FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/HP/ROAD/11020/2015   (ii). Name of Project for which Forest Land is required : Construction of Link road from Masroor to Ghariar   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : The proposal involves construction of link road from Masroor to Ghariar KM 0/0 to KM 2/786, in Tehsil Dehra, District Kangra within the Jurisdiction of HPPWD Dehra Division. The proposed road falls in Mohal Masroor and Mohal Dhar Ghariar. The proposed road has total length of 2786 m out of which 178   (iv). State : Himachal Pradesh   (v). Category of the Proposal : Road   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 124   (viii). Area of forest land proposed for diversion(in ha.): 1.5648   (ix). Non-forest land required for this project(in ha.): 0.1069   (x). Total period for which the forest land is proposed to be diverted(in years): 99
A-2. Details of User Agency
  (i). Name : HIMACHAL PRADESH PUBLIC WORK DEPARTMENT   (ii). Address1 : Engineer-in-Chief HPPWD Nirman Bhawan Nigam Vihar Shimla   (iii). Address2 : Engineer-in-Chief HPPWD Nirman Bhawan Nigam Vihar Shimla   (iv). State : Himachal Pradesh   (v). District : Shimla   (vi). Pin : 171002   (vii). Landmark : Near Police Head Quarter   (viii). Email address : pwd-hp@nic.in   (ix). Landline Telephone No. : 177-2621401   (x). Fax No. : 177-177   (xi). Mobile No. : 9418003060   (xii). Website (if any) : www.hppwd.gov.in   (xiii). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: Ajay   (ii). Middle Name: NIL   (iii). Last Name: Sharma   (iv). Gender: Male   (v). Designation: Executive Engineer   (vi). Address 1: HPPWD Dehra   (vii). Address 2: NIL   (viii). State: Himachal Pradesh   (ix). District: Kangra   (x). Tehsil: Dera Gopipur(T)   (xi). Pin: 177101   (xii). Landmark: NIL   (xiii). Email Address: ee-deh-hp@nic.in   (xiv). Landline Telephone No.: 1970-233116   (xv). Fax No.: NIL   (xvi). Mobile No.: 8219757619   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Dehra1.56480.1069
Total1.56480.1069
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Kangra1.56480.1069
Total1.56480.1069
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Masroor0.86040.1069
2Dhar Ghariar0.70440
Total 1.5648 0.1069
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Road1.56480.1069
2Dumping Site00
Total 1.5648 0.1069
C. Maps of forest land proposed to be diverted
Division 1. : Dehra
  (i). Area of forest land proposed to be diverted(in ha.) : 1.5648   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.1.5648    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: No   (a). Reason for not providing such map: The case is being submitted to regularize the viol
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 0   (iii). Temporary Employment(Number of person-days): 15000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: No   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Not Applicable   (iii) . Reason for not providing Non-Forest Land: Certificate from Chief Secretary regarding non-availability of suitable non-forest/ revenue forest land
Additional information Details
Documents
S.No Documents
Remarks
1Check List 1
2Check List 2 Form A Part I to III
3Check List 3 Detail Note
4Check List 4 Topo Map and Geo Map
5Check List 5 Linear Plan
6Check List 6 Statement of Forest Land
7Check List 7 Statement of Non Forest Land
8Check List 8 DC Certificate No Alternative
9Check List 9 Justification Note
10Check List 10 Certificate Minimum Use
11Check List 11 Undertaking to Pay Cost of CA
12Check List 12 Undertaking to Pay Cost of NPV
13Check List 12 Undertaking to Pay Cost of Additional NPV
14Check List 12 NPV Bill and Penal NPV Bill
15Check List 13 FRA Certificate
16Check List 15 Inspection Report
17Check List 16 Topo Map and Geo Map CA
18Check List 17 CA Scheme
19Check List 18 Land Suitability Certificate
20Check List 19 Violation Certificate
21Check List 20 DC Certificate Non Availability CA Land
22Check List 23 Detail of Road
23Check List 34 Dimension Wise Component Detail
24Check List 34 NOC Panchayat
25Check List 34 Beneficiary Certificate
26Check List 34 Eco Sensitive Zone Certificate
27Check List 34 Revenue Record
28Declaration by villagers on existance of Road of GP Massor
29Reply to EDSs(raised by Nodal Office) 6-9-2024