FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A.
General Details
A-1.
Project Details
(i). Proposal No. :
FP/HP/HYD/40895/2019
(ii). Name of Project for which Forest Land is required :
Suket Small Hydro Project on Suket Khad
(iii). Short narrative of the proposal and Project/scheme for which the forest land is required :
SHP SUKET is a run of river project having capacity of 1MW in Suketi khad in Mandi Distt. This project will generate 1MW electrical energy to fulfill the power reqirement.
(iv). State :
Himachal Pradesh
(v). Category of the Proposal :
Hydel
(vi). Shape of forest land proposed to be diverted :
Linear
(vii). Estimated cost of the Project(Rupees in lacs) :
880
(viii). Area of forest land proposed for diversion(in ha.):
0.8738
(ix). Non-forest land required for this project(in ha.):
0
(x). Total period for which the forest land is proposed to be diverted(in years):
40
A-2.
Details of User Agency
(i). Name :
SUKET HYDRO
(ii). Address1 :
75/11 Tarna hill Mandi (H.P.)
(iii). Address2 :
NIL
(iv). State :
Himachal Pradesh
(v). District :
Mandi
(vi). Pin :
175001
(vii). Landmark :
near I & Ph. chief office
(viii). Email address :
spydhydro@gmail.com
(ix). Landline Telephone No. :
1905-227111
(x). Fax No. :
1905-
(xi). Mobile No. :
9418501811
(xii). Website (if any) :
NIL
(xiii). Legal status of User Agency :
Private
A-3.
Details of Person Making Application
(i). First Name:
mohan
(ii). Middle Name:
singh
(iii). Last Name:
thakur
(iv). Gender:
Male
(v). Designation:
IPP
(vi). Address 1:
75/11 Tarna hill Mandi (H.P.)
(vii). Address 2:
NIL
(viii). State:
Himachal Pradesh
(ix). District:
Mandi
(x). Tehsil:
Sadar
(xi). Pin:
175001
(xii). Landmark:
JAL Shakti Vibhag
(xiii). Email Address:
spydhydro@gmail.com
(xiv). Landline Telephone No.:
1905-227111
(xv). Fax No.:
NIL
(xvi). Mobile No.:
9418501811
(xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B.
Details of land required for the Project
B-1.
Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no
Proposal Status.
Proposal No.
Moef File No.
Area Proposed for Diversion(Ha.)
Area Diverted(Ha.)
Date of In-Principle Approval
Date of Final Approval
NIL
B-2.
Details of forest land proposed to be diverted
B-2.1
Details of Divisions involved
Details of Divisions involved
S.no
Division Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Mandi
0.8738
0
Total
0.8738
0
B-2.2
Details of Districts involved
District wise breakup
S.no
District Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Mandi
0.8738
0
Total
0.8738
0
B-2.3
Village wise breakup
Villages wise breakup
S.no
Village
Forest Land(ha.)
Non-Forest Land(ha.)
1
Dudar
0.8738
0
Total
0.8738
0
B-2.4
Component wise breakup
Component wise breakup
S.no
Component
Forest Land(ha.)
Non-Forest Land(ha.)
1
Weir site
0.0623016
0
2
Desilting Tank
0.0243
0
3
Water Conductor System
0.33033
0
4
Power House and Switch Yard
0.0378
0
5
Transmission Line
0.019796
0
6
Road upto Power house
0.1223079
0
7
Road upto Water Conductor System
0.109824
0
8
Tailrace Channel
0.0572
0
9
Job Facility Area
0.048489
0
10
Muck Dumping site-1.
0.00429
0
11
Muck Dumping site-2.
0.00429
0
12
Muck Dumping site-3
0.00429
0
13
Muck Dumping site-4
0.00429
0
14
Muck Dumping site-05
0.0056
0
15
Muck Dumping site-06
0.0184041
0
16
Muck Dumping site-07
0.00572572
0
17
Muck Dumping site-08
0.0084084
0
18
Muck Dumping site-09
0.00615
0
Total
0.87379672
0
C.
Maps of forest land proposed to be diverted
Division 1. : Mandi
(i). Area of forest land proposed to be diverted(in ha.) :
0.8738
(ii). Nature of the Project:
Linear
(b). No. of Segments :
One
Segment wise details
Segments
Segment Area(in ha.)
Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.
0.8738
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D.
Justification for locating the Project in forest land and details of alternatives examined:
(i). Copy of note containing justification for locating the Project in forest land:
(ii). Whether a copy of map indicating location of alternative examine is required to be provided:
Yes
(a). Copy of map indicating location of alternative examined:
E.
Employment likely to be generated
(i). Whether the Project is likely to generate employment ?:
Yes
(ii). Permanent/Regular Employment(Number of persons):
7
(iii). Temporary Employment(Number of person-days):
22000
F.
Displacement of People due to the Project, if any
(i). Whether Project involves displacement?:
No
G.
Details of Cost-Benefit analysis for the Project
(i). Whether the Project requires Cost-Benefit analysis?:
No
H.
Status of Environmental Clearance
(i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? :
No
I.
Status of Wildelife Clearance
(i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? :
No
J.
Applicability of special provisions governing Scheduled Areas
(i).Whether the Project or a part thereof is located in a Scheduled Area? :
No
K.
Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
(i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? :
Yes
(a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L.
Details of land identified for Compensatory Afforestation
(i). Whether non-forest or Revenue forest land is required to be provided by User Agency?:
Not Applicable
(ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?:
Not Applicable
(iii) . Reason for not providing Non-Forest Land:
Not Applicable
M.
Hydel/Irrigation/Multipurpose Project
(i). Installed power generation capacity of the Project(in MW):
0
(ii). Total command area of the Project(in ha.):
0
Additional information Details
Documents
S.No
Documents
Remarks
1
Additional NPV undertaking
2
alternate digital map
3
undertaking NPV
4
Form A Part I
5
Joint Inspection Report
6
Minimum use of forest land
7
NAC
8
NOC Panchayat
9
NOC PWD
10
NOC Wildlife
11
Non availability of non forest land
12
Population benefited
13
Consent letter/ allotment letter by HIMURJA
14
Undertaking of CA
15
Muck Management Plan
16
Employment Generation Detail
17
IPH NOC
18
IA UNDERTAKING
19
tec undertaking
20
DETAIL OF DUMPING SITES
21
letter of Interconnection of trnasmission line taping point 11KV
22
proceding Regarding Letter of Intend
23
NAC CA
24
Undertaking TEC
25
Undertaking IA
26
TRANSMISSION LINE DETAIL
27
REVENUE PAPER TATIMA
28
REVENUE PAPER FIELD BOOK
29
GEO REFRENCE MAP
30
CA LAND USE MAP
31
CA DIGITAL TOPO
32
Registration User Agency
33
Component wise Break up
34
layout Plan New
35
Khasra wise Detail components
36
Digital Topo Sheet New 28
37
REPLY EDS IRO REC MEETING
38
EDS Reply CIA and CC study
39
EDS CIA and CCs Study
40
CIA AND CC STUDY
41
EDS MoE & CC, Reply Thereof
Print