A-1. Project Details
  (i). Proposal No. : FP/HP/HYD/41472/2019   (ii). Name of Project for which Forest Land is required : Construction of Lower Iku Small Hydro Project   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Lower Iku Small Hydro Project 1 MW is a run of the river scheme which has been envisaged to utilize the water of Iku Khad for power generation in Tehsil Dharamshala District Kangra.   (iv). State : Himachal Pradesh   (v). Category of the Proposal : Hydel   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 1016   (viii). Area of forest land proposed for diversion(in ha.): 0.6806   (ix). Non-forest land required for this project(in ha.): 0   (x). Total period for which the forest land is proposed to be diverted(in years): 40
A-2. Details of User Agency
  (i). Name : SANJEEV HYDRO PROJECTS PRIVATE LIMITED   (ii). Address1 : VPO SAUHORA, TEHSIL KANGRA   (iii). Address2 : NIL   (iv). State : Himachal Pradesh   (v). District : Kangra   (vi). Pin : 176001   (vii). Landmark : NIL   (viii). Email address : loweriku@gmail.com   (ix). Landline Telephone No. : 1892-260089   (x). Fax No. : 1892-   (xi). Mobile No. : 9857092895   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : Private
A-3. Details of Person Making Application
  (i). First Name: Sanjeev   (ii). Middle Name: NIL   (iii). Last Name: Kumar   (iv). Gender: Male   (v). Designation: Director   (vi). Address 1: VPO GAGGAL   (vii). Address 2: TEHSIL KANGRA   (viii). State: Himachal Pradesh   (ix). District: Kangra   (x). Tehsil: Kangra(T)   (xi). Pin: 176209   (xii). Landmark: NIL   (xiii). Email Address: loweriku@gmail.com   (xiv). Landline Telephone No.: 1892-260089   (xv). Fax No.: NIL   (xvi). Mobile No.: 9857092895   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.D/sala0.68060
Total0.68060
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Kangra0.68060
Total0.68060
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Bagiarra0.68060
Total 0.6806 0
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Weir Site0.0160
2Conveyance Channel0.0040
3Desilting Tank0.0160
4Water Conductor0.12580
5Forebay Tank0.010
6Spillway0.00760
7Penstock0.02920
8Power House0.030
9Tail Race0.00160
10Road0.26130
11Transmission Line0.1050
12Dumping Site - I0.010
13Dumping Site II0.010
14Dumping Site III0.0110
15Dumping Site IV0.01210
16Dumping Site V0.010
17Dumping Site VI0.010
18Dumping Site VII0.0110
Total 0.6806 0
C. Maps of forest land proposed to be diverted
Division 1. : D/sala
  (i). Area of forest land proposed to be diverted(in ha.) : 0.6806   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.0.6806    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 6   (iii). Temporary Employment(Number of person-days): 18200
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : No
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Not Applicable   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Not Applicable   (iii) . Reason for not providing Non-Forest Land: Not Applicable
M. Hydel/Irrigation/Multipurpose Project
  (i). Installed power generation capacity of the Project(in MW): 1   (ii). Total command area of the Project(in ha.): 0
Additional information Details
Documents
S.No Documents
Remarks
1DC Certificate No Alternative
2Certificate minimum Use
3Undertaking to pay Cost of NPV
4Undertaking to pay Cost of Additional NPV
5Undertaking to Submit FRA Certificate
6Undertaking for Non Violation
7DC Certificate for Non Availability of CA Land
8Allotment Letter
9NOC Gram Panchayat
10NOC HPPWD
11NOC Fisheries Department
12Certificate of Beneficiaries
13Detail Note on Project
14Tripartite Agreement
15NOC IPH Department
16Dimensionwise Detail of Land
17Reclamation Plan
18Certificate Beneficiaries
19Undertaking FRA
20Undertaking to Submit TEC and IA
21Reply to the Observations Nodal Officer
22Detail Note
23Form A Part I
24Detail Of Road and Transmission Line
25Undertaking to Submit FRA Certificate
26TEC
27Implementation Agreement
28Reply to Observations Regional Office
29Statement of Forest Land
30Statement of Non Forest Land
31Alternative Details
32Scanned Proposal I
33Scanned Proposal II
34Scanned Proposal III
35Scanned Proposal IV
36Scanned Proposal V
37Reply to EDS
38Reply the Observations
39Evacuation Plan
40Grid Plan
41Joint Evacuation Agreement
42Undertaking to Comply with NOC IPH
43Revised Layout Plan
44List of Projects and Evacuation Plan in Valley
45Geo Map showing Distance of Projects from ESZ
46Discharge Data and eflow details
47Letter regarding Environment Assessment Measures
48Complete Reply to the Observations IRO Office
49Reply to the Minutes of Meeting of REC Meeting
50Reply to the Observations IRO