FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A.
General Details
A-1.
Project Details
(i). Proposal No. :
FP/HP/HYD/42325/2019
(ii). Name of Project for which Forest Land is required :
Kot Dogri (10 MW)
(iii). Short narrative of the proposal and Project/scheme for which the forest land is required :
The Kot Dogri Small Hydro Electric Project (10 MW) is proposed on Koot Khad a tributory of river Satluj in Tehsil Rampur Distt. Shimla H.P. The scheme envisages diversion of Koot Khad inflows by constructing the 2 diversion weirs, the diverted inflows will be carried through a Head Race Tunnel 2912
(iv). State :
Himachal Pradesh
(v). Category of the Proposal :
Hydel
(vi). Shape of forest land proposed to be diverted :
Linear
(vii). Estimated cost of the Project(Rupees in lacs) :
7560
(viii). Area of forest land proposed for diversion(in ha.):
12.988
(ix). Non-forest land required for this project(in ha.):
0.0514
(x). Total period for which the forest land is proposed to be diverted(in years):
40
A-2.
Details of User Agency
(i). Name :
GEE CEE HYDRO POWER PVT LTD
(ii). Address1 :
VPO Sarahan Tehsil Rampur
(iii). Address2 :
Distt. Shimla, H.P.
(iv). State :
Himachal Pradesh
(v). District :
Shimla
(vi). Pin :
172001
(vii). Landmark :
Near Mata Bhimakali Mandir
(viii). Email address :
yashrmp969@gmail.com
(ix). Landline Telephone No. :
1782-234662
(x). Fax No. :
1782-
(xi). Mobile No. :
9418084091
(xii). Website (if any) :
NIL
(xiii). Legal status of User Agency :
Private
A-3.
Details of Person Making Application
(i). First Name:
Yashwant
(ii). Middle Name:
NIL
(iii). Last Name:
Sharma
(iv). Gender:
Male
(v). Designation:
Liaisoning Officer
(vi). Address 1:
Village Bumbeli P.O. Sewra Chandi Tehsil Arki Distt Solan, H.P.
(vii). Address 2:
NIL
(viii). State:
Himachal Pradesh
(ix). District:
Solan
(x). Tehsil:
Arki(T)
(xi). Pin:
171102
(xii). Landmark:
NIL
(xiii). Email Address:
yashrmp969@gmail.com
(xiv). Landline Telephone No.:
1782-234444
(xv). Fax No.:
NIL
(xvi). Mobile No.:
9418084091
(xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B.
Details of land required for the Project
B-1.
Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no
Proposal Status.
Proposal No.
Moef File No.
Area Proposed for Diversion(Ha.)
Area Diverted(Ha.)
Date of In-Principle Approval
Date of Final Approval
NIL
B-2.
Details of forest land proposed to be diverted
B-2.1
Details of Divisions involved
Details of Divisions involved
S.no
Division Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Rampur
12.988
0.0514
Total
12.988
0.0514
B-2.2
Details of Districts involved
District wise breakup
S.no
District Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Shimla
12.988
0.0514
Total
12.988
0.0514
B-2.3
Village wise breakup
Villages wise breakup
S.no
Village
Forest Land(ha.)
Non-Forest Land(ha.)
1
Khiuncha
1.8791
0.0102
2
DPF Khiuncha ISt
3.1502
0
3
Koot
4.8963
0.0412
4
Suru
3.0624
0
Total
12.988
0.0514
B-2.4
Component wise breakup
Component wise breakup
S.no
Component
Forest Land(ha.)
Non-Forest Land(ha.)
1
Weir site I
0.0336
0
2
Weir site II
0.0375
0
3
Desilting Tank II
0.0105
0
4
Silt Flushing cum Adit-I
0.0216
0
5
Silt Flushing cum Adit-II
0.003
0
6
Silt Flushing cum Adit-III
0.0184
0
7
Approach Tunnel-I (Ist weir to Ist D Tank)
0.01
0
8
Approach Tunnel-II (IInd weir to IInd D Tank)
0.014
0
9
Underground Tunnel-I
0.3493
0
10
Tunnel-II Underground
0.8066
0.0102
11
Surge shaft
0.01
0
12
Penstock
0.2763
0
13
Power House
0.1
0
14
Switch Yard
0.0625
0
15
Tail Race
0.015
0
16
Muck Dumping I
0.1
0
17
Muck Dumping II
0.04
0
18
Muck Dumping III
0.08
0
19
Muck Dumping IV
0.08
0
20
Muck Dumping V
0.08
0
21
Approach Road to Power House
0.0679
0
22
Pole 1 to 14
0.0224
0
23
Deslilting Tank-I
0.0358
0
24
Transmission line
10.7136
0.0412
Total
12.988
0.0514
C.
