FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/HP/HYD/49283/2020   (ii). Name of Project for which Forest Land is required : TUNDAH-II HYDROELECTRIC PROJECT (24.00MW)   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Tundah-II HEP (24 MW) is a run-of-river scheme allotted by the Government of Himachal Pradesh to this Organisation for harnessing the power potential of Tundah Stream (a tributary of Ravi River) which is situated within the jurisdiction of Bharmour and Swai Forest Range(s), Bharmour Forest Division,   (iv). State : Himachal Pradesh   (v). Category of the Proposal : Hydel   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 22345   (viii). Area of forest land proposed for diversion(in ha.): 13.3082   (ix). Non-forest land required for this project(in ha.): 0   (x). Total period for which the forest land is proposed to be diverted(in years): 40
A-2. Details of User Agency
  (i). Name : M/s. Sai Eternal Foundation   (ii). Address1 : Sai Bhawan, Sector-4, New Shimla-9, Himachal Pradesh   (iii). Address2 : NIL   (iv). State : Himachal Pradesh   (v). District : Chamba   (vi). Pin : 171009   (vii). Landmark : Near DAV Public School   (viii). Email address : tundahsai@gmail.com   (ix). Landline Telephone No. : 177-2670349   (x). Fax No. : 177-2672915   (xi). Mobile No. : 9805966110   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : Others
A-3. Details of Person Making Application
  (i). First Name: Vinay   (ii). Middle Name: NIL   (iii). Last Name: Barwal   (iv). Gender: Male   (v). Designation: Assistant General Manager   (vi). Address 1: Sai Bhawan, Sector-4, New Shimla-9, Himachal Pradesh   (vii). Address 2: NIL   (viii). State: Himachal Pradesh   (ix). District: Shimla   (x). Tehsil: Shimla Urban(T)   (xi). Pin: 171009   (xii). Landmark: Near DAV Public School   (xiii). Email Address: tundahsai@gmail.com   (xiv). Landline Telephone No.: 177-2670349   (xv). Fax No.: 01772672915   (xvi). Mobile No.: 9805966110   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Bharmour13.30820
Total13.30820
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Chamba13.30820
Total13.30820
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1MOHAL-TUNDAH (GRAM PANCHAYAT TUNDAH)1.17960
2MOHAL-PLAN (GRAM PANCHAYAT BADGRAN)2.55080
3MOHAL-SIRD (GRAM PANCHAYAT POOLAN)9.21090
4MOHAL-LAHAL (GRAM PANCHAYAT KHANNI)0.36690
Total 13.3082 0
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Diversion Barrage.0.49310
2Intake Structure.0.01980
3Water Conductor System.0.10420
4De-silting Tank.0.19820
5Silt Flushing Channel.0.00970
6Head Race Tunnel-I (HRT-I).0.08970
7Aquaduct.0.0140
8Head Race Tunnel-II (HRT-II).0.24120
9Adit-I.0.01940
10Adit-II.0.04730
11Surge Shaft.0.24780
12Penstock Tunnel.0.6580
13Power House.0.30350
14Switch Yard.0.22250
15Access Tunnel to Dropshaft.0.02910
16Main Access Tunnel.0.03070
17Tail Race Tunnel.0.08120
18Approach Road-I to Barrage Site.0.2030
19Approach Road-II to Barrage Site.1.87930
20Approach Road to Adit-II.0.17130
21Approach Road to Vertical Dropshaft.0.19070
22Approach Road to Power House Site.0.76590
23Store-I.0.37770
24Store-II.0.06070
25Store-III.0.08010
26Store-IV.0.12650
27Ropeway (Loading,Unloading Point & Corridor.0.24230
28Magazine Site.0.32360
29Magazine Guard Hut.0.00510
30Muck Dumping Site-1.0.06070
31Muck Dumping Site-2.0.07080
32Muck Dumping Site-3.0.10920
33Muck Dumping Site-4.0.04550
34Muck Dumping Site-5.0.20780
35Muck Dumping Site-6.0.52540
36Muck Dumping Site-7.0.24270
37Muck Dumping Site-8.0.19420
38Muck Dumping Site-9.0.3540
39Muck Dumping Site-10.0.20230
40Muck Dumping Site-11.0.43690
41Muck Dumping Site-12.0.64740
42Muck Dumping Site-13.0.37940
43Muck Dumping Site-14.0.60270
44Muck Dumping Site-15.0.20870
45Transmission Line (Two Pole Structure & Corridor).1.7848999990
Total 13.308199999 0
C. Maps of forest land proposed to be diverted
Division 1. : Bharmour
  (i). Area of forest land proposed to be diverted(in ha.) : 13.3082   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.13.3082    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 35   (iii). Temporary Employment(Number of person-days): 394200
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: Yes   (a). Copy of Cost-Benefit analysis:
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: No   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii) . Reason for not providing Non-Forest Land: Certificate from Chief Secretary regarding non-availability of suitable non-forest/ revenue forest land
M. Hydel/Irrigation/Multipurpose Project
  (i). Installed power generation capacity of the Project(in MW): 24   (ii). Total command area of the Project(in ha.): 0   (a). Copy of the approval of competent authority to the Catchment Area Treatment Plan (CAT Plan):   (b). Copy of the approved CAT plan:
Additional information Details
Documents
S.No Documents
Remarks
1Part-1
2Detailed Note on Project
3Topo sheet of Project Components
4DGPS Map of Project Components
5Layout Plan and DGPS Map
6Detail of forestland
7Detail of Non-Forest Land
8NAC
9Justification for Locating the Project in Forest Area
10Certificate for minimum use of forestland
11Undertaking for cost of CA
12Undertaking for NPV and additional NPV
13NAC for CA
14Cost Benefit Analysis amended
15Combined revenue papers and field book
16Joint Inspection Report
17NOC from HPPWD
18Distance certificate and comments from Wildlife
19NOC from Gram Panchayats
20Various undertaking
21Detail of village and population to be benefitted
22Detail of road and transmission line
23Combined detail of land
24Allotment Letter
25Techno Economic Clearance
26Capacity enhancement approval from 18 MW to 24 MW
27NOC obtained from IPH Department
28Conditional NOC from Fisheries Department
29Authority Letter
30Re-submission of online proposal for approval
31DOE replied of point no-5 regarding justification of roads
32DC Chamba given clarification for calculation of revenue area as per serial No-9
33Combined documents PDF file
34Demand Letter
35DOE submitted reply regarding Ravi Basin Catchment
36FRA Certificate
37CAT Plan Approval
38Reclamation Plan of Muck Dumping Sites
39Revenue Papers and field Book
40TEC 24 MW Capacity
41Registration and MoA
42Reply of observations raised by CF Chamba as intimated by DFO Bharmour