FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/HP/HYD/44581/2020   (ii). Name of Project for which Forest Land is required : Choj-1   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Choj-1 SHEP located in the Parvati Valley in District Kullu of Himachal Pradesh   (iv). State : Himachal Pradesh   (v). Category of the Proposal : Hydel   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 517.2   (viii). Area of forest land proposed for diversion(in ha.): 0.3442   (ix). Non-forest land required for this project(in ha.): 0   (x). Total period for which the forest land is proposed to be diverted(in years): 40
A-2. Details of User Agency
  (i). Name : M/S TEK SINGH   (ii). Address1 : House No. 123, Ward No. 5,   (iii). Address2 : Ragunathpur Kullu   (iv). State : Himachal Pradesh   (v). District : Kullu   (vi). Pin : 175101   (vii). Landmark : Sultanpur   (viii). Email address : anmoltangri96@gmail.com   (ix). Landline Telephone No. : 1902-239468   (x). Fax No. : 1902-   (xi). Mobile No. : 8527174506   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : Private
A-3. Details of Person Making Application
  (i). First Name: Tilak   (ii). Middle Name: RAJ   (iii). Last Name: Thakur   (iv). Gender: Male   (v). Designation: Director   (vi). Address 1: VPO Bhuthi Tehsil and District Kullu   (vii). Address 2: NIL   (viii). State: Himachal Pradesh   (ix). District: Kullu   (x). Tehsil: Kullu(T)   (xi). Pin: 175102   (xii). Landmark: NIL   (xiii). Email Address: devisinghmandi@gmail.com   (xiv). Landline Telephone No.: 1902-239465   (xv). Fax No.: NIL   (xvi). Mobile No.: 9816650267   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Parbati0.34420
Total0.34420
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Kullu0.34420
Total0.34420
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Choj0.34420
Total 0.3442 0
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Weir0.01980
2Water Channel0.00850
3MD-10.00420
4D-Tank cum Forebay0.02260
5Penstock0.14080
6MD-20.00420
7MD-30.00420
8Power House0.040
9Tail Race0.00220
10MD-40.01420
11Switchyard0.07930
12Interconnection Point0.0040
Total 0.344 0
C. Maps of forest land proposed to be diverted
Division 1. : Parbati
  (i). Area of forest land proposed to be diverted(in ha.) : 0.3442   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.0.3442    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 8   (iii). Temporary Employment(Number of person-days): 25000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : No
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Not Applicable   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Not Applicable   (iii) . Reason for not providing Non-Forest Land: Not Applicable
M. Hydel/Irrigation/Multipurpose Project
  (i). Installed power generation capacity of the Project(in MW): 0.5   (ii). Total command area of the Project(in ha.): 0.3442
Additional information Details
Documents
S.No Documents
Remarks
1Allotment Letter
2Non availability of non forest land certificate
3Non availability of non forest land for compensatory afforestation certificate
4Joint Inspection Report
5Layout Plan of the Project
6Gram Panchayat NOC
7Fisheries NOC
8IPH NOC
9Justification of alignment chosen
10Undertaking of FRA
11Undertaking of NPV
12Undertaking of Add. NPV
13Undertaking of CA
14Certificate for minimum use of forest land
15dumping site
16Wild Life NOC
17Population Detail of the Village
18detail note of the project
19letter to PCCF Dated 04-03-2020
20Undertaking Choj-I TEC & IA
21reply to dfo on dated 21 April 2021
22Reply Latter to DFO
23Wild Life NOC
24reply to DFO Parvati dated 5 Dec. 2022
25Choj-1 FCA Proposal in Single PDF
26Justification regarding Dumping Site
27Power Generation Capacity
28Reclamation Plan and dumping site croos setion
29undertaking regarding no muck will be desposed
30up strem and down stream SHEP digital and toposheet map
31River Basin Study of Beas River
32Reply to The DFO