FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/HP/HYD/42325/2019   (ii). Name of Project for which Forest Land is required : Kot Dogri (10 MW)   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : The Kot Dogri Small Hydro Electric Project (10 MW) is proposed on Koot Khad a tributory of river Satluj in Tehsil Rampur Distt. Shimla H.P. The scheme envisages diversion of Koot Khad inflows by constructing the 2 diversion weirs, the diverted inflows will be carried through a Head Race Tunnel 2912   (iv). State : Himachal Pradesh   (v). Category of the Proposal : Hydel   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 7560   (viii). Area of forest land proposed for diversion(in ha.): 12.988   (ix). Non-forest land required for this project(in ha.): 0.0514   (x). Total period for which the forest land is proposed to be diverted(in years): 40
A-2. Details of User Agency
  (i). Name : GEE CEE HYDRO POWER PVT LTD   (ii). Address1 : VPO Sarahan Tehsil Rampur   (iii). Address2 : Distt. Shimla, H.P.   (iv). State : Himachal Pradesh   (v). District : Shimla   (vi). Pin : 172001   (vii). Landmark : Near Mata Bhimakali Mandir   (viii). Email address : yashrmp969@gmail.com   (ix). Landline Telephone No. : 1782-234662   (x). Fax No. : 1782-   (xi). Mobile No. : 9418084091   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : Private
A-3. Details of Person Making Application
  (i). First Name: Yashwant   (ii). Middle Name: NIL   (iii). Last Name: Sharma   (iv). Gender: Male   (v). Designation: Liaisoning Officer   (vi). Address 1: Village Bumbeli P.O. Sewra Chandi Tehsil Arki Distt Solan, H.P.   (vii). Address 2: NIL   (viii). State: Himachal Pradesh   (ix). District: Solan   (x). Tehsil: Arki(T)   (xi). Pin: 171102   (xii). Landmark: NIL   (xiii). Email Address: yashrmp969@gmail.com   (xiv). Landline Telephone No.: 1782-234444   (xv). Fax No.: NIL   (xvi). Mobile No.: 9418084091   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Rampur12.9880.0514
Total12.9880.0514
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Shimla12.9880.0514
Total12.9880.0514
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Khiuncha1.87910.0102
2DPF Khiuncha ISt3.15020
3Koot4.89630.0412
4Suru3.06240
Total 12.988 0.0514
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Weir site I0.03360
2Weir site II0.03750
3Desilting Tank II0.01050
4Silt Flushing cum Adit-I0.02160
5Silt Flushing cum Adit-II0.0030
6Silt Flushing cum Adit-III0.01840
7Approach Tunnel-I (Ist weir to Ist D Tank)0.010
8Approach Tunnel-II (IInd weir to IInd D Tank)0.0140
9Underground Tunnel-I0.34930
10Tunnel-II Underground0.80660.0102
11Surge shaft0.010
12Penstock0.27630
13Power House0.10
14Switch Yard0.06250
15Tail Race0.0150
16Muck Dumping I0.10
17Muck Dumping II0.040
18Muck Dumping III0.080
19Muck Dumping IV0.080
20Muck Dumping V0.080
21Approach Road to Power House0.06790
22Pole 1 to 140.02240
23Deslilting Tank-I0.03580
24Transmission line10.71360.0412
Total 12.988 0.0514
C. Maps of forest land proposed to be diverted
Division 1. : Rampur
  (i). Area of forest land proposed to be diverted(in ha.) : 12.988   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.12.988    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 17   (iii). Temporary Employment(Number of person-days): 60000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: Yes   (a). Copy of Cost-Benefit analysis:
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: No   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii) . Reason for not providing Non-Forest Land: Others
M. Hydel/Irrigation/Multipurpose Project
  (i). Installed power generation capacity of the Project(in MW): 10   (ii). Total command area of the Project(in ha.): 0   (a). Copy of the approval of competent authority to the Catchment Area Treatment Plan (CAT Plan):   (b). Copy of the approved CAT plan:
Additional information Details
Documents
S.No Documents
Remarks
1Allotment letter
2Capacity enhancement letter
3Certificate of Minimum use of forest land
4Undertaking Compensatory Afforestation
5Undertaking NPV
6Joint Inspection report
7Non Availability of Non Forest land certificate
8Implementation Agreement
9TEC
10Gram Panchayat NOC
11PWD NOC
12IPH NOC
13Undertaking FRA
14Undertaking Additional NPV
15Undertaking dumping sites
16Undertaking environment damage
17Undertaking not to change proposal later
18Undertaking reclamation of dumping sites
19Undertaking to deposit cost of trees
20Wildlife NOC
21Check List 6
22Check List 7
23Muck Management Plan
24EDS reply
25Undertaking IA and CAT Plan
26Village Benefited Certificate
27Detail of underground and forest land
28Chief Wildlife Warden Certificate
29EDS Reply
30Undertaking Implementation Agreement
31Cat Plan Notification
32Kot Dogri EDS reply 27.03.2021
33DFO WL Sarahan reply regarding Point No. 1 & 2
34Kot Dogri EDs reply 19.12.2022
35List of Projects to be constructed and under progress
36Wildlife Digital Map
37EDS reply 30.11.2023
38EDS 19.12.2023
39EDS Reply 31 January 2024
40EDS reply 27 February 2024
41Layout Plan Road and Transmission
42EDS reply 05 December 2024
43Layout Plan 1 Project Component
44EDS Reply 16 April 2025
45EDS REPLY 22 MAY 2025
46EDS reply 17 june 2025
47EDS reply 03 July 2025