FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/HP/ROAD/145666/2021   (ii). Name of Project for which Forest Land is required : Diversion of Forest Land for Construction of Dubling - Rishi Dogri - Lamche Dogri Road from 0.00 km to 25.00 km by CPWD under Kinnaur District of Himachal Pradesh   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : The work is of National Importance having strategic in nature from Border security aspects. The total length of the project is 25 Km. The total land required is 50.091 ha.   (iv). State : Himachal Pradesh   (v). Category of the Proposal : Road   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 45503   (viii). Area of forest land proposed for diversion(in ha.): 50.091   (ix). Non-forest land required for this project(in ha.): 0   (x). Total period for which the forest land is proposed to be diverted(in years): 99
A-2. Details of User Agency
  (i). Name : ITBP FLOOR 03 BLOCK 02, ITBP, CGO COMPLEX, LODHI ROAD NEW DELHI   (ii). Address1 : FLOOR 03 BLOCK 02, ITBP, CGO COMPLEX, LODHI ROAD NEW DELHI   (iii). Address2 : NIL   (iv). State : Delhi   (v). District : New Delhi   (vi). Pin : 110003   (vii). Landmark : NEAR NJA BUILDING, CGO COMPLEX   (viii). Email address : hpee-icbrpd3@cpwd.gov.in   (ix). Landline Telephone No. : 11-24360268   (x). Fax No. : 11-11   (xi). Mobile No. : 8878023460   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : Central Government
A-3. Details of Person Making Application
  (i). First Name: Adarsh   (ii). Middle Name: Kumar   (iii). Last Name: Mishra   (iv). Gender: Male   (v). Designation: Executive Engineer   (vi). Address 1: Executive Engineer, ICBRPD-III, CPWD, Reckong Peo, In Front of HPPWD Rest House, Reckong Peo   (vii). Address 2: NIL   (viii). State: Himachal Pradesh   (ix). District: Kinnaur   (x). Tehsil: Kalpa(T)   (xi). Pin: 172107   (xii). Landmark: HPPWD Rest House ke Samne   (xiii). Email Address: hpee-icbrpd3@cpwd.gov.in   (xiv). Landline Telephone No.: 0-   (xv). Fax No.: NIL   (xvi). Mobile No.: 8878023460   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Kinnaur50.0910
Total50.0910
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Kinnaur50.0910
Total50.0910
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
NIL
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Proposed Road Alignment before stream2.70
2Proposed Road Alignment after stream42.23950
3Proposed bridge on the stream0.180
4Proposed Muck Dumping Area4.97150
Total 50.091 0
C. Maps of forest land proposed to be diverted
Division 1. : Kinnaur
  (i). Area of forest land proposed to be diverted(in ha.) : 50.091   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.50.091    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: No   (a). Reason for not providing such map: It is a greenfield alignment and ITBP IG (ops) fin
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 20   (iii). Temporary Employment(Number of person-days): 91250
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Not Applicable   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Not Applicable   (iii) . Reason for not providing Non-Forest Land: Not Applicable
Additional information Details
Documents
S.No Documents
Remarks
1Certificate of "No-habitation" Along the Alignment of proposed Road
2NON-AVAILABILITY OF NON FOREST LAND CERTIFICATE
3field book
4Query Compliance Reply
5Query Compliance Letter
6Reclamation Plan
7Certificate for minimum use of forest land.
8Authorization letter
9Undertaking for payment of Compensatory Afforestation.
10Undertaking for payment of Additional Net Present Value.
11Undertaking for payment of Net Present Value.
12Full title of the Project.
13Detail note of the Project.
14State showing details of forest area proposed for diversion.
15State showing details of non forest area proposed for diversion.
16Eco Sensitive Zone Certificate.
17Evaluation of Alternate Certificate.
18Joint Inspection Report.
19Justification Letter
20Land Schedule of the proposed alignment.
21All Queries Attended 01/12/2021
22CBA Undertaking
23Layout Plan
24FRA Application
25Estimate of Engineering Structure
26Design of Engineering Structure
27Query Compliance 09.02.2022
28Reply dated 23 April 2022 of EDS raised by Nodal officer FCA.
29Administrative Approval of the Project
30Layout Plan of the project.
31Geo Reference Map of the project.
32Satellite Image of the project.
33Muck Management Plan of the Project.
34Approved Alignment letter of the Project.
35Reply dated 10 June 2022 of EDS raised by IRO Shimla Himachal Pradesh.
36Reply dated 12 August 2022 of EDS raised by IRO Shimla Himachal Pradesh.
37FRA Approval copy of dubling rishi dogri - lamche dogri road Himachal Pradesh, in prescribe format.
38Undertaking for payment of cost of implementation of Wildlife Management Plan & Soil and Moisture Conservation Plan.
39State showing details of forest area proposed for diversion dated 02.11.2022
40Reply dated 22 Feb 2023 of EDS raised by IRO Shimla Himachal Pradesh.