Jharkhand   (v). Category of the Proposal : Mining   (vi). Shape of forest land proposed to be diverted : Non Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 179501   (viii). Area of forest land proposed for diversion(in ha.): 455.1108   (ix). Non-forest land required for this project(in ha.): 259.7445   (x). Total period for which the forest land is proposed to be diverted(in years): 38
A-2. Details of User Agency
  (i). Name : NEYVELI UTTAR PRADESH POWER LIMITED   (ii). Address1 : SHANTA BHAVAN, BEHIND SBI, LIC COLONY   (iii). Address2 : NIL   (iv). State : Jharkhand   (v). District : Dumka   (vi). Pin : 814101   (vii). Landmark : SBI LIC Colony Branch   (viii). Email address : pachwara.south@nlcindia.in   (ix). Landline Telephone No. : 6434-236126   (x). Fax No. : 6434-   (xi). Mobile No. : 9489779571   (xii). Website (if any) : www.nlcindia.com   (xiii). Legal status of User Agency : Central PSU
A-3. Details of Person Making Application
  (i). First Name: MOHAN   (ii). Middle Name: NIL   (iii). Last Name: REDDY K   (iv). Gender: Male   (v). Designation: CEO   (vi). Address 1: 6/42, VIPUL KHAND, GOMTI NAGAR   (vii). Address 2: NIL   (viii). State: Uttar Pradesh   (ix). District: Lucknow   (x). Tehsil: Lucknow   (xi). Pin: 226010   (xii). Landmark: VIPUL KHAND, GOMTI NAGAR   (xiii). Email Address: pachwara.south@nlcindia.in   (xiv). Landline Telephone No.: 522-4951065   (xv). Fax No.: NIL   (xvi). Mobile No.: 9488996781   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Dumka455.1108259.7445
Total455.1108259.7445
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Dumka455.1108259.7445
Total455.1108259.7445
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Chirudih107.736698.5888
2Kundapahari232.3204143.3267
3Mahuldabar115.053817.829
Total 455.1108 259.7445
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Excavated Area447.3308196.4292
2Topsoil Dump06.53
3safety zone7.783.06
4Haul road within quarry017.13
5Road Diversion03.31
6settling pond00.04
7Road and infrastructure area0018.47
8Garland drain04.89
9Embankment03.56
10Green belt03.06
11Undisturbed Area03.2653
Total 455.1108 259.7445
C. Maps of forest land proposed to be diverted
Division 1. : Dumka
  (i). Area of forest land proposed to be diverted(in ha.) : 455.1108   (ii). Nature of the Project: Non Linear   (a). No. of patches : Eight
Patch wise details
Patch No. Area of Patch(in ha.) Kml File of PatchesTo view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.11.567    View File
2.1.6356    View File
3.32.7481    View File
4.61.7859    View File
5.77.9706    View File
6.154.3498    View File
7.0.0484    View File
8.115.0054    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 1288   (iii). Temporary Employment(Number of person-days): 3000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: Yes   (a). Total Number of families : 314   (b). Number of Scheduled Caste families : NIL   (c). Number of Schedule Tribes families : 298   (d). Number of other families : 16   (ii). Copy of Rehabilitation and Resettlement Plan:   (a). Copy of approval to Ministry of Tribal Affairs,Government of India to Rehabilitation and Resettlement:
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: Yes   (a). Copy of Cost-Benefit analysis:
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : Yes   (a). Status of the Environmental Clearance to the Project: EC under process   (ii). Environmental Clearance File No.: IA-J-11015/18/2020-IA-II(M)
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : Yes
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : No
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Not Applicable   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Not Applicable   (iii) . Reason for not providing Non-Forest Land: Not Applicable
M. Mining Details
M-1. Details of Mineral Concessions
  (i). Whether the forest land is aquired under Coal Bearing Areas Act: Yes   (a). Total area of the mining lease(in ha.): 714.8553   (b). Area of forest land located in the mining lease(in ha.): 455.1108
M-2. Details of Mining Plan
  (i). Date of approval of mining plan: 11 Nov 2020   (ii). Approval authority: Ministry of Coal, Government of India   (iii). Copy of approval of mining plan:   (iv). Copy of approved mining plan:   (v). Nature of mining (underground/opencast): Opencast   (vi). Copy of the detailed land use plan in 1:4,000 scale prepared by using GPS or Total Station :   (vii). Copy of map of the outer boundary of mining lease area:     View file
M-3. Details of prospecting undertaken to assess mineral reserves
  (i). Whether detailed prospecting to assess mineral reserve in the lease has been undertaken: Yes
