FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/JH/ENCRH/42933/2019   (ii). Name of Project for which Forest Land is required : SHRI BALAJI INDUSTRIAL ENGINNERING LTD   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : M/s Shri Balaji Industrial Engineering Ltd i.e M/s Balaji Industrial Products Limited is an existing company incorporated on 21.11.83 in the name of Balaji Enterprises Pvt. Ltd. with the Registrar of Companies. Jaipur with an object to manufacture S.S Billets & Castings. The company was subsequentl   (iv). State : Jharkhand   (v). Category of the Proposal : Encroachments   (vi). Shape of forest land proposed to be diverted : Non Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 7500   (viii). Area of forest land proposed for diversion(in ha.): 1.66   (ix). Non-forest land required for this project(in ha.): 5.07   (x). Total period for which the forest land is proposed to be diverted(in years): 99
A-2. Details of User Agency
  (i). Name : SHRI BALAJI INDUSTRIAL ENGINEERING LIMITED   (ii). Address1 : Basti Road, Barajamda, Dist- West Singhbhum   (iii). Address2 : Jharkhand   (iv). State : Jharkhand   (v). District : Pashchimi Singhbhum   (vi). Pin : 833221   (vii). Landmark : Near Temple   (viii). Email address : kumararunranchi2019@gmail.com   (ix). Landline Telephone No. : 6586-262241   (x). Fax No. : 6586-   (xi). Mobile No. : 9830481445   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : Private
A-3. Details of Person Making Application
  (i). First Name: arun   (ii). Middle Name: NIL   (iii). Last Name: kumar   (iv). Gender: Male   (v). Designation: Liasion officer   (vi). Address 1: Bast Road, Barajamda, Dt-West Singhbhum   (vii). Address 2: Jharkhand   (viii). State: Jharkhand   (ix). District: Pashchimi Singhbhum   (x). Tehsil: Noamundi   (xi). Pin: 833221   (xii). Landmark: Nr Temple   (xiii). Email Address: kumararunranchi2019@gmail.com   (xiv). Landline Telephone No.: 6586-262241   (xv). Fax No.: NIL   (xvi). Mobile No.: 8210446252   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Chaibasa1.665.07
Total1.665.07
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Pashchimi Singhbhum1.665.07
Total1.665.07
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Badajamda1.665.07
Total 1.66 5.07
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1coal shed0.1440.119
2coal dump0.0560.025
3Central room and klin0.0650.589
4ore dump0.2460.369
5product shed PH and Bin0.0120.186
6bunker ramp and screen0.0730.041
7transfer house and hopper0.0230.033
8godown0.0110.01
9coal crusher and ground bunker00.099
10chimney and ESP00.06
11water tank00.075
12Back filter and gas plant0.0040.006
13washing plant and filter press00.131
14house and workshop00.063
15quarter00.044
16sponge shed00.033
17office weight bridge and security room0.0090.036
18oil tank00.005
19charcoal dump00.021
20existing road within total area boundary00.066
21area left for plantation1.0173.059
Total 1.66 5.07
C. Maps of forest land proposed to be diverted
Division 1. : Chaibasa
  (i). Area of forest land proposed to be diverted(in ha.) : 1.66   (ii). Nature of the Project: Non Linear   (a). No. of patches : One
Patch wise details
Patch No. Area of Patch(in ha.) Kml File of PatchesTo view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.1.66    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 130   (iii). Temporary Employment(Number of person-days): 6000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: Yes   (a). Copy of Cost-Benefit analysis:
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : Yes
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : No
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Yes   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii). No. of districts involved for raising Compensatory Afforestation: 1   (iv). No. of patches: One
District 1. : Giridih
  (a). Village: Semarkodi   (b). Area(in ha.): 1.66   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 51,52, 53,56, 58   (e). Present owner: User Agency   (f). Copy of Ownership proof:
District 2. : Giridih
  (a). Village: Karmatand   (b). Area(in ha.): 2.03   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 148,149,152,153,154   (e). Present owner: User Agency   (f). Copy of Ownership proof:
  (v). Scanned copy of the map of the land identified for creation of Compensatory Afforestation prepared by using GPS ot Total Station:   (vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land identified for creation of Compensatory Afforestation:
Additional information Details
Documents
S.No Documents
Remarks
1Village Map showing CA land is attached herewith
2Compliance of EDS dated 30.12.2019 is attached herewith
3Applied Area plan is attached herewith
4Existing land use Plan is attached herewith
5Village map of applied forest area is attached herewith
6Authenticated Land Schedule from CO is attached herewith
7Existing land use Break Up is attached herewith
8Forest & Non Forest land Break Up is attached herewith
9Compliance of EDS vide letter no 339 dated 26.02.2022 is attached herewith
10CA land Suitability Certificate is attached herewith
11CA Scheme from DFO Giridih is attached herewith
12Compliance of EDS dated 16032022 is attached herewith
13Undertaking for providing fresh CA land if found encroached is attached herewith
14Filled Checklist with its supporting documents is attached herewith
15Compliance of EDS dated 27042022 for index of Check list is attached herewith
16Compliance of EDS dated 30042022 is done and the CA Land in Giridih Dist is mentioned.
17Ref to EDS dated 28.09.2022, please find attached herewith the compliance
18Georeferenced digital Plan of CA land of 2.03 Ha is attached herewith
19Toposheet showing the location of CA land of 2.03 Ha is attached herewith
20Compliance of EDS submitted herewith
21CA land Purchase DEED doc of 2.03 Ha 21062024
22Reference to EDS dated 27.06.2024, we uploaded suitability certificate issued by DFO Giridih with CA scheme in modified PDF format.
23Sir, Refer to the EDS letter no 576 date 07.04.2025 issued by this office dated 11.04.2025, we are herewith uploaded its reply for kind information
24Sir, Refer to EDS dated 07042025, we are herewith uploading its reply for kind information