FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A.
General Details
A-1.
Project Details
(i). Proposal No. :
FP/HP/ROAD/148886/2021
(ii). Name of Project for which Forest Land is required :
Two laning with paved shoulders from End of Hamirpur Bypass (Chil Bahal) to Bhangbar section via Jwalamukhi from km 138+295 to Km 175+270 (Package IV) of existing NH 88 (New NH-3 & 303)
(iii). Short narrative of the proposal and Project/scheme for which the forest land is required :
The project is Rehabilitation and Upgrading of Existing Road to 2 Lane with Paved Shoulder from End of Hamirpur Bypass (Chil Bahal) to Bhangbar Section via Jwalamukhi (Package IV) of NH-88 (New NH-3 & 303) (Design Chainage- Km 138+295 to Km 175+270, Design Length-36.975 Km) including two bypasses at
(iv). State :
Himachal Pradesh
(v). Category of the Proposal :
Road
(vi). Shape of forest land proposed to be diverted :
Linear
(vii). Estimated cost of the Project(Rupees in lacs) :
108187
(viii). Area of forest land proposed for diversion(in ha.):
2.1338
(ix). Non-forest land required for this project(in ha.):
132.1069
(x). Total period for which the forest land is proposed to be diverted(in years):
99
A-2.
Details of User Agency
(i). Name :
National Highways Authority of India
(ii). Address1 :
G-5 & 6, Sector-10, Dwarka, New DElhi-110075
(iii). Address2 :
G-5 & 6, Sector-10, Dwarka, New DElhi-110075
(iv). State :
Delhi
(v). District :
South West
(vi). Pin :
110075
(vii). Landmark :
G-5 & 6,Sec-10
(viii). Email address :
biswajit@nhai.org
(ix). Landline Telephone No. :
11-25074200
(x). Fax No. :
11-25093543
(xi). Mobile No. :
9868972511
(xii). Website (if any) :
www.nhai.org
(xiii). Legal status of User Agency :
Central Government
A-3.
Details of Person Making Application
(i). First Name:
Vikram
(ii). Middle Name:
Singh
(iii). Last Name:
Meena
(iv). Gender:
Male
(v). Designation:
Project Director
(vi). Address 1:
NATIONAL HIGHWAYS AUTHORITY OF INDIA
(vii). Address 2:
PROJECT IMPLEMENTATION UNIT - HAMIRPUR, HOUSE NO.-218A, KANWAL COMPLEX, WARD NO.-1, KRISHNA NAGAR, HAMIRPUR
(viii). State:
Himachal Pradesh
(ix). District:
Hamirpur
(x). Tehsil:
NIL
(xi). Pin:
171001
(xii). Landmark:
PAKABAROH CHOWK
(xiii). Email Address:
piuhamirpur@nhai.org
(xiv). Landline Telephone No.:
197-223794
(xv). Fax No.:
NIL
(xvi). Mobile No.:
8376900598
(xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B.
Details of land required for the Project
B-1.
Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no
Proposal Status.
Proposal No.
Moef File No.
Area Proposed for Diversion(Ha.)
Area Diverted(Ha.)
Date of In-Principle Approval
Date of Final Approval
NIL
B-2.
Details of forest land proposed to be diverted
B-2.1
Details of Divisions involved
Details of Divisions involved
S.no
Division Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Hamirpur
0.2943
27.7867
2.
Dehra
1.6881
87.2455
3.
D/sala
0.1514
17.0747
Total
2.1338
132.1069
B-2.2
Details of Districts involved
District wise breakup
S.no
District Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Hamirpur
0.2943
27.7867
1.
Kangra
1.8395
104.3202
Total
2.1338
132.1069
B-2.3
Village wise breakup
Villages wise breakup
S.no
Village
Forest Land(ha.)
Non-Forest Land(ha.)
1
Chibahal
0
0.0119
2
Bhalun
0
1.2793
3
Lahar Kotlu
0
5.4065
4
Jhamer
0
0.9781
5
Thunial
0
0.2966
6
Sadhyal
0
0.7572
7
Charoti
0
1.1802
8
Bareti
0
1.8201
9
Rit
0
1.4405
10
Reori Upperli
0
0.4752
11
Jangal Khoher
0
0.0881
12
Patta
0
0.5155
13
Jajoli
0
0.028
14
Hoad
0
0.8701
15
Jalari Bhandiaran
0
1.2428
16
Jalari Saunkhlian
0
1.0136
17
Harmandir Rakwalan
0
0.0454
18
Harmandir Mandiala
0
0.6434
19
DPF Tillu
0.2943
0.2491
20
Gagal
0
1.3533
21
Kuthar
0
1.3056
22
Nagarda
0
3.2208
23
Doli Gharana
0
1.302
24
Kot
0
2.2634
25
Bharoli Kuthiara
0.0161
2.7649
26
Bag
0
0.8913
27
Ambotu
0
0.8883
28
Ghurkal
0
1.6556
29
Thehra
0
0.761
30
Kamlota
0
1.623
31
Purtiala
0
1.6977
32
Bahl
0
1.6162
33
Hiran
0
1.4627
34
Kalri
0
2.1771
35
Laharu
0.0436
0.2576
36
Hadoli
0.1865
1.0051
37
Jattlahad
0
0.149
38
Badoa
0
0.4109
39
Doli
0
1.4528
40
Salettar
0
2.7842
41
Pathiar
0
0.9044
42
Uchhar
0
5.7089
43
Bareti(418)
1.0768
4.4006
44
Chihru
0
0.661
45
Sakdyalu
0
3.7798
46
Kohla Sagwal
0
3.3054
47
Khola
0
5.1366
48
Bhati
0.3651
0.825
49
Ummer
0
4.1065
50
Buni Gujran
0
3.1174
51
Hatli
0
3.6825
52
Gummer
0
3.4805
53
Ghraun
0
3.7779
54
Katiyalu
0
0.4453
55
Dohag
0
3.9452
56
Band
0
1.8787
57
Thana
0
3.1325
58
Balu Galoa
0
1.069
59
Bariala
0.1206
3.1966
60
Gaglu
0
3.3257
61
Swar
0
0.4476
62
Kandyala
0
2.3889
63
Paisa Khas
0
3.996
64
Paloti
0
5.7916
65
Bag (807)
0
2.4108
66
Bhangbar
0.0308
3.1608
67
Suka Bag
0
3.4642
Total
2.1338
130.9235
B-2.4
Component wise breakup
Component wise breakup
S.no
Component
Forest Land(ha.)
