FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A.
General Details
A-1.
Project Details
(i). Proposal No. :
FP/HP/HYD/49485/2020
(ii). Name of Project for which Forest Land is required :
Duhangan III 1 M/W
(iii). Short narrative of the proposal and Project/scheme for which the forest land is required :
We are going to start small Hydro electric project of 1 M/w In village Chnala and Bhnara at jgatsukh tehsil Manali District Kullu H.P.
(iv). State :
Himachal Pradesh
(v). Category of the Proposal :
Hydel
(vi). Shape of forest land proposed to be diverted :
Linear
(vii). Estimated cost of the Project(Rupees in lacs) :
950.2
(viii). Area of forest land proposed for diversion(in ha.):
0.5848
(ix). Non-forest land required for this project(in ha.):
0
(x). Total period for which the forest land is proposed to be diverted(in years):
40
A-2.
Details of User Agency
(i). Name :
DHOMYA RISHI JAMDAGNI HYDRO POWER PRIVATE LIMITED
(ii). Address1 :
C/o Ganpati Jeweler, Akhara Bazar Kullu
(iii). Address2 :
NIL
(iv). State :
Andhra Pradesh
(v). District :
Prakasam
(vi). Pin :
175101
(vii). Landmark :
NIL
(viii). Email address :
dhomyarishihydro@gmail.com
(ix). Landline Telephone No. :
-1-
(x). Fax No. :
-1-
(xi). Mobile No. :
7018306363
(xii). Website (if any) :
NIL
(xiii). Legal status of User Agency :
Private
A-3.
Details of Person Making Application
(i). First Name:
Mr Rahul Bhalla
(ii). Middle Name:
NIL
(iii). Last Name:
NIL
(iv). Gender:
NIL
(v). Designation:
NIL
(vi). Address 1:
C/o Ganpati Jeweler, Akhara Bazar Kullu
(vii). Address 2:
NIL
(viii). State:
Himachal Pradesh
(ix). District:
Kullu
(x). Tehsil:
NIL
(xi). Pin:
175101
(xii). Landmark:
NIL
(xiii). Email Address:
dhomyarishihydro@gmail.com
(xiv). Landline Telephone No.:
0-
(xv). Fax No.:
NIL
(xvi). Mobile No.:
7018306363
(xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B.
Details of land required for the Project
B-1.
Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no
Proposal Status.
Proposal No.
Moef File No.
Area Proposed for Diversion(Ha.)
Area Diverted(Ha.)
Date of In-Principle Approval
Date of Final Approval
NIL
B-2.
Details of forest land proposed to be diverted
B-2.1
Details of Divisions involved
Details of Divisions involved
S.no
Division Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Kullu
0.5848
0
Total
0.5848
0
B-2.2
Details of Districts involved
District wise breakup
S.no
District Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Kullu
0.5848
0
Total
0.5848
0
B-2.3
Village wise breakup
Villages wise breakup
S.no
Village
Forest Land(ha.)
Non-Forest Land(ha.)
1
Bhnara Chnnala
0.5848
0
Total
0.5848
0
B-2.4
Component wise breakup
Component wise breakup
S.no
Component
Forest Land(ha.)
Non-Forest Land(ha.)
1
Trench Weir
0.03
0
2
Feeder Channel
0.0219
0
3
Desilting Tank
0.018
0
4
Water Still Power Pipe Channel
0.0369
0
5
Silt Flushing Channel
0.004
0
6
Fowbay
0.0144
0
7
Spil Way
0.005
0
8
Penstock
0.0452
0
9
Power House
0.03
0
10
Switch Yard
0.0225
0
11
Tail Race
0.002
0
12
Road to Weir
0.052
0
13
Underground T/line
0.1068
0
14
Interconnection Point Sub-Station Solar Tape Point
0.0016
0
15
Muck Dumping-I
0.0075
0
16
Muck Dumping-II
0.015
0
17
Muck Dumping-III
0.012
0
18
Muck Dumping-IV
0.03
0
19
Road to Power House and Underground T/line
0.13
0
Total
0.5848
0
C.
Maps of forest land proposed to be diverted
Division 1. : Kullu
(i). Area of forest land proposed to be diverted(in ha.) :
0.5848
(ii). Nature of the Project:
Linear
(b). No. of Segments :
One
Segment wise details
Segments
Segment Area(in ha.)
Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.
0.5848
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D.
Justification for locating the Project in forest land and details of alternatives examined:
(i). Copy of note containing justification for locating the Project in forest land:
(ii). Whether a copy of map indicating location of alternative examine is required to be provided:
Yes
(a). Copy of map indicating location of alternative examined:
E.
Employment likely to be generated
(i). Whether the Project is likely to generate employment ?:
Yes
(ii). Permanent/Regular Employment(Number of persons):
12
(iii). Temporary Employment(Number of person-days):
15695
F.
Displacement of People due to the Project, if any
(i). Whether Project involves displacement?:
No
G.
Details of Cost-Benefit analysis for the Project
(i). Whether the Project requires Cost-Benefit analysis?:
No
H.
Status of Environmental Clearance
(i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? :
No
I.
Status of Wildelife Clearance
(i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? :
No
J.
Applicability of special provisions governing Scheduled Areas
(i).Whether the Project or a part thereof is located in a Scheduled Area? :
No
K.
Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
(i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? :
No
L.
Details of land identified for Compensatory Afforestation
(i). Whether non-forest or Revenue forest land is required to be provided by User Agency?:
Not Applicable
(ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?:
Not Applicable
(iii) . Reason for not providing Non-Forest Land:
Not Applicable
M.
Hydel/Irrigation/Multipurpose Project
(i). Installed power generation capacity of the Project(in MW):
1.0
(ii). Total command area of the Project(in ha.):
0
Additional information Details
Documents
S.No
Documents
Remarks
1
Note On Project
2
Undertaking FRA
3
Check List 9
4
Check List 21 CA
5
Certificate of Muhal
6
Bill of NPV
7
Joint Inspection Report
8
Noc Fishries
9
Noc Gram Panchayat
10
Noc IPH
11
Noc PWD
12
Noc Wild Life
13
Sanction Letter HImurja
14
Sanction Letter HImurja 2nd
15
Udertaking IATC
16
Field Book
17
Undertaking Compensatory
18
Undertaking NPV
19
Bill Cost of Land
20
Bill Cost of Land
21
Certificate Eco Senstive Zone Distance
22
Regarding Correction of Distance Certificate, IA,TEC,Tripartite agreement etc
23
Regarding Correction of Eco Senstive Zone
24
Revised NPV
25
TEC
26
IA
27
IA Tripartie
28
Change of Name
29
rely to DFO 21 Dec. 2022
30
FCA Proposal in Single PDF
31
Reply Letter 25 April 2023
32
Reply Letter to DFO 25 April 2023
33
Soil Moisture Conservation Plan (SMCP) Undertaking
34
Detail and DGPS Map of proposed/existing projects over the stream
35
Detail of nearest PAs and ESZs distance from projects over the stream
36
Approved capacity of the stream
37
River Beas river basin study data
38
Reclamation Plan
39
Alternatives Explored
40
Muck Management Plan and X-Section of Dumping Sites
41
Layout Plan
42
Power Evacuation/Transmission detail
43
EDS dated 06.09.2023 reply
44
Reply to EDS Oct, 2023
45
EDS dated 18.12.2023 Reply
46
EIA Notification01.12.2009
47
EDS 12.02.2024 reply
48
EDS dated 21.02.2024 reply
49
Undertaking Minimum use of forest land
50
EDS dated 05.04.2024 reply