A-1. Project Details
  (i). Proposal No. : FP/HP/HYD/49485/2020   (ii). Name of Project for which Forest Land is required : Duhangan III 1 M/W   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : We are going to start small Hydro electric project of 1 M/w In village Chnala and Bhnara at jgatsukh tehsil Manali District Kullu H.P.   (iv). State : Himachal Pradesh   (v). Category of the Proposal : Hydel   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 950.2   (viii). Area of forest land proposed for diversion(in ha.): 0.5848   (ix). Non-forest land required for this project(in ha.): 0   (x). Total period for which the forest land is proposed to be diverted(in years): 40
A-2. Details of User Agency
  (i). Name : DHOMYA RISHI JAMDAGNI HYDRO POWER PRIVATE LIMITED   (ii). Address1 : C/o Ganpati Jeweler, Akhara Bazar Kullu   (iii). Address2 : NIL   (iv). State : Andhra Pradesh   (v). District : Prakasam   (vi). Pin : 175101   (vii). Landmark : NIL   (viii). Email address : dhomyarishihydro@gmail.com   (ix). Landline Telephone No. : -1-   (x). Fax No. : -1-   (xi). Mobile No. : 7018306363   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : Private
A-3. Details of Person Making Application
  (i). First Name: Mr Rahul Bhalla   (ii). Middle Name: NIL   (iii). Last Name: NIL   (iv). Gender: NIL   (v). Designation: NIL   (vi). Address 1: C/o Ganpati Jeweler, Akhara Bazar Kullu   (vii). Address 2: NIL   (viii). State: Himachal Pradesh   (ix). District: Kullu   (x). Tehsil: NIL   (xi). Pin: 175101   (xii). Landmark: NIL   (xiii). Email Address: dhomyarishihydro@gmail.com   (xiv). Landline Telephone No.: 0-   (xv). Fax No.: NIL   (xvi). Mobile No.: 7018306363   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Kullu0.58480
Total0.58480
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Kullu0.58480
Total0.58480
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Bhnara Chnnala0.58480
Total 0.5848 0
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Trench Weir0.030
2Feeder Channel0.02190
3Desilting Tank0.0180
4Water Still Power Pipe Channel0.03690
5Silt Flushing Channel0.0040
6Fowbay0.01440
7Spil Way0.0050
8Penstock0.04520
9Power House0.030
10Switch Yard0.02250
11Tail Race0.0020
12Road to Weir0.0520
13Underground T/line0.10680
14Interconnection Point Sub-Station Solar Tape Point0.00160
15Muck Dumping-I0.00750
16Muck Dumping-II0.0150
17Muck Dumping-III0.0120
18Muck Dumping-IV0.030
19Road to Power House and Underground T/line0.130
Total 0.5848 0
C. Maps of forest land proposed to be diverted
Division 1. : Kullu
  (i). Area of forest land proposed to be diverted(in ha.) : 0.5848   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.0.5848    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 12   (iii). Temporary Employment(Number of person-days): 15695
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : No
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Not Applicable   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Not Applicable   (iii) . Reason for not providing Non-Forest Land: Not Applicable
M. Hydel/Irrigation/Multipurpose Project
  (i). Installed power generation capacity of the Project(in MW): 1.0   (ii). Total command area of the Project(in ha.): 0
Additional information Details
Documents
S.No Documents
Remarks
1Note On Project
2Undertaking FRA
3Check List 9
4Check List 21 CA
5Certificate of Muhal
6Bill of NPV
7Joint Inspection Report
8Noc Fishries
9Noc Gram Panchayat
10Noc IPH
11Noc PWD
12Noc Wild Life
13Sanction Letter HImurja
14Sanction Letter HImurja 2nd
15Udertaking IATC
16Field Book
17Undertaking Compensatory
18Undertaking NPV
19Bill Cost of Land
20Bill Cost of Land
21Certificate Eco Senstive Zone Distance
22Regarding Correction of Distance Certificate, IA,TEC,Tripartite agreement etc
23Regarding Correction of Eco Senstive Zone
24Revised NPV
25TEC
26IA
27IA Tripartie
28Change of Name
29rely to DFO 21 Dec. 2022
30FCA Proposal in Single PDF
31Reply Letter 25 April 2023
32Reply Letter to DFO 25 April 2023
33Soil Moisture Conservation Plan (SMCP) Undertaking
34Detail and DGPS Map of proposed/existing projects over the stream
35Detail of nearest PAs and ESZs distance from projects over the stream
36Approved capacity of the stream
37River Beas river basin study data
38Reclamation Plan
39Alternatives Explored
40Muck Management Plan and X-Section of Dumping Sites
41Layout Plan
42Power Evacuation/Transmission detail
43EDS dated 06.09.2023 reply
44Reply to EDS Oct, 2023
45EDS dated 18.12.2023 Reply
46EIA Notification01.12.2009
47EDS 12.02.2024 reply
48EDS dated 21.02.2024 reply
49Undertaking Minimum use of forest land
50EDS dated 05.04.2024 reply