Non-Forest Land(ha.)
1
Highway widening
2.1338
93.5861
2
Bridges/Flyover
0
1.3444
3
Disposal Area
0
37.1764
Total
2.1338
132.1069
C.
Maps of forest land proposed to be diverted
Division 1. : Dehra
(i). Area of forest land proposed to be diverted(in ha.) :
1.6881
(ii). Nature of the Project:
Linear
(b). No. of Segments :
One
Segment wise details
Segments
Segment Area(in ha.)
Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.
1.6881
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
Division 2. : D/sala
(i). Area of forest land proposed to be diverted(in ha.) :
0.1514
(ii). Nature of the Project:
Linear
(b). No. of Segments :
One
Segment wise details
Segments
Segment Area(in ha.)
Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.
0.1514
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
Division 3. : Hamirpur
(i). Area of forest land proposed to be diverted(in ha.) :
0.2943
(ii). Nature of the Project:
Linear
(b). No. of Segments :
One
Segment wise details
Segments
Segment Area(in ha.)
Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.
0.2943
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D.
Justification for locating the Project in forest land and details of alternatives examined:
(i). Copy of note containing justification for locating the Project in forest land:
(ii). Whether a copy of map indicating location of alternative examine is required to be provided:
No
(a). Reason for not providing such map:
This is upgradation of existing road
E.
Employment likely to be generated
(i). Whether the Project is likely to generate employment ?:
Yes
(ii). Permanent/Regular Employment(Number of persons):
20
(iii). Temporary Employment(Number of person-days):
73000
F.
Displacement of People due to the Project, if any
(i). Whether Project involves displacement?:
No
G.
Details of Cost-Benefit analysis for the Project
(i). Whether the Project requires Cost-Benefit analysis?:
No
H.
Status of Environmental Clearance
(i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? :
No
I.
Status of Wildelife Clearance
(i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? :
No
J.
Applicability of special provisions governing Scheduled Areas
(i).Whether the Project or a part thereof is located in a Scheduled Area? :
No
K.
Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
(i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? :
No
L.
Details of land identified for Compensatory Afforestation
(i). Whether non-forest or Revenue forest land is required to be provided by User Agency?:
Not Applicable
(ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?:
Not Applicable
(iii) . Reason for not providing Non-Forest Land:
Not Applicable
Additional information Details
Documents
S.No
Documents
Remarks
1
Pont-wise compliance to EDS raised by Nodal
2
Point No.7 compliance-Distance Certificate from DFO (WL) Hamirpur
3
Point No.8 compliance-FRA Undertaking
4
Point No.1 Compliance- Village Certificate from concerned authorities in prescribed format
5
Point No.11 Compliance- Undertaking for CA
6
Point No.11 Compliance- Undertaking for NPV
7
Point No.11 Compliance- Undertaking for Additional NPV
8
Point No.12 Compliance- Undertaking for Certificate of non availability of non forest land for the project
9
Point No.9 Compliance- Length and Width of the proposed project
10
Point No.10 Compliance-Muck Management Plan
11
Needful has been done
12
The correction has been made in the proposal folders and the acknowledgements from the concerned DFOs uploaded
13
The joint tree enumeration was completed and tree list was submitted to concerned Range Office on 02.05.2022. Thereafter forest department was assisted in preparing final tree list with volume/class/abstract which was submitted on 13.05.2022. Requested to give necessary instructions to the Range Office for onward submission to your office for further processing of the proposal.
14
EDS of 30.05.2022 attended. Revised CA undertaking for revised forest area of 0.2943 ha under Hamirpur FD
15
EDS of 30.05.2022 attended. Revised NPV undertaking for revised forest area of 0.2943 ha under Hamirpur FD
16
EDS of 30.05.2022 attended. Revised Additional NPV undertaking for revised forest area of 0.2943 ha under Hamirpur FD
17
EDS of 30.05.2022 attended. Revised NAC undertaking for revised forest area of 0.2943 ha under Hamirpur FD
18
EDS of 30.05.2022 attended. Revised FRA undertaking for revised forest area of 0.2943 ha under Hamirpur FD
19
The hard copies of the proposal folder submitted to CF Hamirpur
20
Compliance to observations raised by Nodal dated 02.08.2022
21
Compliance to observations raised by Regional Office, Shimla dated 14.10.2022
22
Compliance to observations raised by Regional Office, Shimla dated 08.12.2022 uploaded.
23
Compliance to EDS raised by IRO dated 17.01.2023 is hereby submitted.
Print