FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A.
General Details
A-1.
Project Details
(i). Proposal No. :
FP/HP/ROAD/48987/2020
(ii). Name of Project for which Forest Land is required :
C/O CHILLON TO CHOWKIMRIGWAL ROAD KM 0/00 TO 8/00
(iii). Short narrative of the proposal and Project/scheme for which the forest land is required :
The C/o CHILLON TO CHOWKI MRIGWAL ROAD KM 0/00 TO 8/00 bifurcate from Laldhang Paonta Ronhat Rohru(NH-707) at RD 23/00. The total length of the road is 8.00 KM, which will connect village namely Tikker, Kuner, Kakvadi, Bag and Chowki mrigwal. At present there is no link road to these villages excep
(iv). State :
Himachal Pradesh
(v). Category of the Proposal :
Road
(vi). Shape of forest land proposed to be diverted :
Linear
(vii). Estimated cost of the Project(Rupees in lacs) :
1200
(viii). Area of forest land proposed for diversion(in ha.):
1.92
(ix). Non-forest land required for this project(in ha.):
2.88
(x). Total period for which the forest land is proposed to be diverted(in years):
99
A-2.
Details of User Agency
(i). Name :
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
(ii). Address1 :
Engineer-in-Chief HPPWD Nirman Bhawan Nigam Vihar Shimla
(iii). Address2 :
Engineer-in-Chief HPPWD Nirman Bhawan Nigam Vihar Shimla
(iv). State :
Himachal Pradesh
(v). District :
Shimla
(vi). Pin :
171002
(vii). Landmark :
Near Police Head Quarter
(viii). Email address :
pwd-hp@nic.in
(ix). Landline Telephone No. :
177-2621401
(x). Fax No. :
177-177
(xi). Mobile No. :
9418003060
(xii). Website (if any) :
www.hppwd.gov.in
(xiii). Legal status of User Agency :
State Government
A-3.
Details of Person Making Application
(i). First Name:
PRAMOD
(ii). Middle Name:
KUMAR
(iii). Last Name:
UPRETI
(iv). Gender:
Male
(v). Designation:
Executive Engineer
(vi). Address 1:
HPPWD Shillai Division (B&R)
(vii). Address 2:
NIL
(viii). State:
Himachal Pradesh
(ix). District:
Sirmaur
(x). Tehsil:
Shillai
(xi). Pin:
173027
(xii). Landmark:
NIL
(xiii). Email Address:
ee-shi-hp@nic.in
(xiv). Landline Telephone No.:
1704-278524
(xv). Fax No.:
NIL
(xvi). Mobile No.:
9418483712
(xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B.
Details of land required for the Project
B-1.
Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no
Proposal Status.
Proposal No.
Moef File No.
Area Proposed for Diversion(Ha.)
Area Diverted(Ha.)
Date of In-Principle Approval
Date of Final Approval
NIL
B-2.
Details of forest land proposed to be diverted
B-2.1
Details of Divisions involved
Details of Divisions involved
S.no
Division Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Renukaji
1.92
2.88
Total
1.92
2.88
B-2.2
Details of Districts involved
District wise breakup
S.no
District Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Sirmaur
1.92
2.88
Total
1.92
2.88
B-2.3
Village wise breakup
Villages wise breakup
S.no
Village
Forest Land(ha.)
Non-Forest Land(ha.)
1
Chowki mrigwal
1.92
2.88
Total
1.92
2.88
B-2.4
Component wise breakup
Component wise breakup
S.no
Component
Forest Land(ha.)
Non-Forest Land(ha.)
1
DUMPING
0.16
0
2
ROAD
1.76
2.88
Total
1.92
2.88
C.
Maps of forest land proposed to be diverted
Division 1. : Renukaji
(i). Area of forest land proposed to be diverted(in ha.) :
1.92
(ii). Nature of the Project:
Linear
(b). No. of Segments :
One
Segment wise details
Segments
Segment Area(in ha.)
Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.
1.92
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D.
Justification for locating the Project in forest land and details of alternatives examined:
(i). Copy of note containing justification for locating the Project in forest land:
(ii). Whether a copy of map indicating location of alternative examine is required to be provided:
Yes
(a). Copy of map indicating location of alternative examined:
E.
