FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A.
General Details
A-1.
Project Details
(i). Proposal No. :
FP/HP/ROAD/146012/2021
(ii). Name of Project for which Forest Land is required :
Barjaidhar to Thua via Parkot road km 0/000 to 8/900
(iii). Short narrative of the proposal and Project/scheme for which the forest land is required :
The forest land is required for the construction of Barjaidhar to Thua via Parkot road . The total length of the road is 8.900 kms. out of which 8.740 kms. of road will pass through the forest land and 1.060 kms. will pass through private land. This road is being constructed to provide motor link to
(iv). State :
Himachal Pradesh
(v). Category of the Proposal :
Road
(vi). Shape of forest land proposed to be diverted :
Linear
(vii). Estimated cost of the Project(Rupees in lacs) :
650
(viii). Area of forest land proposed for diversion(in ha.):
5.27
(ix). Non-forest land required for this project(in ha.):
0.64
(x). Total period for which the forest land is proposed to be diverted(in years):
99
A-2.
Details of User Agency
(i). Name :
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
(ii). Address1 :
Engineer-in-Chief HPPWD Nirman Bhawan Nigam Vihar Shimla
(iii). Address2 :
Engineer-in-Chief HPPWD Nirman Bhawan Nigam Vihar Shimla
(iv). State :
Himachal Pradesh
(v). District :
Shimla
(vi). Pin :
171002
(vii). Landmark :
Near Police Head Quarter
(viii). Email address :
pwd-hp@nic.in
(ix). Landline Telephone No. :
177-2621401
(x). Fax No. :
177-177
(xi). Mobile No. :
9418003060
(xii). Website (if any) :
www.hppwd.gov.in
(xiii). Legal status of User Agency :
State Government
A-3.
Details of Person Making Application
(i). First Name:
Yash
(ii). Middle Name:
Pal
(iii). Last Name:
Chaudhary
(iv). Gender:
Male
(v). Designation:
Executive Engineer
(vi). Address 1:
Outer Seraj Division HPPWD Nirmand
(vii). Address 2:
NIL
(viii). State:
Himachal Pradesh
(ix). District:
Kullu
(x). Tehsil:
Nermand(T)
(xi). Pin:
172023
(xii). Landmark:
NIL
(xiii). Email Address:
ee-nir-hp@nic.in
(xiv). Landline Telephone No.:
1904-255140
(xv). Fax No.:
NIL
(xvi). Mobile No.:
9418113913
(xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B.
Details of land required for the Project
B-1.
Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no
Proposal Status.
Proposal No.
Moef File No.
Area Proposed for Diversion(Ha.)
Area Diverted(Ha.)
Date of In-Principle Approval
Date of Final Approval
NIL
B-2.
Details of forest land proposed to be diverted
B-2.1
Details of Divisions involved
Details of Divisions involved
S.no
Division Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Ani at Luhri
5.27
0.64
Total
5.27
0.64
B-2.2
Details of Districts involved
District wise breakup
S.no
District Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Kullu
5.27
0.64
Total
5.27
0.64
B-2.3
Village wise breakup
Villages wise breakup
S.no
Village
Forest Land(ha.)
Non-Forest Land(ha.)
1
Parkot
0.9
0
2
Pokatu
0.5
0
3
Jaterh
0.6
0.15
4
Nagot
1.5
0.3
5
Kuttwa
1.15
0.13
6
Nagnidhar
0.62
0.06
Total
5.27
0.64
B-2.4
Component wise breakup
Component wise breakup
S.no
Component
Forest Land(ha.)
Non-Forest Land(ha.)
1
Road
4.71
0.64
2
Dumping Site
0.56
0
Total
5.27
0.64
C.
Maps of forest land proposed to be diverted
Division 1. : Ani at Luhri
(i). Area of forest land proposed to be diverted(in ha.) :
5.27
(ii). Nature of the Project:
Linear
(b). No. of Segments :
One
Segment wise details
Segments
Segment Area(in ha.)
Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.
5.27
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D.
Justification for locating the Project in forest land and details of alternatives examined:
(i). Copy of note containing justification for locating the Project in forest land:
(ii). Whether a copy of map indicating location of alternative examine is required to be provided:
Yes
(a). Copy of map indicating location of alternative examined:
E.
Employment likely to be generated
(i). Whether the Project is likely to generate employment ?:
Yes
(ii). Permanent/Regular Employment(Number of persons):
0
(iii). Temporary Employment(Number of person-days):
55714
F.
Displacement of People due to the Project, if any
(i). Whether Project involves displacement?:
No
G.
Details of Cost-Benefit analysis for the Project
(i). Whether the Project requires Cost-Benefit analysis?:
Yes
(a). Copy of Cost-Benefit analysis:
H.
Status of Environmental Clearance
(i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? :
No
I.
Status of Wildelife Clearance
(i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? :
No
J.
Applicability of special provisions governing Scheduled Areas
(i).Whether the Project or a part thereof is located in a Scheduled Area? :
No
K.
Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
(i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? :
Yes
(a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L.
Details of land identified for Compensatory Afforestation
(i). Whether non-forest or Revenue forest land is required to be provided by User Agency?:
No
(ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?:
No
(iii) . Reason for not providing Non-Forest Land:
Others
Additional information Details
Documents
S.No
Documents
Remarks
1
Population detail
2
Certificate of Non availability of land for CA
3
Reclamation plan
4
check list 7 i.e. Detail of forest land
5
check list 8 i.e. Detail of Non forest land
6
Arial distance
7
detail note on the project
8
undertaking to pay cost of fence post ,No habitation displacement and no alignment change
9
undertaking for non availability of non forest land for dumping site
10
Line plane of proposed road
11
undertaking for payment of NPV of forest land
12
undertaking for payment of additional amount of NPV of forest land
13
Certificate for minimum use of forest land
14
undertaking for payment of cost of CA
15
Length and width of road
16
Joint Inspection Report
17
Geological Report/Certificate
18
Complete reply of shortcoming raised by IR office.
19
Justification for Road Alignment
20
Certificate attached Regarding village Parkot
21
Point wise reply of shortcoming raised by Nodal Officer
22
Revise Layout Plan
23
Gift Deed Sale Noc
24
Revised Pdf file of Muck Plan and Reclaim nation Plan
25
Inspection Report CCF Rampur
26
Reply of EDS by Nodal officer
27
Revised Cost Benefit Analysis on Latest NPV Rates
28
Undertaking of existing marg duly signed by Field officials
29
Signed copy of Administrative Approval and Certificate regarding budget availabilty
30
Revised Legible Document copy uploaded in Sr. No. 30 of Part I