FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/HP/HYD/44517/2020   (ii). Name of Project for which Forest Land is required : C/O Braguna Small Hydro Project 1.5 MW   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Braguna SHP 1.5 MW is a run of the river scheme which has been envisaged to utilize the water of Braguna Nala for power generation. The scheme involves construction of Project on right bank and Underground Tunnel and Surface Power House falling in Mohal Preena, Kalmla and Mokhri in Sub Tehsil Dharwa   (iv). State : Himachal Pradesh   (v). Category of the Proposal : Hydel   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 1155   (viii). Area of forest land proposed for diversion(in ha.): 0.9854   (ix). Non-forest land required for this project(in ha.): 0   (x). Total period for which the forest land is proposed to be diverted(in years): 40
A-2. Details of User Agency
  (i). Name : M/s Ometa Hydro Power Pvt. Ltd   (ii). Address1 : House no. 73, Raipur khurd, Chandigarh   (iii). Address2 : NIL   (iv). State : Chandigarh   (v). District : Chandigarh   (vi). Pin : 160003   (vii). Landmark : NIL   (viii). Email address : hydroometa@gmail.com   (ix). Landline Telephone No. : 1892-260089   (x). Fax No. : 1892-   (xi). Mobile No. : 9999050497   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : Private
A-3. Details of Person Making Application
  (i). First Name: Ankit   (ii). Middle Name: NIL   (iii). Last Name: Goyal   (iv). Gender: Male   (v). Designation: Manager   (vi). Address 1: 7194 H Block Aerocity   (vii). Address 2: Mohali   (viii). State: Punjab   (ix). District: SAS Nagar   (x). Tehsil: S.A.S.Nagar (Mohali)   (xi). Pin: 140306   (xii). Landmark: NIL   (xiii). Email Address: hydroometa@gmail.com   (xiv). Landline Telephone No.: 11-46094201   (xv). Fax No.: NIL   (xvi). Mobile No.: 9999050497   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Chamba0.98540
Total0.98540
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Chamba0.98540
Total0.98540
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Mokhri0.14920
2Preena0.43580
3Kalmal0.40040
Total 0.9854 0
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Trench wire0.03420
2Feeder channel0.0230
3Desilting tank0.01940
4Diversion channel0.00480
5Flushing pipe0.00320
6Power channel in open0.00560
7Power channel in tunnel0.16510
8Forebay0.00850
9Penstock and Spillway0.04420
10Power house and switch yard0.07650
11Tail race0.00340
12Dumping site0.1380
13Transmission line0.43040
14Approach road to PH0.02910
Total 0.9854 0
C. Maps of forest land proposed to be diverted
Division 1. : Chamba
  (i). Area of forest land proposed to be diverted(in ha.) : 0.9854   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.0.9854    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 8   (iii). Temporary Employment(Number of person-days): 54000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Not Applicable   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Not Applicable   (iii) . Reason for not providing Non-Forest Land: Not Applicable
M. Hydel/Irrigation/Multipurpose Project
  (i). Installed power generation capacity of the Project(in MW): 1.50   (ii). Total command area of the Project(in ha.): 0
Additional information Details
Documents
S.No Documents
Remarks
1Certificate Non Availability of Non Forest Land for project
2Certificate Non Availability of Non Forest Land for CA
3NOC HP.PWD
4NOC IPH
5All NOC
6Certificate of ECO Sensitive Zone
7Village name, code and population
8Consent latter of the project.
9REPLAY
10COMPLETE ALLOTMENT LETTER
11Agreement for Name Change
12implementation agreement
13reclamation plan
14techno economic clearance
15reply letter
16noc of fishri department
17reply
18reply undertaking that no muck silt shall be felled in the nallah river
19evacuation plan
20reply ometa hydero
21transmission plan
22undertaking for balance land
23reply
24glp
25point wise reply
26letter regading satlement of issu of unit of measurment karms in disst chamba
27letter reagding such study of ravi basin
28Joint Inspection Report
29Transmission Line and Road detail
30Component wise land detail.
31EDS reply along with enclosures dated 08.12.2022.
32Undertaking for NPV and Additional NPV.
33Undertaking to pay the cost of CA (by Ometa Hydro)
34Reply of EDS dated on 31.10.2023
35Complete proposal duly signed by Ometa Hydro
36Certificate of Incorporation- of Ometa Hydro Pvt Ltd.
37Tripartite Agreement dated 08.11.2023 Between Banni Hydro and Ometa Hydro Power Pvt. Ltd
38Project capacity Enhancement approval 0.75MW to 1.5MW.
39Online EDS reply of Nodal Officer FCA reply dated 18.06.2024.