FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/HP/HYD/41533/2019   (ii). Name of Project for which Forest Land is required : Construction of Lower Iku I Small Hydro Project   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Lower Iku - I Small Hydro Project (1 MW) is a run of the river scheme which has been envisaged to utilize the water of Iku Khad for power generation in Tehsil Dharamshala, District Kangra H.P.   (iv). State : Himachal Pradesh   (v). Category of the Proposal : Hydel   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 998   (viii). Area of forest land proposed for diversion(in ha.): 0.5151   (ix). Non-forest land required for this project(in ha.): 0   (x). Total period for which the forest land is proposed to be diverted(in years): 40
A-2. Details of User Agency
  (i). Name : MONGRA HYDRO CONSTRUCTION PRIVATE LIMITED   (ii). Address1 : Ward No. 3 Post Office Yol Jharer   (iii). Address2 : Tehsil Shahpur District Kangra   (iv). State : Himachal Pradesh   (v). District : Kangra   (vi). Pin : 176208   (vii). Landmark : NIL   (viii). Email address : loweriku1@gmail.com   (ix). Landline Telephone No. : 1892-260089   (x). Fax No. : 1892-   (xi). Mobile No. : 9816329668   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : Private
A-3. Details of Person Making Application
  (i). First Name: Jagpravesh   (ii). Middle Name: NIL   (iii). Last Name: Mongra   (iv). Gender: Male   (v). Designation: Director   (vi). Address 1: Ward No. 3 Post Office Yol Jharer   (vii). Address 2: NIL   (viii). State: Himachal Pradesh   (ix). District: Kangra   (x). Tehsil: Shahpur(T)   (xi). Pin: 176208   (xii). Landmark: NIL   (xiii). Email Address: loweriku1@gmail.com   (xiv). Landline Telephone No.: 1892-260089   (xv). Fax No.: NIL   (xvi). Mobile No.: 9816329668   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.D/sala0.51510
Total0.51510
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Kangra0.51510
Total0.51510
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Bagiarra0.34220
2Kand0.17290
Total 0.5151 0
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Weir Site0.0160
2Conveyance Channel0.00180
3Desilting Tank0.01680
4Water Conductor0.0720
5Forebay Tank0.010
6Splillway0.0090
7Penstock0.0890
8Power House0.02250
9Tailrace0.00120
10Road and Transmission0.18220
11Dumping Site I0.0150
12Dumping Site II0.02520
13Dumping Site III0.0150
14Dumping Site IV0.02250
15Dumping Site V0.01690
Total 0.5151 0
C. Maps of forest land proposed to be diverted
Division 1. : D/sala
  (i). Area of forest land proposed to be diverted(in ha.) : 0.5151   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.0.5151    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 6   (iii). Temporary Employment(Number of person-days): 17800
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : No
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Not Applicable   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Not Applicable   (iii) . Reason for not providing Non-Forest Land: Not Applicable
M. Hydel/Irrigation/Multipurpose Project
  (i). Installed power generation capacity of the Project(in MW): 1   (ii). Total command area of the Project(in ha.): 0
Additional information Details
Documents
S.No Documents
Remarks
1DC Certificate No Alternative
2Certificate Non Violation
3DC Certificate Non Availability of CA Land
4Consent Letter
5Tripartite Agreement
6Feasibility Report
7NOC Gram Panchayat
8NOC HPPWD
9NOC IPH Department
10NOC Fisheries Department
11Reply of EDS regarding status of TEC and IA
12Detail Note
13Undertaking to Pay Cost of NPV
14Undertaking to Pay Additional NPV
15Detail of Road and Transmission
16Dimensionwise Detail of Land
17Reclamation Plan
18Undertaking to Submit FRA
19Beneficiary Certificate
20Undertaking to Pay Cost of CA
21Undertaking FRA
22Undertaking to Submit TEC and IA
23Reply to the Observations Nodal Officer
24Statement of Forest Land
25Statement of Non Forest Land
26Joint Inspection Report
27Undertaking to Submit FRA Certificate Before Final Approval
28TEC
29Implementation Agreement
30Reply to EDS Regional Office
31Undertaking Non Violation
32Scanned Proposal I
33Scanned Proposal II
34Scanned Proposal III
35Scanned Proposal IV
36Scanned Proposal V
37Reply to the Observations
38Reply to the Observations
39Layout Plan
40Power Evacuation Plan
41Grid Plan
42Joint Evacuation Agreement
43Undertaking to Comply with NOC IPH Department
44List of Projects and Evacuation Plan in the Valley
45Geo Map with Boundaries of ESZ and distance from HEPs
46Discharge Data and eflow available
47Letter regarding Assessment of Environment issues
48Complete Reply to the Observations IRO Office
49Reply to the Minutes of Meeting of REC Meeting
50Reply IRO