Maps of forest land proposed to be diverted
Division 1. : Rampur
(i). Area of forest land proposed to be diverted(in ha.) :
12.988
(ii). Nature of the Project:
Linear
(b). No. of Segments :
One
Segment wise details
Segments
Segment Area(in ha.)
Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.
12.988
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D.
Justification for locating the Project in forest land and details of alternatives examined:
(i). Copy of note containing justification for locating the Project in forest land:
(ii). Whether a copy of map indicating location of alternative examine is required to be provided:
Yes
(a). Copy of map indicating location of alternative examined:
E.
Employment likely to be generated
(i). Whether the Project is likely to generate employment ?:
Yes
(ii). Permanent/Regular Employment(Number of persons):
17
(iii). Temporary Employment(Number of person-days):
60000
F.
Displacement of People due to the Project, if any
(i). Whether Project involves displacement?:
No
G.
Details of Cost-Benefit analysis for the Project
(i). Whether the Project requires Cost-Benefit analysis?:
Yes
(a). Copy of Cost-Benefit analysis:
H.
Status of Environmental Clearance
(i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? :
No
I.
Status of Wildelife Clearance
(i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? :
No
J.
Applicability of special provisions governing Scheduled Areas
(i).Whether the Project or a part thereof is located in a Scheduled Area? :
No
K.
Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
(i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? :
Yes
(a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L.
Details of land identified for Compensatory Afforestation
(i). Whether non-forest or Revenue forest land is required to be provided by User Agency?:
No
(ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?:
No
(iii) . Reason for not providing Non-Forest Land:
Others
M.
Hydel/Irrigation/Multipurpose Project
(i). Installed power generation capacity of the Project(in MW):
10
(ii). Total command area of the Project(in ha.):
0
(a). Copy of the approval of competent authority to the Catchment Area Treatment Plan (CAT Plan):
(b). Copy of the approved CAT plan:
Additional information Details
Documents
S.No
Documents
Remarks
1
Allotment letter
2
Capacity enhancement letter
3
Certificate of Minimum use of forest land
4
Undertaking Compensatory Afforestation
5
Undertaking NPV
6
Joint Inspection report
7
Non Availability of Non Forest land certificate
8
Implementation Agreement
9
TEC
10
Gram Panchayat NOC
11
PWD NOC
12
IPH NOC
13
Undertaking FRA
14
Undertaking Additional NPV
15
Undertaking dumping sites
16
Undertaking environment damage
17
Undertaking not to change proposal later
18
Undertaking reclamation of dumping sites
19
Undertaking to deposit cost of trees
20
Wildlife NOC
21
Check List 6
22
Check List 7
23
Muck Management Plan
24
EDS reply
25
Undertaking IA and CAT Plan
26
Village Benefited Certificate
27
Detail of underground and forest land
28
Chief Wildlife Warden Certificate
29
EDS Reply
30
Undertaking Implementation Agreement
31
Cat Plan Notification
32
Kot Dogri EDS reply 27.03.2021
33
DFO WL Sarahan reply regarding Point No. 1 & 2
34
Kot Dogri EDs reply 19.12.2022
35
List of Projects to be constructed and under progress
36
Wildlife Digital Map
37
EDS reply 30.11.2023
38
EDS 19.12.2023
39
EDS Reply 31 January 2024
40
EDS reply 27 February 2024
41
Layout Plan Road and Transmission
42
EDS reply 05 December 2024
43
Layout Plan 1 Project Component
44
EDS Reply 16 April 2025
45
EDS REPLY 22 MAY 2025
46
EDS reply 17 june 2025
47
EDS reply 03 July 2025