A-1. Project Details
  (i). Proposal No. : FP/HP/HYD/52179/2020   (ii). Name of Project for which Forest Land is required : HAIL HEP   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : HAIL HEP on chenni Nallah , a tributary of baira nallah and sub tributary of River ravi in tehsil churah Dist chamba H.P.   (iv). State : Himachal Pradesh   (v). Category of the Proposal : Hydel   (vi). Shape of forest land proposed to be diverted : Non Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 16600   (viii). Area of forest land proposed for diversion(in ha.): 9.3408   (ix). Non-forest land required for this project(in ha.): 1.0591   (x). Total period for which the forest land is proposed to be diverted(in years): 40
A-2. Details of User Agency
  (i). Name : HPSEB   (ii). Address1 : SUPERINTENDING ENGINEER,PLANNING CIRCLE,(CIVIL),MANDI   (iii). Address2 : MANDI   (iv). State : Himachal Pradesh   (v). District : Mandi   (vi). Pin : 175001   (vii). Landmark : NIL   (viii). Email address : sepcmandi@hpseb.in   (ix). Landline Telephone No. : 1905-224110   (x). Fax No. : 1905-224110   (xi). Mobile No. : 9418031891   (xii). Website (if any) : hpseb.com   (xiii). Legal status of User Agency : State PSU
A-3. Details of Person Making Application
  (i). First Name: SURINDER   (ii). Middle Name: NIL   (iii). Last Name: KUMAR   (iv). Gender: Male   (v). Designation: SR. EXECUTIVE ENGINEER   (vi). Address 1: Sr. Executive Engineer Projects Construction Division NO-1 HPSEBL TISSA   (vii). Address 2: NIL   (viii). State: Himachal Pradesh   (ix). District: Chamba   (x). Tehsil: NIL   (xi). Pin: 176316   (xii). Landmark: NIL   (xiii). Email Address: xenpcd1tissa@gmail.com   (xiv). Landline Telephone No.: 1896-209107   (xv). Fax No.: NIL   (xvi). Mobile No.: 8580683387   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
Proposal Submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
1Under Processing at State GovernmentFP/HP/HYD/32280/201800
Total 0 0
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Churah9.34081.0591
Total9.34081.0591
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Chamba9.34081.0591
Total9.34081.0591
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Silon1.87570.2393
2Devikothi0.28080.4413
3Tepa7.18430.3785
Total 9.3408 1.0591
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Penstock0.15040.2365
2ROAD4.87670.7032
3adit & Tunnel1.32220.1194
4Dumping Sites1.54350
5Job Facilities0.26950
6Magazine0.03640
7Intake0.28630
8Surge Shaft0.05790
9Valve house0.07690
10Power House0.5790
11Workshop & Store0.1420
Total 9.3408 1.0591
C. Maps of forest land proposed to be diverted
Division 1. : Churah
  (i). Area of forest land proposed to be diverted(in ha.) : 9.3408   (ii). Nature of the Project: Non Linear   (a). No. of patches : One
Patch wise details
Patch No. Area of Patch(in ha.) Kml File of PatchesTo view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.9.3408    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 0   (iii). Temporary Employment(Number of person-days): 100000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: Yes   (a). Copy of Cost-Benefit analysis:
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: No   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Not Applicable   (iii) . Reason for not providing Non-Forest Land: Others
M. Hydel/Irrigation/Multipurpose Project
  (i). Installed power generation capacity of the Project(in MW): 18   (ii). Total command area of the Project(in ha.): 0   (a). Copy of the approval of competent authority to the Catchment Area Treatment Plan (CAT Plan):   (b). Copy of the approved CAT plan:
Additional information Details
Documents
S.No Documents
Remarks
1Certificate for minimum use of forest land
2Undertaking for payment of cost compensatory afforestation
3Location map for compensatory afforestation
4Dgps of compensatory afforestation
5land use of compensatory afforestation hail
6Scheme for compensatory afforestation
7Certificate regarding suitability of area selected for Compensatory Plantation from management point of view
8Detailed report on violation of provision of Forest Acts
9certificate for Non-availability of Non Forest Land for Raising Compensatory Afforestation
10Certificate for Non-Availability of Non-Forest Land
11Noc Fisheries
12noc industry of hail hep
13noc iph of hail hep
14noc mining of hail hep
15noc of gram panchayat for hail hep
16Noc pollution
17noc pwd
18NOC Wildlife
19Npv of hail hep
20Value of trees
21general layout plan of HAIL HEP
22Power evacuation plan of HAIL HEP
23TEC of HAIL HEP
24allotment
25muck management plan
26power evacuation by HPPTCL
27power evacuation upto banjal substation by HPSEBL (ES)
28power evacuation from banjal substation to onwards by HPPTCL
29implementation agreement
30DOE letter regarding Ravi basin