FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/HP/ROAD/48987/2020   (ii). Name of Project for which Forest Land is required : C/O CHILLON TO CHOWKIMRIGWAL ROAD KM 0/00 TO 8/00   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : The C/o CHILLON TO CHOWKI MRIGWAL ROAD KM 0/00 TO 8/00 bifurcate from Laldhang Paonta Ronhat Rohru(NH-707) at RD 23/00. The total length of the road is 8.00 KM, which will connect village namely Tikker, Kuner, Kakvadi, Bag and Chowki mrigwal. At present there is no link road to these villages excep   (iv). State : Himachal Pradesh   (v). Category of the Proposal : Road   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 1200   (viii). Area of forest land proposed for diversion(in ha.): 1.92   (ix). Non-forest land required for this project(in ha.): 2.88   (x). Total period for which the forest land is proposed to be diverted(in years): 99
A-2. Details of User Agency
  (i). Name : HIMACHAL PRADESH PUBLIC WORK DEPARTMENT   (ii). Address1 : Engineer-in-Chief HPPWD Nirman Bhawan Nigam Vihar Shimla   (iii). Address2 : Engineer-in-Chief HPPWD Nirman Bhawan Nigam Vihar Shimla   (iv). State : Himachal Pradesh   (v). District : Shimla   (vi). Pin : 171002   (vii). Landmark : Near Police Head Quarter   (viii). Email address : pwd-hp@nic.in   (ix). Landline Telephone No. : 177-2621401   (x). Fax No. : 177-177   (xi). Mobile No. : 9418003060   (xii). Website (if any) : www.hppwd.gov.in   (xiii). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: PRAMOD   (ii). Middle Name: KUMAR   (iii). Last Name: UPRETI   (iv). Gender: Male   (v). Designation: Executive Engineer   (vi). Address 1: HPPWD Shillai Division (B&R)   (vii). Address 2: NIL   (viii). State: Himachal Pradesh   (ix). District: Sirmaur   (x). Tehsil: Shillai   (xi). Pin: 173027   (xii). Landmark: NIL   (xiii). Email Address: ee-shi-hp@nic.in   (xiv). Landline Telephone No.: 1704-278524   (xv). Fax No.: NIL   (xvi). Mobile No.: 9418483712   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Renukaji1.922.88
Total1.922.88
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Sirmaur1.922.88
Total1.922.88
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Chowki mrigwal1.922.88
Total 1.92 2.88
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1DUMPING0.160
2ROAD1.762.88
Total 1.92 2.88
C. Maps of forest land proposed to be diverted
Division 1. : Renukaji
  (i). Area of forest land proposed to be diverted(in ha.) : 1.92   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.1.92    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 0   (iii). Temporary Employment(Number of person-days): 36500
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: No   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii) . Reason for not providing Non-Forest Land: Certificate from Chief Secretary regarding non-availability of suitable non-forest/ revenue forest land
Additional information Details
Documents
S.No Documents
Remarks
1ABSTRACT OF TREES INVOLVED IN THE SELECTED ALIGNMENT
2SHORT NARRATION OF THE PROJECT
3CHECK LIST REGARDING TOPOSHEET
4CHECK LIST REGARDING LINEAR CHART OF THE ROAD
5CHECK LIST REGARDING FOREST AREA INVOLVED IN THE PROPOSAL
6CHECK LIST REGARDING NON FOREST AREA INVOLVED IN THE PROPOSAL
7CHECK LIST REGARDING MINIMUM USE OF FOREST LAND, ALTERNATE ROUTES EXPLORED
8CHECK LIST REGARDING FOR PAYMENT OF COST OF CA
9CHECK LIST REGARDING FOR PAYMENT OF NPV OF FOREST AREA
10CHECK LIST REGARDING FOR PAYMENT OF ADDITIONAL NPV OF FOREST AREA AS PER FINAL DECISION OF HONBLE SUPREME COURT
11LIST OF TREES INVOLVED IN THE FINAL/SELECTED ALIGNMENT
12DETAILS OF FOREST AREA IDENTIFIED FOR CA
13SCHEME OF CA
14LAND SUITABILITY CERTIFICATE BY DFO RENUKAJI
15CERTIFICATE FROM DFO RENUKAJI REGARDING LAND IDENTIFIED FOR CA IS SUITABLE FOR RAISING PLANTATION
16CERTIFICATE IN RESPECT OF DUMPING YARD
17CERTIFICATE REGARDING FINAL ALIGNMENT
18INESCAPABILITY CERTIFICATE
19JOINT INSPECTION REPORT
20CERTIFICATE THAT THE DIGITAL MAP IS PREPARED BY USING DIFFERENTIAL GPS
21VILLAGE WISE DISTRIBUTION OF FOREST AND NON FOREST LAND
22DIGITAL MAP OF CA
23ENUMERATION LIST OF TREES INVOLVED IN ALL EXPLORED ALIGNMENTS
24CERTIFICATE FROM VILLAGE REVENUE OFFICER REGARDING LAND STATUS INVOLVED IN THE SELECTED ALIGNMENT
25POPULATION CERTIFICATE OF THE VARIOUS VILLAGES INVOLVED IN THE SELECTED ALIGNMNENT
26Village detail from revenue authority
27Distance certificate from eco sensitive zone
28Single PDF for Additional information Documents
29Length and width
30Appendix (Plan) of the new expenditure schedule, the priority year 2019-20 specified by the Hon'ble legislators.
31Certificate regarding Non-Availability of Non-Forest land in respect of link Road Chillon to Chowki Mrigwal forest land 1.92 Hact.
32Certificate of trees at muck dumping site
33MLA PRIORITY LETTER
34Undertaking regarding DPR
35Copy of Administrative and financial approval duly authenticated by the competent authority
36Undertaking regarding Soil Moisture conservation plan
37Report from the geologist duly authenticated by the DFO.
38Undertaking regarding DPR
39Detail of observations attended.
40Muck Management plan
41Reclamation plan
42Site inspection and feasibility analysis report
43Dumping Site inspection report