Employment likely to be generated
(i). Whether the Project is likely to generate employment ?:
Yes
(ii). Permanent/Regular Employment(Number of persons):
0
(iii). Temporary Employment(Number of person-days):
36500
F.
Displacement of People due to the Project, if any
(i). Whether Project involves displacement?:
No
G.
Details of Cost-Benefit analysis for the Project
(i). Whether the Project requires Cost-Benefit analysis?:
No
H.
Status of Environmental Clearance
(i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? :
No
I.
Status of Wildelife Clearance
(i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? :
No
J.
Applicability of special provisions governing Scheduled Areas
(i).Whether the Project or a part thereof is located in a Scheduled Area? :
No
K.
Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
(i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? :
Yes
(a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L.
Details of land identified for Compensatory Afforestation
(i). Whether non-forest or Revenue forest land is required to be provided by User Agency?:
No
(ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?:
No
(iii) . Reason for not providing Non-Forest Land:
Certificate from Chief Secretary regarding non-availability of suitable non-forest/ revenue forest land
Additional information Details
Documents
S.No
Documents
Remarks
1
ABSTRACT OF TREES INVOLVED IN THE SELECTED ALIGNMENT
2
SHORT NARRATION OF THE PROJECT
3
CHECK LIST REGARDING TOPOSHEET
4
CHECK LIST REGARDING LINEAR CHART OF THE ROAD
5
CHECK LIST REGARDING FOREST AREA INVOLVED IN THE PROPOSAL
6
CHECK LIST REGARDING NON FOREST AREA INVOLVED IN THE PROPOSAL
7
CHECK LIST REGARDING MINIMUM USE OF FOREST LAND, ALTERNATE ROUTES EXPLORED
8
CHECK LIST REGARDING FOR PAYMENT OF COST OF CA
9
CHECK LIST REGARDING FOR PAYMENT OF NPV OF FOREST AREA
10
CHECK LIST REGARDING FOR PAYMENT OF ADDITIONAL NPV OF FOREST AREA AS PER FINAL DECISION OF HONBLE SUPREME COURT
11
LIST OF TREES INVOLVED IN THE FINAL/SELECTED ALIGNMENT
12
DETAILS OF FOREST AREA IDENTIFIED FOR CA
13
SCHEME OF CA
14
LAND SUITABILITY CERTIFICATE BY DFO RENUKAJI
15
CERTIFICATE FROM DFO RENUKAJI REGARDING LAND IDENTIFIED FOR CA IS SUITABLE FOR RAISING PLANTATION
16
CERTIFICATE IN RESPECT OF DUMPING YARD
17
CERTIFICATE REGARDING FINAL ALIGNMENT
18
INESCAPABILITY CERTIFICATE
19
JOINT INSPECTION REPORT
20
CERTIFICATE THAT THE DIGITAL MAP IS PREPARED BY USING DIFFERENTIAL GPS
21
VILLAGE WISE DISTRIBUTION OF FOREST AND NON FOREST LAND
22
DIGITAL MAP OF CA
23
ENUMERATION LIST OF TREES INVOLVED IN ALL EXPLORED ALIGNMENTS
24
CERTIFICATE FROM VILLAGE REVENUE OFFICER REGARDING LAND STATUS INVOLVED IN THE SELECTED ALIGNMENT
25
POPULATION CERTIFICATE OF THE VARIOUS VILLAGES INVOLVED IN THE SELECTED ALIGNMNENT
26
Village detail from revenue authority
27
Distance certificate from eco sensitive zone
28
Single PDF for Additional information Documents
29
Length and width
30
Appendix (Plan) of the new expenditure schedule, the priority year 2019-20 specified by the Hon'ble legislators.
31
Certificate regarding Non-Availability of Non-Forest land in respect of link Road Chillon to Chowki Mrigwal forest land 1.92 Hact.
32
Certificate of trees at muck dumping site
33
MLA PRIORITY LETTER
34
Undertaking regarding DPR
35
Copy of Administrative and financial approval duly authenticated by the competent authority
36
Undertaking regarding Soil Moisture conservation plan
37
Report from the geologist duly authenticated by the DFO.
38
Undertaking regarding DPR
39
Detail of observations attended.
40
Muck Management plan
41
Reclamation plan
42
Site inspection and feasibility analysis report
43
Dumping Site inspection report
Print