prospecting undertaken to assess mineral reserves
S.no Designation of authority responsible
for grant of the original propecting license
Date of grant of prospecting licence Period of validity of extension prospecting licence From date Period of validity of extension prospecting licence To date Copy of prospecting licence
1MoEF&CC, Ranchi23 Jul 201910 Aug 201909 Aug 2021
M-4. Details of extension (if any) of original prospecting licence issued in the past
  (i). Whether detailed prospecting to assess mineral reserve in the lease has been undertaken: No
M-5. Brief details of prospecting activities undertaken in the mining lease :
  (i). Detail of prospecting activity under taken in the mining lease: Detail exploration in the block has been carried out since 1987. Altogether 69 numbers of coring boreholes were drilled and considered for preparation of the Geological Report. Drillhole spacing found
M-5.1 Details of bore holes drilled for prospecting :
Bore holes drilled for prospecting
S.no No. of Bore holes (in forest land) Diameters(in inch.) forest land No. of Bore holes (in non-forest land) Diameters(in inch.) non-forest land
1154544
M-5.2 Estimated Reserve along with accuracy and confidence level
Estimated Reserve along with accuracy and confidence level
Minerals Estimated Reserve
(million tones)
% accuracy (+ -) % confidence level Estimated Reserve
(million tones)
% accuracy (+ -) % confidence level
Coal and Lignite174.439080199.099080
M-6. Details of approval under the Forest (Consevation) Act,1980 obtained for undertaking prospecting activities in the forest land located in the mining lease
  (i).Whether approval under the Forest (Conservation) Act, 1980 for undertaking prospecting activities in the forest land located in the mining lease have been obtained Yes
Details of approval under the Forest(Consevation) Act,1980
S.no MoEF File No Date of approval Area of forest land diverted(in ha.) From Date To Date
1FP/JH/MRL/18/2015/330423 Jul 20191.61262510 Aug 201909 Aug 2021
M-7. Mineral wise details
  (i). No. of minerals: One
Mineral wise details
Minerals Estimated reserve in
non forest land(million tons.)
Estimated reserve
in forest land(million tons.)
Estimated annual
extraction(million tons.)
Estimated life
of mine(Yrs.)
Total estimated extraction during
mining lease period(million tons.)
Estimated mineral reserve
at the end of mining lease(million tons.)
Coal and Lignite199.09174.4313.538262.840
M-7.1 Proposed use of the minerals proposed to be raised from the mining lease
  (i). Proposed use of the minerals proposed to be raised from the mining lease: Captive   (a).Copy note containing details of the linked end-use Project:   (ii).Copy note containing details of the plan for the transportation of the minerals proposed to be raised from the mining lease:
Additional information Details
Documents
S.No Documents
Remarks
1Undertaking to bear cost of land for compensatory afforestation
2ToR Approval Letter
3Declaration regarding CA land
4Undertaking regarding CA Cost
5PCCF letter and correspondence regarding identification of CA Land
6Undertaking regarding cost of fencing of safety zone area and afforestation
7Undertaking regarding cost of NPV
8Undertaking regarding FRA
9Undertaking regarding NPV
10Mine Plan Approval Letter
11Undertaking regarding SIA study
12Copy of Authenticated land schedule
13EDS reply letter and compliance
14Signed copy of note containing detail plan for coal transportation
15Signed copy of note containing detail of linked project
16Copy of approved Mine plan is re-uploaded
17Undertaking-approval of Ministry of Tribal Affairs shall be obtained
18Allotment order
19georeferenced cadastral plan
20forest patches on toposheet
21Approval letter for prospecting
22Undertaking for tree felling
23cost benefit analysis
24signed justification note
25signed Geo referred map for revised Forest area (455.1108 Ha)
26Topo Map for Forest patches
27EDS reply submission on 16.04.2022
28EDS reply submission on 01.04.2022
29Reply to EDS dated 09.05.2022 is duly submitted
30Point wise reply of EDS dated 23.07.2022
31Annexure-2 of ADS Reply on 9 5 23
32ADS Reply Submission Letter on 9 5 23
33ADS Annexure 1A on 9 5 23
34ADS Annexure 4 on 9 5 23
35ADS Annexure 6 on 9 5 23
36ADS Annexure 7 on 9 5 23
37ADS Annexure 8 on 9 5 23
38ADS Annexure 9 on 9 5 23
39ADS Annexure 10 on 9 5 23
40FAC EDS COMPLIANCE REPLY DATED 09.11.2023
41EDS COMPLIANCE DATED 08.03.2024
42The correction have been made as per the instruction received. EDS Compliance dt 24.04.2024 with Annexures.pdf
43COMPLIANCE OF EDS RAISED BY MOEF &CC, COMUNICATED THROUGH DFO, DUMKA LETTER NO 1639 DATED 15.07.2024